{"id":125287,"date":"2020-12-17T15:44:34","date_gmt":"2020-12-17T12:44:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=125287"},"modified":"2020-12-17T15:47:24","modified_gmt":"2020-12-17T12:47:24","slug":"salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu\/","title":{"rendered":"(Turkish) &#8217;Salihli Jeotermal Santrali&#8217; TSE Covid-19 G\u00fcvenli \u00dcretim Belgeli \u0130lk JES Oldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/125287\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Sanko Enerji\u2019nin Salihli\u2019de hizmet veren JES1, JES2 ve JES3 jeotermal elektrik santralleri, salg\u0131na kar\u015f\u0131 alm\u0131\u015f oldu\u011fu \u00f6nlemler sayesinde T\u00fcrk Standartlar\u0131 Enstit\u00fcs\u00fc (TSE) taraf\u0131ndan verilen Covid-19 G\u00fcvenli \u00dcretim Belgesi&#8217;ni ald\u0131. Bu belgeyle birlikte Salihli JES, jeotermal enerji sekt\u00f6r\u00fcnde bu belgeyi alan ilk i\u015fletme oldu.<\/h1>\n<p>TSE\u2019nin yay\u0131nlad\u0131\u011f\u0131 <strong>Covid-19\u00a0Hijyen, Enfeksiyon \u00d6nleme ve Kontrol K\u0131lavuzu&#8217;<\/strong>ndaki ko\u015fullar\u0131 sa\u011flamas\u0131 \u00fczerine ba\u015fvurusu kabul edilen<strong> Salihli JES<\/strong>, TSE yetkilileri taraf\u0131ndan kapsaml\u0131 <img loading=\"lazy\" class=\"alignright wp-image-125289\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu-1.jpg\" alt=\"\" width=\"320\" height=\"427\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu-1.jpg 366w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu-1-225x300.jpg 225w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu-1-300x400.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/salihli-jeotermal-santrali-tse-covid-19-guvenli-uretim-belgeli-ilk-jes-oldu-1-38x50.jpg 38w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ve titiz bir \u015fekilde incelendi. Yap\u0131lan de\u011ferlendirmeler sonras\u0131nda, <strong>Salihli JES<\/strong>\u2019in, i\u015f s\u00fcre\u00e7lerini k\u0131lavuzda yer alan standartlara uygun olarak y\u00fcr\u00fctt\u00fc\u011f\u00fc tespit edildi. <strong>TSE<\/strong>\u2019nin bu tespitinin ard\u0131ndan <strong>Salihli JES<\/strong>, <strong>jeotermal enerji sekt\u00f6r\u00fc<\/strong>nde <strong>TSE<\/strong>\u2019nin <strong>uluslararas\u0131 kalite belgesi<\/strong> niteli\u011findeki <strong>Covid-19 G\u00fcvenli \u00dcretim Belgesi&#8217;<\/strong>ni almaya hak kazand\u0131.<\/p>\n<p>Sanko Enerji, salg\u0131n ba\u015flad\u0131\u011f\u0131ndan bu yana, d\u00fczenli aral\u0131klarla ofislerin ve i\u015fletmelerin dezenfekte edilmesi, <em>\u00e7al\u0131\u015fanlara maske da\u011f\u0131t\u0131lmas\u0131, yemekhanelerde tek kullan\u0131ml\u0131k malzeme kullan\u0131lmas\u0131,\u00a0el y\u0131kama ve sosyal mesafe kurallar\u0131n\u0131n s\u00fcrekli hat\u0131rda kalmas\u0131n\u0131 sa\u011flayan\u00a0uyar\u0131 afi\u015flerinin as\u0131lmas\u0131, d\u00f6n\u00fc\u015f\u00fcml\u00fc mesai uygulamas\u0131, uzaktan \u00e7al\u0131\u015fma, toplant\u0131 ve ziyaret\u00e7i k\u0131s\u0131tlanmas\u0131, giri\u015flerde ate\u015f \u00f6l\u00e7\u00fcm\u00fcn\u00fcn yap\u0131lmas\u0131<\/em> gibi <strong>say\u0131s\u0131z \u00f6nlemler<\/strong> ald\u0131.