{"id":124442,"date":"2020-12-02T12:20:26","date_gmt":"2020-12-02T09:20:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124442"},"modified":"2020-12-02T12:20:26","modified_gmt":"2020-12-02T09:20:26","slug":"balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor\/","title":{"rendered":"(Turkish) &#8217;Bal\u0131kesir Karesi Belediyesi\u2019nin GES projesi Faaliyetine Ba\u015fl\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/124442\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Bal\u0131kesir Karesi Belediyesi\u2019nin ekonomik g\u00fcc\u00fcn\u00fc art\u0131r\u0131p tasarruf edici \u00e7\u00f6z\u00fcmler bulmaya y\u00f6nelik ba\u015flatt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalardan birisi olan 1 MW g\u00fcce sahip G\u00fcne\u015f Enerjisi <img loading=\"lazy\" class=\"alignright wp-image-124444\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor-1.jpeg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor-1.jpeg 600w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor-1-300x169.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor-1-500x282.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/12\/balikesir-karesi-belediyesinin-ges-projesi-faaliyetine-basliyor-1-80x45.jpeg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Santrali (GES) faaliyetine ba\u015fl\u0131yor.<\/strong><\/h1>\n<p>\u0130HA\u2019n\u0131n haberine g\u00f6re, <strong>Bal\u0131kesir Karesi Belediyesi<\/strong>\u2019nin ekonomik<strong> g\u00fcc\u00fcn\u00fc artt\u0131rmak<\/strong> ve <strong>tasarruf edici \u00e7\u00f6z\u00fcmler<\/strong> bulmak i\u00e7in ba\u015flatt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalardan olan <strong>1 MW<\/strong> g\u00fcc\u00fcndeki <strong>G\u00fcne\u015f Enerjisi Santrali (GES)<\/strong> i\u00e7in art\u0131k g\u00fcn sayd\u0131\u011f\u0131 dile getirildi. \u00d6n\u00fcm\u00fczdeki haftalar i\u00e7inde faaliyete ba\u015flayacak olan<strong> GES<\/strong> ile <strong>Karesi\u2019nin<\/strong> kendi enerjisini \u00fcretecek olup elde edilecek gelirle yap\u0131lan yat\u0131r\u0131m\u0131n<strong> kredisi de \u00f6denecek ve <\/strong>santralin <strong>4 y\u0131lda<\/strong> kendisini <strong>amorti etmesi<\/strong> bekleniyor.<\/p>\n<p><strong>Davutlar Mahallesi<\/strong>\u2019nde <strong>1 MW<\/strong>\u2019l\u0131k kurulu g\u00fc\u00e7te olan <strong>g\u00fcne\u015f enerji santrali kurulumu<\/strong>na y\u00f6nelik \u00e7al\u0131\u015fmalar sona yakla\u015f\u0131rken projenin \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde faaliyete ge\u00e7ece\u011fi bilgisi de verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bal\u0131kesir Karesi Belediyesi\u2019nin ekonomik g\u00fcc\u00fcn\u00fc art\u0131r\u0131p tasarruf edici \u00e7\u00f6z\u00fcmler bulmaya y\u00f6nelik ba\u015flatt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalardan birisi olan 1 MW g\u00fcce sahip G\u00fcne\u015f Enerjisi Santrali [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124444,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[83025,52259,53901,53157,54979],"views":167,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124442"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124442"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124442\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124444"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}