{"id":125027,"date":"2020-12-13T09:25:37","date_gmt":"2020-12-13T06:25:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=125027"},"modified":"2020-12-13T09:25:48","modified_gmt":"2020-12-13T06:25:48","slug":"fina-enerji-nin-yeni-resleri-2021-yili-ortasinda-tam-kapasiteye-ulasacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fina-enerji-nin-yeni-resleri-2021-yili-ortasinda-tam-kapasiteye-ulasacak\/","title":{"rendered":"(Turkish) Fina Enerji&#8217;nin Yeni RES&#8217;leri 2021 Y\u0131l\u0131 Ortas\u0131nda Tam Kapasiteye Ula\u015facak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/125027\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>F\u0130BA Grubu taraf\u0131ndan enerji yat\u0131r\u0131m kolu olan Fina Enerji\u2019nin 4 yeni r\u00fczgar enerjisi santrali yat\u0131r\u0131m\u0131n\u0131n 1&#8217;inci fazlar\u0131na y\u00f6nelik kabul i\u015fleminin yap\u0131ld\u0131\u011f\u0131 a\u00e7\u0131klan\u0131rken tamamland\u0131klar\u0131nda ise toplamda 200 MW kurulu g\u00fcce sahip olacak santrallerden Van\u2019daki Ba\u011flama RES 53,2 MW, Bal\u0131kesir\u2019deki Pazark\u00f6y RES 45,6 MW, \u0130stanbul\u2019daki Tayakad\u0131n RES 51 MW ve ve Yalova RES 53,2 kurulu g\u00fc\u00e7lere sahip.<\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-125029\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2.jpg 863w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2-768x433.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/2021-yili-ortasinda-fina-enerjinin-yeni-resleri-tam-kapasiteye-ulasacak-2-80x45.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>F\u0130BA Grubu<\/strong> Y\u00f6netim Kurulu Ba\u015fkan\u0131 <strong>Murat \u00d6zye\u011fin<\/strong> ise yapt\u0131\u011f\u0131 de\u011ferlendirmede <strong>200 milyon dolarl\u0131k yat\u0131r\u0131mla<\/strong> hayata ge\u00e7ecek projelerin <strong>2021 y\u0131l\u0131 ortas\u0131na<\/strong> kadar <strong>tam kapasiteyle<\/strong> devreye al\u0131nmas\u0131n\u0131n hedeflendi\u011fini belirtirken \u00d6zye\u011fin Grubu&#8217;nun \u015fimdiye kadar toplamda <strong>350 MW<\/strong> kurulu g\u00fcce sahip <strong>10 RES<\/strong> ve toplamda <strong>30 MW<\/strong> g\u00fcce sahip<strong> 5 GES<\/strong> yat\u0131r\u0131m\u0131 bulundu\u011fu da a\u00e7\u0131klayan Murat \u00d6zye\u011fin, yeni <strong>4 RES projesi<\/strong>nin de tamamen devreye al\u0131nmas\u0131yla ise\u00a0<strong>yenilenebilir enerji<\/strong> alan\u0131ndaki kurulu g\u00fc\u00e7lerinin <strong>580 MW<\/strong>\u2019a ula\u015faca\u011f\u0131n\u0131 ifade etti.<\/p>\n<p>Santrallerin <strong>1&#8217;inci fazlar\u0131n\u0131n<\/strong> devreye al\u0131nmas\u0131yla ilgili d\u00fczenlemeler kapsam\u0131nda projeler <strong>YEKDEM kapsam\u0131nda<\/strong> mevcut al\u0131m garantilerinden <strong>10 y\u0131ll\u0131k s\u00fcre boyunca<\/strong> yararlanacak olup Santralde <strong>GE T\u00fcrkiye<\/strong> taraf\u0131ndan tedari\u011fi yap\u0131lacak\u00a0<strong>3 MW<\/strong> kurulu g\u00fcce sahip <strong>r\u00fczg\u00e2r t\u00fcrbinleri<\/strong> yer alacak ve t\u00fcrbinlerin kanatlar\u0131 ise\u00a0<strong>GE grubu<\/strong> \u015firketlerinden olan\u00a0<strong>LM Wind Power<\/strong>\u2019\u0131n \u0130zmir\u2019deki fabrikas\u0131nda \u00fcretimi ger\u00e7ekle\u015fecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. F\u0130BA Grubu taraf\u0131ndan enerji yat\u0131r\u0131m kolu olan Fina Enerji\u2019nin 4 yeni r\u00fczgar enerjisi santrali yat\u0131r\u0131m\u0131n\u0131n 1&#8217;inci fazlar\u0131na y\u00f6nelik kabul i\u015fleminin yap\u0131ld\u0131\u011f\u0131 a\u00e7\u0131klan\u0131rken [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":125032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[83034,52259,83033,83416,83417,11092,31843,22961,83415,31301,35002,23137,53282,25754,54979,26130],"views":247,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125027"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=125027"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/125027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/125032"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=125027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=125027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=125027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}