{"id":123814,"date":"2020-11-19T13:51:37","date_gmt":"2020-11-19T10:51:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=123814"},"modified":"2020-11-19T13:55:14","modified_gmt":"2020-11-19T10:55:14","slug":"akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin 3&#8217;\u00fcnc\u00fc G\u00fc\u00e7 \u00dcnitesinin \u0130n\u015faat Lisans\u0131 Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/123814\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>N\u00fckleer D\u00fczenleme Kurulu (NDK) taraf\u0131ndan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin(NGS) \u00fc\u00e7\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinin in\u015faat lisans\u0131 verildi. AKKUYU N\u00dcKLEER A.\u015e.\u2019nin 28 Mart 2019 tarihinde yapt\u0131\u011f\u0131 ba\u015fvuru dosyas\u0131n\u0131 inceleyen NDK, 13 Kas\u0131m 2020 tarih ve 2020-71\/2-1 say\u0131l\u0131 karar\u0131yla Akkuyu NGS\u2019nin 3&#8217;\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinin in\u015faat lisans\u0131n\u0131 onaylad\u0131.<\/h1>\n<p><strong>\u0130n\u015faat lisans\u0131<\/strong> ile birlikte <strong>3&#8217;\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi<\/strong>nin <strong>reakt\u00f6r<\/strong> ve <strong>t\u00fcrbin binalar\u0131<\/strong> gibi <strong>n\u00fckleer g\u00fcvenlik<\/strong> kapsam\u0131ndaki t\u00fcm yap\u0131lar\u0131n in\u015faat\u0131na ve n\u00fckleer g\u00fcvenlikle alakal\u0131 sistem ve ekipmanlar\u0131n montaj\u0131na ba\u015flanabilecek. <strong>3&#8217;\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi<\/strong>nin <strong>\u2018S\u0131n\u0131rl\u0131 \u00c7al\u0131\u015fma \u0130zni\u2019<\/strong> ise <strong>23 Temmuz 2020<\/strong> <img loading=\"lazy\" class=\"alignright wp-image-123816\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi-2.jpg\" alt=\"\" width=\"320\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi-2.jpg 765w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi-2-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi-2-500x279.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/akkuyu-ngsnin-3uncu-guc-unitesinin-insaat-lisansi-alindi-2-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tarihinde onaylanm\u0131\u015ft\u0131.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e.,<\/strong> Kamu Kurumlar\u0131 ile \u0130li\u015fkiler ve Uluslararas\u0131 \u0130\u015fbirli\u011fi Y\u00f6netici Direkt\u00f6r\u00fc <strong>\u0410leksei Frolov<\/strong> yapt\u0131\u011f\u0131 de\u011ferlendirmede, <em>\u201c\u0130n\u015faat lisans\u0131n\u0131n al\u0131nmas\u0131, g\u00fc\u00e7 \u00fcnitesinin in\u015faat\u0131na ba\u015flanabilmesi i\u00e7in gerekli olan son izin a\u015famas\u0131d\u0131r. Ba\u015fvuru dok\u00fcman\u0131n\u0131n haz\u0131rlanmas\u0131n\u0131n yan\u0131 s\u0131ra inceleme s\u00fcrecinde NDK\u2019n\u0131n sorular\u0131na verilecek yan\u0131tlarla ilgili olarak tasar\u0131m kurulu\u015flar\u0131yla birlikte \u00e7ok kapsaml\u0131 ve detayl\u0131 \u00e7al\u0131\u015fmalar yapt\u0131k. NDK, in\u015faat lisans\u0131n\u0131 vererek, Akkuyu NGS\u2019deki \u00fc\u00e7\u00fcnc\u00fc \u00fcnitenin in\u015faat ve montaj i\u015flerini d\u00fczenleyen t\u00fcm yasal gerekliliklere ve standartlara uyuldu\u011funu teyit etmektedir. \u015eu anda daha \u00f6nce al\u0131nan s\u0131n\u0131rl\u0131 \u00e7al\u0131\u015fma izni kapsam\u0131nda Akkuyu NGS \u00fc\u00e7\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi reakt\u00f6r binas\u0131n\u0131n ve t\u00fcrbin binas\u0131n\u0131n temel alt\u0131 beton \u00e7al\u0131\u015fmalar\u0131 tamamlanmakta olup, bunun ard\u0131ndan ger\u00e7ekle\u015ftirilecek donat\u0131 \u00e7al\u0131\u015fmalar\u0131 sonras\u0131 ald\u0131\u011f\u0131m\u0131z lisansa istinaden temel betonu yap\u0131m \u00e7al\u0131\u015fmalar\u0131na ba\u015flayaca\u011f\u0131z\u201d <\/em>ifadelerini kulland\u0131.<\/p>\n<p><strong>Akkuyu NGS Projesi<\/strong>\u2019nde <strong>\u00c7ED Raporu Onay\u0131<\/strong>, Elektrik \u00dcretim Lisans\u0131, <strong>birinci, ikinci <\/strong>ve <strong>\u00fc\u00e7\u00fcnc\u00fc<\/strong> <strong>g\u00fc\u00e7 \u00fcniteleri<\/strong>nin <strong>in\u015faat lisanslar\u0131<\/strong> ve <strong>Do\u011fu Kargo Terminali Ge\u00e7ici \u0130\u015fletme \u0130zni<\/strong> gibi ana lisanslar ve izinlerin tamamland\u0131\u011f\u0131 kaydedildi. <strong>4&#8217;\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi<\/strong>nin in\u015faat lisans\u0131n\u0131n al\u0131nmas\u0131 i\u00e7in haz\u0131rlanan ba\u015fvuru dosyas\u0131n\u0131n da <strong>12 May\u0131s 2020<\/strong> tarihinde NDK\u2019ya sunuldu\u011fu, <strong>inceleme s\u00fcrecinin devam etti\u011fi<\/strong> bildirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. N\u00fckleer D\u00fczenleme Kurulu (NDK) taraf\u0131ndan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin(NGS) \u00fc\u00e7\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinin in\u015faat lisans\u0131 verildi. AKKUYU N\u00dcKLEER A.\u015e.\u2019nin 28 Mart 2019 tarihinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123817,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[82545,13232,20867,69230,52259,37266,82546,53348,82547],"views":148,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123814"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=123814"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123814\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/123817"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=123814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=123814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=123814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}