{"id":125300,"date":"2020-12-17T16:14:49","date_gmt":"2020-12-17T13:14:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=125300"},"modified":"2020-12-17T16:15:02","modified_gmt":"2020-12-17T13:15:02","slug":"yusufeli-barajinin-tamamlanmasina-son-15-metre","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yusufeli-barajinin-tamamlanmasina-son-15-metre\/","title":{"rendered":"(Turkish) Yusufeli Baraj\u0131&#8217;n\u0131n Tamamlanmas\u0131na Son 15 Metre!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/125300\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131&#8217;ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Yusufeli Baraj\u0131&#8217;nda g\u00fcnl\u00fck ortalama 4 bin 400 metrek\u00fcp beton d\u00f6k\u00fcm\u00fc yap\u0131l\u0131rken g\u00f6vde betonunun ger\u00e7ekle\u015fme oran\u0131\u00a0 ise % 93 seviyesine ula\u015ft\u0131.\u00a0Baraj 275 metre g\u00f6vde y\u00fcksekli\u011fi ile Eyfel Kulesi&#8217;nden <img loading=\"lazy\" class=\"alignright wp-image-125302\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre.jpg 654w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/yusufeli-barajinin-tamamlanmasina-son-15-metre-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>25 metre k\u0131sa olmas\u0131na kar\u015f\u0131n g\u00f6vdesi 100 katl\u0131 bir g\u00f6kdelen y\u00fcksekli\u011fine kar\u015f\u0131l\u0131k geliyor.<\/h1>\n<p><strong>Yusufeli Baraj\u0131<\/strong> ve <strong>HES<\/strong> tesisinin kurulu g\u00fcc\u00fcn\u00fcn <strong>558 megavat<\/strong> ve y\u0131ll\u0131k\u00a0enerji\u00a0\u00fcretiminin <strong>1 milyar 888 milyon kilovatsaat<\/strong> olaca\u011f\u0131n\u0131 dile getiren <em>Tar\u0131m ve Orman Bakan\u0131<\/em> <strong>Bekir Pakdemirli<\/strong>, <strong>santral binas\u0131<\/strong> ve\u00a0<strong>enerji\u00a0yap\u0131lar\u0131nda<\/strong> betonlama \u00e7al\u0131\u015fmalar\u0131n\u0131n planland\u0131\u011f\u0131 \u015fekilde s\u00fcrece\u011fini belirtti.<\/p>\n<p>Ayr\u0131ca Pakdemirli, &#8220;<em>Baraj tamamland\u0131\u011f\u0131nda T\u00fcrkiye&#8217;nin en y\u00fckse\u011fi, d\u00fcnyan\u0131n 3&#8217;\u00fcnc\u00fc y\u00fckse\u011fi olacak ve ekonomiye y\u0131lda <strong>1,5 milyar lira katk\u0131<\/strong> sa\u011flayacak. Proje sayesinde yakla\u015f\u0131k <strong>2,5 milyon n\u00fcfuslu<\/strong> bir \u015fehrin y\u0131ll\u0131k\u00a0enerji\u00a0ihtiyac\u0131 kar\u015f\u0131lanacak.&#8221;<\/em> a\u00e7\u0131klamalar\u0131nda bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131&#8217;ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Yusufeli Baraj\u0131&#8217;nda g\u00fcnl\u00fck ortalama 4 bin 400 metrek\u00fcp beton d\u00f6k\u00fcm\u00fc yap\u0131l\u0131rken g\u00f6vde betonunun ger\u00e7ekle\u015fme oran\u0131\u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":125302,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[52259,26044,45699,54979,41554,77469],"views":175,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125300"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=125300"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125300\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/125302"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=125300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=125300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=125300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}