{"id":123701,"date":"2020-11-17T15:12:53","date_gmt":"2020-11-17T12:12:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=123701"},"modified":"2020-11-17T15:46:56","modified_gmt":"2020-11-17T12:46:56","slug":"orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi\/","title":{"rendered":"(Turkish) &#8217;Orbit Enerji&#8217; U\u00e7ak Karde\u015fler\u2019in GES Projesini Tamamlayarak Devreye Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/123701\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Ya\u015f Meyve Sebze T\u00fcrkiye \u0130hracat \u015eampiyonu U\u00e7ak Karde\u015fler\u2019in 3.1 MW \u00c7at\u0131 Ges Projesini Orbit Enerji hayata ge\u00e7irdi.<img loading=\"lazy\" class=\"alignright wp-image-123703\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi.jpg\" alt=\"\" width=\"320\" height=\"301\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi.jpg 519w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi-300x282.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi-425x400.jpg 425w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/orbit-enerji-ucak-kardeslerin-ges-projesini-tamamlayarak-faaliyete-gecirdi-500x470.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>B\u00fcnyesinde ihtiya\u00e7 duydu\u011fu<strong> elektrik enerjisi<\/strong>ni <strong>yenilenebilir enerji kaynaklar\u0131<\/strong>ndan kar\u015f\u0131lamak \u00fczere,<strong> karbon ayak izini s\u0131f\u0131rlama<\/strong> karar\u0131 alan <strong>U\u00e7ak Karde\u015fler<\/strong>\u2019in <strong>G\u00fcne\u015f Enerjisi Santrali kurulumu<\/strong>, <strong>EPC s\u00fcre\u00e7leri<\/strong>nde tek bir vekalet ile anahtar teslim hizmet veren<strong> Orbit Enerji<\/strong> taraf\u0131ndan yap\u0131ld\u0131.<\/p>\n<p><strong>Orbit Enerji<\/strong>\u2019den yap\u0131lan a\u00e7\u0131klamada, toplam da\u00a0<strong>3136 kwp<\/strong> kapasiteye sahip projede, Orbit Enerji <strong>G\u00fcne\u015f M\u00fchendisleri<\/strong>, kapsaml\u0131 ve ayr\u0131nt\u0131l\u0131 verimlilik analizleri yapt\u0131. Santralin yap\u0131m\u0131nda dikkat edilmesi gereken <strong>en \u00f6nemli kriterin y\u00fcksek performans<\/strong> oran\u0131 oldu\u011funu da belirten<strong>\u00a0Orbit Enerji ekibi<\/strong>, bu oran\u0131n ancak <strong>m\u00fchendislik<\/strong> ve <strong>bilimin<\/strong> getirdi\u011fi gereksinimler kapsam\u0131nda yap\u0131lan <strong>tasar\u0131m, kaliteli malzeme<\/strong> ve<strong> i\u015f\u00e7ilikle<\/strong> yakalanabilece\u011fi vurguland\u0131.<\/p>\n<p>Kalitenin asl\u0131nda <strong>g\u00f6r\u00fcnmeyen yerlerde<\/strong> ve <strong>ayr\u0131nt\u0131larda gizli<\/strong> oldu\u011funu belirten <strong>Orbit Enerji<\/strong> yetkilileri, yat\u0131r\u0131m plan\u0131nda <strong>#orbit\u00e7at\u0131ges<\/strong> se\u00e7en <strong>\u0130zmir<\/strong> firmalar\u0131ndan <strong>U\u00e7ak Karde\u015fler<\/strong>\u2019e bol <strong>g\u00fcne\u015fli g\u00fcnler<\/strong> dileyerek bu \u00e7evreci kararlar\u0131ndan <strong>\u00f6t\u00fcr\u00fc kendilerini<\/strong> kutlad\u0131 ve di\u011fer sanayicileri de benzer \u015fekilde <strong>s\u00fcrd\u00fcr\u00fclebilir bir gelecek<\/strong> in\u015fa etmeye davet etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ya\u015f Meyve Sebze T\u00fcrkiye \u0130hracat \u015eampiyonu U\u00e7ak Karde\u015fler\u2019in 3.1 MW \u00c7at\u0131 Ges Projesini Orbit Enerji hayata ge\u00e7irdi. B\u00fcnyesinde ihtiya\u00e7 duydu\u011fu elektrik enerjisini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123703,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[82466,71548,5070,52259,82467,21768,53157,80855,82465,82468,57125,37032,54979,82464],"views":186,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123701"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=123701"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123701\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/123703"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=123701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=123701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=123701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}