{"id":124910,"date":"2020-12-10T14:31:10","date_gmt":"2020-12-10T11:31:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124910"},"modified":"2020-12-10T14:31:38","modified_gmt":"2020-12-10T11:31:38","slug":"vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor\/","title":{"rendered":"(Turkish) Van\u2019da \u00c7\u00f6pten 14 Bin Hanenin Elektrik T\u00fcketimine Denk Enerji \u00dcretiliyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/124910\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Van\u2019da, 78 hektarl\u0131k \u00e7\u00f6p toplama alan\u0131nda yap-i\u015flet-devret modeliyle faaliyetine ba\u015flayan Kat\u0131 At\u0131k Entegre Tesisi\u2019nde biyogazdan elektrik \u00fcretilirken \u00fcretilen elektrikle 14 bin hanenin enerji t\u00fcketimine <img loading=\"lazy\" class=\"alignright wp-image-124912\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor.jpg 650w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/vanda-copten-14-bin-hanenin-elektrik-tuketimine-denk-enerji-uretiliyor-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>denk \u00fcretim ger\u00e7ekle\u015fiyor.<\/strong><\/h1>\n<p><strong>Van B\u00fcy\u00fck\u015fehir Belediyesi<\/strong>, \u00e7evreyi korumak, <strong>\u00e7\u00f6pten elektrik \u00fcretimi<\/strong> sa\u011flayarak \u00fclke ekonomisine katk\u0131da bulunmak ve istihdam sa\u011flamak amac\u0131na y\u00f6nelik<strong> Kat\u0131 At\u0131k Entegre Tesisi Projesi<\/strong>\u2019ni faaliyete ge\u00e7irdi.<\/p>\n<p>G\u00fcnde ortalama <strong>530 ton \u00e7\u00f6p\u00fcn<\/strong> getirildi\u011fi tesiste, son teknolojik makinelerle ayr\u0131\u015ft\u0131r\u0131lan \u00e7\u00f6plerden elde edilen <strong>biyogaz<\/strong>, elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcrken projenin<strong> 2&#8217;inci a\u015famas\u0131n\u0131n<\/strong> da tamamlanmas\u0131yla <strong>35 bin hanenin elektrik<\/strong> ihtiyac\u0131na denk enerji \u00fcretilmesinin hedeflendi\u011fi projeyle daha \u00f6nce \u00e7\u00f6p\u00fcn biriktirildi\u011fi<strong> 20 hektarl\u0131k alan\u0131n<\/strong> \u0131slah edilmesi \u00e7al\u0131\u015fmalar\u0131 ise s\u00fcrmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Van\u2019da, 78 hektarl\u0131k \u00e7\u00f6p toplama alan\u0131nda yap-i\u015flet-devret modeliyle faaliyetine ba\u015flayan Kat\u0131 At\u0131k Entegre Tesisi\u2019nde biyogazdan elektrik \u00fcretilirken \u00fcretilen elektrikle 14 bin hanenin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124912,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[64246,60675,2880,5070,52259,36825,83328,54979,42691,83329,39393],"views":202,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124910"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124910"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124910\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124912"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}