{"id":124154,"date":"2020-11-26T12:47:37","date_gmt":"2020-11-26T09:47:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=124154"},"modified":"2020-11-26T12:47:37","modified_gmt":"2020-11-26T09:47:37","slug":"eti-aluminyum-fabrikasinin-enerjisi-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten\/","title":{"rendered":"(Turkish) &#8217;ET\u0130 Al\u00fcminyum&#8217; Fabrikas\u0131&#8217;n\u0131n Enerjisi G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/124154\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ET\u0130 Al\u00fcminyum, Konya\u2019n\u0131n Seydi\u015fehir il\u00e7esinde 621 bin 500 m2\u2019lik bir alana g\u00fcne\u015f <img loading=\"lazy\" class=\"alignright wp-image-124157\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten.jpg 997w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten-300x175.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten-768x448.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten-500x291.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/eti-aluminyum-fabrikasinin-enerjisi-gunes-ten-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>enerjisi santrali kurulumu yapacak.<\/strong><\/h1>\n<p><strong>37,8 MW<\/strong> kapasiteye sahip\u00a0<strong>ET\u0130 G\u00fcne\u015f Enerjisi Santrali<\/strong>\u2019nin \u00fcretece\u011fi elektrik, \u015firketin fabrikas\u0131n\u0131n enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya y\u00f6nelik kullan\u0131lacak. <strong>18,5 milyon dolar<\/strong> de\u011ferindeki proje, daha \u00f6nce <strong>13,2 MW<\/strong> olarak planlanan <strong>ET\u0130 GES Projesi<\/strong>\u2019nin <strong>2&#8217;inci etab\u0131<\/strong> olarak planlan\u0131rken\u00a0<strong>kapasite art\u0131\u015f\u0131 projesi<\/strong> olarak belirlenmi\u015ftir.<\/p>\n<p>Proje \u00e7er\u00e7evesinde \u00fcretilecek olan elektrik<strong> ET\u0130 Seydi\u015fehir Entegre Al\u00fcminyum Tesisi<\/strong>\u2019nin <strong>i\u00e7 t\u00fcketimini kar\u015f\u0131lamak<\/strong> amac\u0131 ile <strong>66 milyon 400 bin KWh<\/strong> \u00fcretilmesi planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ET\u0130 Al\u00fcminyum, Konya\u2019n\u0131n Seydi\u015fehir il\u00e7esinde 621 bin 500 m2\u2019lik bir alana g\u00fcne\u015f enerjisi santrali kurulumu yapacak. 37,8 MW kapasiteye sahip\u00a0ET\u0130 G\u00fcne\u015f Enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":124157,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,82748,82747,82749,53157],"views":231,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124154"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=124154"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/124154\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/124157"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=124154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=124154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=124154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}