{"id":12669,"date":"2013-07-03T17:27:57","date_gmt":"2013-07-03T14:27:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12669"},"modified":"2013-07-03T17:29:06","modified_gmt":"2013-07-03T14:29:06","slug":"barzani-yonetimi-petrol-alacaklarinin-odenmemesine-tepkili","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/barzani-yonetimi-petrol-alacaklarinin-odenmemesine-tepkili\/","title":{"rendered":"(Turkish) Barzani Y\u00f6netimi, Petrol Alacaklar\u0131n\u0131n \u00d6denmemesine Tepkili"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12669\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Barzani Y\u00f6netimi, Ba\u011fdat\u2019\u0131n petrol ihracat\u0131ndan do\u011fan alacaklar\u0131n\u0131 \u00f6dememesine tepkili. K\u00fcrtler, yeni boru hatt\u0131yla bask\u0131s\u0131n\u0131 art\u0131r\u0131yor. K\u00fcrt B\u00f6lgesel Y\u00f6netimi s\u0131n\u0131rlar\u0131 i\u00e7inde \u00fcretilen ham petrol\u00fc T\u00fcrkiye\u2019ye ta\u015f\u0131yacak boru hatt\u0131 i\u00e7in geri say\u0131m s\u00fcr\u00fcyor. G\u00fcnde 200 bin varil ham petrol ta\u015f\u0131yacak hatt\u0131n Eyl\u00fcl ay\u0131na kadar tamamlanmas\u0131 planlan\u0131yor. Tahmini maliyeti 200 milyon dolar olan 281 kilometre uzunlu\u011fundaki boru hatt\u0131 K\u00fcrt B\u00f6lgesel Y\u00f6netimi\u2019nin merkezi h\u00fck\u00fcmete olan ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltacak.<\/strong><\/p>\n<p>T\u00fcrkiye i\u00e7in ise yeni bir enerji koridoru sa\u011flayarak Rusya ve \u0130ran\u2019a petrol ve gaz ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltacak. Her iki taraf da, ABD\u2019nin bu projeden vazge\u00e7meleri yolundaki taleplerinden etkilenmeden yollar\u0131na devam ediyor.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-12175\" title=\"Barzani-y\u00f6netimi-petrol-alacaklar\u0131n\u0131n-\u00f6denmemesine-tepkili\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye-300x190.jpg\" alt=\"\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kuzey-irak-petrol-boru-hatti-turkiye.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Ba\u015fkent Ba\u011fdat\u2019taki enerji yetkilileri boru hatt\u0131n\u0131n tamamlanmas\u0131 halinde bunun a\u011f\u0131r sonu\u00e7lar do\u011faca\u011f\u0131 tehdidini yinelese de, K\u00fcrtlerin petrol ihra\u00e7 etmelerini engelleyecek g\u00fcce sahip de\u011filler.<\/p>\n<h2>2. boru hatt\u0131 m\u0131 geliyor?<\/h2>\n<p>Kerk\u00fck-Ceyhan Boru Hatt\u0131\u2019ndan ge\u00e7en y\u0131l Aral\u0131k ay\u0131na kadar g\u00fcnde 200 bin varil K\u00fcrt petrol\u00fc gidiyordu ancak kuzeyde \u00e7al\u0131\u015fan yabanc\u0131 \u015firketlerin \u00f6demeleri konusunda K\u00fcrt y\u00f6netimi ile Ba\u011fdat aras\u0131nda \u00e7\u0131kan anla\u015fmazl\u0131k nedeniyle bu ihracat kesildi.<\/p>\n<p>K\u00fcrt B\u00f6lgesel Y\u00f6netimi D\u0131\u015f \u0130li\u015fkiler Birimi\u2019nin haz\u0131rlad\u0131\u011f\u0131 bir yay\u0131na g\u00f6re K\u00fcrtler, geri ad\u0131m atmak bir yana g\u00fcnde 500 bin varil petrol ta\u015f\u0131yabilecek ikinci bir boru hatt\u0131 i\u00e7in planlama yap\u0131yor. Ayr\u0131ca ge\u00e7en y\u0131l kabul ettikleri bir yasayla, Ba\u011fdat\u2019\u0131n petrol \u015firketlerinin alacaklar\u0131n\u0131 belirli bir s\u00fcre i\u00e7inde \u00f6dememesi halinde, tek yanl\u0131 olarak petrol ihra\u00e7 edebileceklerini de h\u00fckme ba\u011flad\u0131lar.<\/p>\n<p>Ge\u00e7mi\u015fte Irak\u2019\u0131n petrol ihracat\u0131ndan gelirinin t\u00fcm\u00fcn\u00fc Ba\u011fdat al\u0131r ve bunun y\u00fczde 17\u2019sini K\u00fcrt y\u00f6netimine verirdi. K\u00fcrt yetkililer, \u015fimdilerde ancak y\u00fczde 10\u2019a yak\u0131n bir para ald\u0131klar\u0131n\u0131 belirtti. Bir Irakl\u0131 petrol yetkilisi, ihracat\u0131 ve gelirleri kendi denetledi\u011fi s\u00fcrece merkezi h\u00fck\u00fcmetin boru hatt\u0131na itiraz etmeyece\u011fini s\u00f6yledi. K\u00fcrtler Ba\u011fdat\u2019a \u015fu mesaj\u0131 veriyor: \u201cYa param\u0131z\u0131 \u00f6de ya da T\u00fcrkler \u00f6deyecek.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/07\/03\/barzani-yonetimi-petrol-alacaklarinin-odenmemesine-tepkili\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Barzani Y\u00f6netimi, Ba\u011fdat\u2019\u0131n petrol ihracat\u0131ndan do\u011fan alacaklar\u0131n\u0131 \u00f6dememesine tepkili. K\u00fcrtler, yeni boru hatt\u0131yla bask\u0131s\u0131n\u0131 art\u0131r\u0131yor. K\u00fcrt B\u00f6lgesel Y\u00f6netimi s\u0131n\u0131rlar\u0131 i\u00e7inde \u00fcretilen ham petrol\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12175,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44],"tags":[1535,6549,63,67,165,6553,6386,6551,6550,6554,6552],"views":416,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12669"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12669"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12669\/revisions"}],"predecessor-version":[{"id":12671,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12669\/revisions\/12671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12175"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}