{"id":124270,"date":"2020-11-29T15:32:39","date_gmt":"2020-11-29T12:32:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124270"},"modified":"2020-11-29T15:38:25","modified_gmt":"2020-11-29T12:38:25","slug":"osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi\/","title":{"rendered":"(Turkish) &#8217;Osmaniye&#8217;deki G\u00fcne\u015f Enerjisi Yat\u0131r\u0131m\u0131 Hizmete Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/124270\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Osmaniye\u2019de yap\u0131m\u0131 tamamlanan G\u00fcne\u015f Enerji Santralinin a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan\u00a0<img loading=\"lazy\" class=\"alignright wp-image-124273\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi.jpg 620w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/osmaniye-deki-gunes-enerjisi-yatirimi-hizmete-girdi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>t\u00f6renle hizmete a\u00e7\u0131ld\u0131.<\/h1>\n<p><strong>Osmaniye \u0130l \u00d6zel \u0130daresi<\/strong>&#8216;nce g\u00fcne\u015ften elektrik \u00fcretimine y\u00f6nelik\u00a0<strong>Cevdetiye kasabas\u0131<\/strong>na yap\u0131lan <strong>G\u00fcne\u015f Enerji Santrali&#8217;<\/strong>nin a\u00e7\u0131l\u0131\u015f\u0131 Vali <strong>Erdin\u00e7 Y\u0131lmaz<\/strong>, Milletvekilleri <strong>M\u00fccahit Durmu\u015fo\u011flu<\/strong> ve <strong>\u0130smail Kaya<\/strong> taraf\u0131ndan yap\u0131ld\u0131. \u0130\u00e7erisinde<strong> 3 bin 640 adet<\/strong> g\u00fcne\u015f panelinin kullan\u0131ld\u0131\u011f\u0131 <strong>elektrik \u00fcretim tesisi<\/strong>ni gezen protokol \u00fcyelerine tesis hakk\u0131nda yetkililer bilgi verdi.<\/p>\n<p>Di\u011fer yandan <strong>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan <strong>\u0130l \u00d6zel \u0130daresi<\/strong>ne hibe edilen <strong>D\u00fczi\u00e7i, Kadirli<\/strong> ve <strong>Sumbas<\/strong> il\u00e7elerinde hizmet verecek olan<strong> 3<\/strong> adet \u00e7\u00f6p toplama arac\u0131, <strong>2<\/strong> adet <strong>vidanj\u00f6r<\/strong> ve <strong>1813<\/strong> <strong>\u00e7\u00f6p konteyn\u0131r\u0131 da<\/strong> hizmet vermeye ba\u015flad\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Osmaniye\u2019de yap\u0131m\u0131 tamamlanan G\u00fcne\u015f Enerji Santralinin a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan\u00a0t\u00f6renle hizmete a\u00e7\u0131ld\u0131. Osmaniye \u0130l \u00d6zel \u0130daresi&#8216;nce g\u00fcne\u015ften elektrik \u00fcretimine y\u00f6nelik\u00a0Cevdetiye kasabas\u0131na yap\u0131lan G\u00fcne\u015f Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124273,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[82864,2199,53114,260,52259,6014,53157,82863,54979],"views":214,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124270"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124270"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124270\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124273"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}