{"id":124527,"date":"2020-12-03T12:58:17","date_gmt":"2020-12-03T09:58:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124527"},"modified":"2020-12-03T12:58:30","modified_gmt":"2020-12-03T09:58:30","slug":"corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu\/","title":{"rendered":"(Turkish) \u00c7orum\u2019da Ya\u015fayan Kad\u0131n Giri\u015fimci TKDK Deste\u011fiyle G\u00fcne\u015f Santralini Kurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/124527\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>\u00c7orum\u2019da ya\u015fayan Zekiye Tan ve e\u015fi ald\u0131klar\u0131 hibe deste\u011fiyle g\u00fcne\u015f enerjisi santrali kurarak yakla\u015f\u0131k 1000 hanenin elektrik <img loading=\"lazy\" class=\"alignright wp-image-124529\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu.jpg\" alt=\"\" width=\"340\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu.jpg 714w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu-500x342.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/corumda-yasayan-kadin-girisimci-tkdk-destegiyle-gunes-santralini-kurdu-73x50.jpg 73w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen yat\u0131r\u0131mlar\u0131n\u0131 3 y\u0131lda amorti edecek.<\/strong><\/h1>\n<p><strong>TKDK \u0130l Koordinat\u00f6rl\u00fc\u011f\u00fc&#8217;<\/strong>nden <strong>hibe destekleri<\/strong> hakk\u0131nda bilgi alan Tan \u00e7ifti, <strong>hibe destekleri<\/strong>ne ba\u011fl\u0131 <strong>hibe destekleri<\/strong>ndeki <strong>arazi \u00fcst\u00fcne GES yat\u0131r\u0131m\u0131<\/strong> yapmay\u0131 kararla\u015ft\u0131r\u0131rken <strong>TKDK uzmanlar\u0131<\/strong>nda al\u0131nan yard\u0131m ile haz\u0131rlanan\u00a0<strong>2 milyon 200 bin lira<\/strong> b\u00fct\u00e7eli projeleri kabul edilen Tan \u00e7iftine<strong> 1,2 milyon lira hibe deste\u011fi<\/strong> verildi.<\/p>\n<p>Zekiye Tan a\u00e7\u0131klamas\u0131nda;\u00a0\u201cProjemizle <strong>14<\/strong> invert\u00f6r, <strong>1<\/strong> izleme sistemi, <strong>14 bin metre<\/strong> solar kablo ve <strong>3 bin 234<\/strong> solar panel ald\u0131k. Y\u0131ll\u0131k <strong>1,2 milyon kilovatsaatlik<\/strong>\u00a0elektrik \u00fcretimi hedefliyoruz. Mevcut \u00fcretim <strong>sat\u0131\u015f geliri<\/strong> ve <strong>al\u0131nan hibeyle<\/strong> tesisin yakla\u015f\u0131k<strong> 3 y\u0131lda<\/strong> kendini amorti edecektir. <strong>K\u0131rsalda yat\u0131r\u0131m<\/strong> yapmak isteyen herkese <strong>TKDK<\/strong> ile g\u00f6r\u00fc\u015fmeyi tavsiye ediyorum.\u201d ifadelerine yer verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7orum\u2019da ya\u015fayan Zekiye Tan ve e\u015fi ald\u0131klar\u0131 hibe deste\u011fiyle g\u00fcne\u015f enerjisi santrali kurarak yakla\u015f\u0131k 1000 hanenin elektrik ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen yat\u0131r\u0131mlar\u0131n\u0131 3 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,53157,66138,54979,46825],"views":155,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124527"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124527"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124527\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124529"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}