{"id":123120,"date":"2020-11-06T13:52:31","date_gmt":"2020-11-06T10:52:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=123120"},"modified":"2020-11-07T10:46:24","modified_gmt":"2020-11-07T07:46:24","slug":"sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi\/","title":{"rendered":"(Turkish) &#8217;Sivas OSB&#8217; G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimine Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/123120\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<blockquote><p><strong>Sivas Organize Sanayi B\u00f6lgesi&#8217;nde G\u00fcne\u015f Enerjisinden elektrik \u00fcretimi i\u00e7in g\u00fcne\u015f <img loading=\"lazy\" class=\"alignright wp-image-123122\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/sivas-osb-gunes-enerjisi-nden-elektrik-uretimi-ne-basladi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>santral\u00a0 3 bin 652 adet mono kristal tip fotovoltaik panel kullan\u0131larak 16 d\u00f6n\u00fcm arazi \u00fczerine kuruldu.<\/strong><\/p><\/blockquote>\n<p><strong>Organize Sanayi B\u00f6lgesi&#8217;<\/strong>nde t\u00fcketilen <strong>24 Megawatsaatlik<\/strong>\u00a0enerjinin<strong> 1 Megawatsaati kurulan<\/strong>\u00a0<strong>g\u00fcne\u015f santralinden<\/strong> kar\u015f\u0131lanacak olup al\u0131nan bilgiye g\u00f6re, kullan\u0131lan enerjinin <strong>% 5\u2019<\/strong>ine kar\u015f\u0131l\u0131k gelecek g\u00fcne\u015f santralinin zaman i\u00e7inde kapasitesi art\u0131r\u0131lacak.<\/p>\n<p><strong>Elektrik kesintileri<\/strong>ne an\u0131nda <strong>m\u00fcdahale edilmesi<\/strong>ne y\u00f6nelik <strong>Scada sistemi<\/strong>ne de ge\u00e7ilmesinin planland\u0131\u011f\u0131 <strong>OSB<\/strong>&#8216;de <strong>t\u00fcm enerji hatlar\u0131<\/strong>n\u0131n<strong> scada sistemi<\/strong>ne ge\u00e7irilmesinin ard\u0131ndan kesintiler en aza indirilecek. B\u00f6lgedeki<strong> elektrik hatlar\u0131 da yer alt\u0131na<\/strong> al\u0131nacak. Yakla\u015f\u0131k <strong>8 bin ki\u015finin istihdam edildi\u011fi<\/strong> b\u00f6lgeye <strong>sosyal tesislerde yap\u0131lmas\u0131<\/strong> planlan\u0131yor.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.buyuksivas.com\/gunes-enerjisi\/\" target=\"_blank\" rel=\"nofollow noopener\">Sivas Haber<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sivas Organize Sanayi B\u00f6lgesi&#8217;nde G\u00fcne\u015f Enerjisinden elektrik \u00fcretimi i\u00e7in g\u00fcne\u015f santral\u00a0 3 bin 652 adet mono kristal tip fotovoltaik panel kullan\u0131larak 16 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123122,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,53157,81845,81844,54979],"views":160,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123120"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=123120"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123120\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/123122"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=123120"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=123120"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=123120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}