{"id":125784,"date":"2020-12-24T23:55:24","date_gmt":"2020-12-24T20:55:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=125784"},"modified":"2020-12-24T23:57:24","modified_gmt":"2020-12-24T20:57:24","slug":"realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi\/","title":{"rendered":"(Turkish) &#8217;Realkom Tekstil Fabrikas\u0131&#8217; Enerji Verimlili\u011fi \u00c7al\u0131\u015fmalar\u0131n\u0131 H\u0131zland\u0131rd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/125784\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerji verimlili\u011fi \u00e7al\u0131\u015fmalar\u0131na at\u0131k \u0131s\u0131 geri kazan\u0131m projesiyle devam etme karar\u0131 alan Realkom Fabrikas\u0131 \u00f6n\u00fcm\u00fczdeki d\u00f6nemde verimlilik art\u0131r\u0131c\u0131 proje \u00e7al\u0131\u015fmalar\u0131n\u0131 ger\u00e7ekle\u015ftirmeyi s\u00fcrd\u00fcrecek.<\/h1>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-125787\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01.jpg\" alt=\"\" width=\"550\" height=\"356\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01.jpg 861w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01-768x497.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01-500x323.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-01-77x50.jpg 77w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Fabrikaya ilk etapta kurulacak <strong>ekonomizer<\/strong> ve <strong>e\u015fanj\u00f6rl\u00fc \u0131s\u0131 geri kazan\u0131m sistemi 487650 kcal<\/strong> \u0131s\u0131y\u0131 geri kazanacakt\u0131r. Kurulacak sistemde <strong>2<\/strong> adet k\u0131zg\u0131n<strong> ya\u011f e\u015fanj\u00f6r\u00fc<\/strong> ve <strong>1 adet yo\u011fu\u015fmal\u0131 baca gaz\u0131 ekonomizeri<\/strong> bulunmaktad\u0131r. Buhar kazan\u0131ndan at\u0131lan at\u0131k \u0131s\u0131 da dahil olmak \u00fczere sisteme geri kazand\u0131r\u0131lacakt\u0131r. Is\u0131t\u0131lan b\u00fct\u00fcn su kondes tank\u0131nda depolanacakt\u0131r. Bu sayede kuyudan y\u0131kama suyu i\u00e7in \u0131s\u0131t\u0131lmas\u0131 gereken <strong>60 ton<\/strong> su <strong>8\u02daC<\/strong>\u2019de \u0131s\u0131t\u0131larak <strong>20\u02daC<\/strong>\u2019ye getirilecektir. Kurulacak sistemle<strong> 33332 m<\/strong><sup><strong>3<\/strong> <\/sup>do\u011falgaz tasarrufu sa\u011flanacakt\u0131r.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-125788\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2.jpg\" alt=\"\" width=\"550\" height=\"346\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2.jpg 889w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2-768x483.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2-500x314.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/realkom-tekstil-fabrikasi-enerji-verimliligi-calismalarini-hizlandirdi-2-80x50.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Projenin tesise \u00f6zel \u015fekilde kurguland\u0131\u011f\u0131n\u0131 belirten Realkom bak\u0131m m\u00fcd\u00fcr\u00fc <strong>Budak ERDA\u011eLI<\/strong>, verimlilik \u00e7al\u0131\u015fmalar\u0131na <strong>enerji piyasas\u0131<\/strong> ve<strong> y\u00fck algoritmas\u0131<\/strong> ile ba\u015flayarak en do\u011fru <strong>elektrik tedari\u011finin<\/strong> yap\u0131lmaya ba\u015fland\u0131\u011f\u0131n\u0131, \u00f6nlerindeki d\u00f6nemde de tesisin<strong> s\u00fcrd\u00fcr\u00fclebilir<\/strong> ve<strong> operasyonel adam\/saat<\/strong> oran\u0131n\u0131 da olumlu y\u00f6nde etkileyecek \u015fekilde <strong>verimlilik projelerine<\/strong> devam etmek istediklerini belirtti.<\/p>\n<p><strong>Yay\u0131na Haz\u0131rlayan:\u00a0<\/strong>Ferhat AKBABA \/ Enerji Sistemleri M\u00fchendisli\u011fi \u2013\u00a0<a href=\"mailto:akbabaferhat749@gmail.com\" target=\"_blank\" rel=\"nofollow noopener\">akbabaferhat749@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji verimlili\u011fi \u00e7al\u0131\u015fmalar\u0131na at\u0131k \u0131s\u0131 geri kazan\u0131m projesiyle devam etme karar\u0131 alan Realkom Fabrikas\u0131 \u00f6n\u00fcm\u00fczdeki d\u00f6nemde verimlilik art\u0131r\u0131c\u0131 proje \u00e7al\u0131\u015fmalar\u0131n\u0131 ger\u00e7ekle\u015ftirmeyi s\u00fcrd\u00fcrecek. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":125786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,52],"tags":[84020,84016,84018,52259,2384,26559,58103,84019,84021,84017,793,84022],"views":330,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125784"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=125784"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125784\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/125786"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=125784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=125784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=125784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}