{"id":123688,"date":"2020-11-17T13:52:53","date_gmt":"2020-11-17T10:52:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=123688"},"modified":"2020-11-17T13:57:35","modified_gmt":"2020-11-17T10:57:35","slug":"zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi\/","title":{"rendered":"(Turkish) Zorlu Enerji\u2019nin Filistin\u2019deki Dead Sea G\u00fcne\u015f Enerji Santrali Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/123688\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Zorlu Enerji\u2019nin % 75, JDECO\u2019nun % 25 oran\u0131nda ortakl\u0131\u011f\u0131yla kurulan ZJ Strong giri\u015fim \u015firketi Filistin\u2019in Jericho b\u00f6lgesinde toplam 1,998 MWp<\/strong> <strong>kurulu g\u00fcce sahip Dead Sea G\u00fcne\u015f Enerji Santrali\u2019ni devreye ald\u0131. A\u011fustos 2019\u2019da yap\u0131lan anla\u015fma \u00e7er\u00e7evesinde Zorlu Enerji, ZJ Strong <img loading=\"lazy\" class=\"alignright wp-image-123694\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi.jpg\" alt=\"\" width=\"320\" height=\"457\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi.jpg 342w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi-210x300.jpg 210w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi-280x400.jpg 280w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/zorlu-enerji-nin-filistindeki-dead-sea-gunes-enerji-santrali-devreye-alindi-35x50.jpg 35w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u015firketiyle g\u00fcne\u015f enerjisi santralini kurdu ve santralden \u00fcretilen elektrik 25 y\u0131l boyunca garantili fiyattan JDECO\u2019ya sat\u0131lacak.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019nin <strong>yerli<\/strong> ve <strong>yenilenebilir enerji<\/strong> alan\u0131ndaki \u00f6nc\u00fclerinden <strong>Zorlu Enerji<\/strong> ile Filistin\u2019in elektri\u011finin <strong>% 25<\/strong>\u2019ini da\u011f\u0131tan elektrik da\u011f\u0131t\u0131m \u015firketi <strong>JDECO (Jerusalem District Electricity Co. Ltd.)<\/strong>, b\u00f6lgeye elektrik sa\u011flamak amac\u0131yla 2019\u2019un <strong>a\u011fustos ay\u0131nda<\/strong> bir anla\u015fma imzalam\u0131\u015ft\u0131. Anla\u015fma kapsam\u0131nda Filistin\u2019in Jericho b\u00f6lgesinde toplam <strong>1.998 MWp<\/strong> kurulu g\u00fcce sahip <strong>Dead Sea G\u00fcne\u015f Enerji Santrali<\/strong>\u2019ni devreye alan Zorlu Enerji, <strong>ZJ Strong<\/strong> \u015firketiyle <strong>g\u00fcne\u015f santralinden<\/strong> \u00fcretilen elektri\u011fi <strong>25 y\u0131l<\/strong> boyunca garantili fiyattan<strong> JDECO<\/strong>\u2019ya satacak.<\/p>\n<p>Konuya y\u00f6nelik a\u00e7\u0131klamada bulunan <strong>Zorlu Enerji CEO\u2019su Sinan Ak<\/strong>; \u2018<em>Zorlu Enerji olarak 25 y\u0131l\u0131 a\u015fk\u0131n bilgi birikimi ve deneyimimizi yenilenebilir enerji projeleriyle yurt d\u0131\u015f\u0131na ta\u015f\u0131maya devam ediyoruz. Bu vizyon do\u011frultusunda b\u00f6lgenin enerji ihtiyac\u0131n\u0131 g\u00fcne\u015f santralleriyle kar\u015f\u0131lamak \u00fczere JDECO ortakl\u0131\u011f\u0131yla kurdu\u011fumuz Z<strong>J Strong (ZJ Strong Energy For Renewable Energy Ltd. Co)<\/strong> \u015firketimiz toplamda <strong>1,998 MWp<\/strong> kurulu g\u00fcce sahip <strong>Dead Sea G\u00fcne\u015f Enerji Santrali<\/strong>\u2019ni <strong>Filistin<\/strong>\u2019in <strong>Jericho<\/strong> b\u00f6lgesinde devreye ald\u0131. Yeni yat\u0131r\u0131m\u0131m\u0131z\u0131n mutlulu\u011funu ya\u015farken<strong> Zorlu Enerji<\/strong> olarak g\u00fcne\u015f ba\u015fta olmak \u00fczere farkl\u0131 <strong>yenilenebilir enerji projeleri<\/strong>mizle yurt i\u00e7i ve yurt d\u0131\u015f\u0131nda b\u00fcy\u00fcmek ve uluslararas\u0131 g\u00fcc\u00fcm\u00fcz\u00fc daha da art\u0131rmak istiyoruz.<\/em>\u2019 dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Zorlu Enerji\u2019nin % 75, JDECO\u2019nun % 25 oran\u0131nda ortakl\u0131\u011f\u0131yla kurulan ZJ Strong giri\u015fim \u015firketi Filistin\u2019in Jericho b\u00f6lgesinde toplam 1,998 MWp kurulu g\u00fcce [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123691,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[82453,5070,35038,2569,82455,34645,82454,3866,55796,82456,80485],"views":103,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123688"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=123688"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123688\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/123691"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=123688"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=123688"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=123688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}