{"id":124343,"date":"2020-11-30T16:44:49","date_gmt":"2020-11-30T13:44:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124343"},"modified":"2020-11-30T16:56:39","modified_gmt":"2020-11-30T13:56:39","slug":"8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali\/","title":{"rendered":"World\u2019s Largest Offshore Wind Farm Seals Financing Deal Worth $8 Billion"},"content":{"rendered":"<p><\/p>\n<h1>A major offshore wind farm, set to be the largest on the planet, took another leap forward Thursday with SSE Renewables and\u00a0Equinor\u00a0announcing the completion of a deal to finance the project.<\/h1>\n<p>Once completed, the Dogger Bank Wind Farm in Britain \u2014 a 50<img loading=\"lazy\" class=\"alignright wp-image-124345\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali.jpg\" alt=\"\" width=\"320\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali.jpg 620w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/8-milyar-dolarlik-dunyanin-en-buyuk-deniz-ustu-ruzgar-santrali-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>:50 joint venture between the two firms \u2014 will have a total capacity of 3.6 gigawatts (GW).<\/p>\n<p>The first two phases, Dogger Bank A and Dogger Bank B, will be built simultaneously, with each having a capacity of 1.2 GW.<\/p>\n<p>The third phase of the project, Dogger Bank C, is being developed to a different schedule, with a financial close expected toward the end of 2021.<\/p>\n<p>In a statement,\u00a0<strong>SSE\u00a0<\/strong>said funding for the first two phases of the project represented \u201cthe largest ever offshore wind project financing anywhere in the world.\u201d Investment for Dogger Bank A and B will amount to approximately<strong> \u00a36 billion<\/strong> (around $8 billion), it added.<\/p>\n<p>According to the website of the <strong>Dogger Bank project<\/strong>, which will be located in waters off the northeast coast of England, the final group of lenders is made up of <strong>29 banks<\/strong> and three export credit agencies. <strong>SSE Renewables<\/strong> is heading up construction of the facility, while its operations are to be led by Equinor.<\/p>\n<p>The scale of the overall scheme, which is due to be finished in<strong> 2026<\/strong>, is considerable. <strong>Equinor<\/strong> and <strong>SSE<\/strong> have both described it as the \u201cworld\u2019s biggest <strong>offshore wind farm<\/strong>.\u201d<\/p>\n<p>Source:\u00a0<a href=\"https:\/\/www.cnbc.com\/2020\/11\/26\/worlds-largest-offshore-wind-farm-seals-8-billion-financing-deal.html\" target=\"_blank\" rel=\"nofollow noopener\">CNBC<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>A major offshore wind farm, set to be the largest on the planet, took another leap forward Thursday with SSE Renewables and\u00a0Equinor\u00a0announcing the completion of a deal to finance the project. Once completed, the Dogger Bank Wind Farm in Britain \u2014 a 50:50 joint venture between the two firms \u2014 will have a total capacity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124345,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[66250,82939,82943,82942,40747,82940,82945,43643,77707,52379,52259,46159,75708,82944,53282,82941,54979,51052,78344],"views":267,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124343"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124343"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124343\/revisions"}],"predecessor-version":[{"id":124349,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124343\/revisions\/124349"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124345"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}