<strong>\u00a0D\u00fcnya Sa\u011fl\u0131k \u00d6rg\u00fct\u00fc<\/strong> ve<strong> Sa\u011fl\u0131k Bakanl\u0131\u011f\u0131<\/strong>&#8216;n\u0131n yay\u0131nlar\u0131n\u0131 takip ederek \u00e7al\u0131\u015fanlar\u0131n\u0131 d\u00fczenli olarak bilgilendirdi.\u00a0Ola\u011fan\u00fcst\u00fc ko\u015fullar\u0131 y\u00f6netebilmek i\u00e7in ilgili departman y\u00f6neticilerinden olu\u015fturdu\u011fu kurul arac\u0131l\u0131\u011f\u0131 ile al\u0131nan \u00f6nlemlerin, <strong>do\u011fru<\/strong> ve<strong> etkin<\/strong> bir \u015fekilde uygulanmas\u0131n\u0131 sa\u011flad\u0131.<\/p>\n<p>Kuruldu\u011fu g\u00fcnden bu yana <strong>yenilenebilir enerji kaynaklar\u0131<\/strong>na yapt\u0131\u011f\u0131 yat\u0131r\u0131mlarla T\u00fcrkiye\u2019nin enerji ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131na \u00f6nemli katk\u0131lar yapan <strong>Sanko Enerji<\/strong>, <strong>Salihli JES<\/strong>\u2019 in ald\u0131\u011f\u0131 bu belgeyle, <strong>\u00e7evreyi<\/strong> ve <strong>\u00e7al\u0131\u015fanlar\u0131n sa\u011fl\u0131\u011f\u0131n\u0131<\/strong> \u00f6n planda tutan bir yakla\u015f\u0131mla \u00fcretim yapt\u0131\u011f\u0131n\u0131 bir kez daha kan\u0131tlam\u0131\u015f oldu.<\/p>\n<p><strong>Manisa<\/strong>\u2019n\u0131n <strong>Salihli il\u00e7esi<\/strong>nde hizmet veren <strong>Salihli JES 1, JES 2<\/strong> ve <strong>JES 3 santralleri<\/strong>nde toplam <strong>69.5 MW<\/strong>\u2019l\u0131k kapasitesiyle yakla\u015f\u0131k<strong> 200 bin konutun<\/strong> elektrik enerjisi ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yor.<\/p>\n<p>Sanko Enerji <strong>Sanibey Hidroelektrik Santrali ve Baraj\u0131<\/strong>, haziran ay\u0131nda <strong>TSE G\u00fcvenli \u00dcretim Belgesi&#8217;<\/strong>ni alarak, enerji sekt\u00f6r\u00fcnde bu belgeyi alan ilk i\u015fletme olmu\u015ftu. <strong>Sanibey<\/strong>\u2019in ard\u0131ndan Sanko Enerjinin <strong>Rize<\/strong>\u2019de faaliyette olan <strong>3 hidroelektrik santrali<\/strong> ve <strong>Tepek\u0131\u015fla Hidroelektrik Santrali<\/strong> de bu belgeyi almaya hak kazanm\u0131\u015flard\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sanko Enerji\u2019nin Salihli\u2019de hizmet veren JES1, JES2 ve JES3 jeotermal elektrik santralleri, salg\u0131na kar\u015f\u0131 alm\u0131\u015f oldu\u011fu \u00f6nlemler sayesinde T\u00fcrk Standartlar\u0131 Enstit\u00fcs\u00fc (TSE) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":125290,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[74239,78257,2112,52259,75973,13865,53925,36184,2204,83558,83557,83560,54979,83559,83561,74242],"views":207,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125287"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=125287"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/125290"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=125287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=125287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=125287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}