{"id":123077,"date":"2020-11-06T10:39:18","date_gmt":"2020-11-06T07:39:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=123077"},"modified":"2020-11-06T10:48:33","modified_gmt":"2020-11-06T07:48:33","slug":"afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi\/","title":{"rendered":"(Turkish) &#8217;Af\u015fin Elbistan A Santrali&#8217; \u00c7evre Sistemleri Bilgilendirmesi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/123077\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>2018 y\u0131l\u0131n\u0131n Aral\u0131k ay\u0131 itibariyle \u00f6zel sekt\u00f6re devredilen Af\u015fin Elbistan A Termik Santrali, yeni\u00a0 yat\u0131r\u0131mlar\u0131n tamamlanmas\u0131yla, \u00e7evre limitlerine uygunlukta uluslararas\u0131 standartlara sahip oluyor. 1&#8217;inci etapta, \u00e7evre mevzuat\u0131na g\u00f6re tamamlanmas\u0131 gereken Dry FGD (kuru baca gaz\u0131 ar\u0131tma sistemleri) yat\u0131r\u0131m\u0131n\u0131n hayata ge\u00e7mesiyle ge\u00e7ici faaliyet belgesi alan santralde, 2&#8217;inci etap Wet FGD (\u0131slak baca gaz\u0131 ar\u0131tma sistemleri) yat\u0131r\u0131m\u0131 h\u0131zla devam ediyor. <img loading=\"lazy\" class=\"alignright wp-image-123081\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-11.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-11.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-11-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-11-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-11-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Filtreleme ve baca gaz\u0131 ar\u0131tma projelerinin yap\u0131m\u0131nda, Dry FGD yat\u0131r\u0131m\u0131n\u0131n % 100\u2019\u00fc, Wet FGD yat\u0131r\u0131m\u0131n\u0131n % 65\u2019i tamamland\u0131.<\/h1>\n<p><strong>Af\u015fin Elbistan A Termik Santrali<\/strong>\u2019nde \u00e7evreyle ilgili <strong>1&#8217;inci etap rehabilitasyon yat\u0131r\u0131mlar\u0131<\/strong> tamamland\u0131, <strong>2&#8217;inci etap yat\u0131r\u0131mlar\u0131<\/strong> ise s\u00fcr\u00fcyor. <strong>At\u0131k gaz\u0131 bacaya ula\u015fmadan<\/strong> \u00f6nce <strong>filtreleyen<\/strong> ve <strong>ar\u0131tan sistemin kurulmas\u0131<\/strong>yla, santral, <strong>\u00e7evre limitlerine uygunlukta<\/strong> uluslararas\u0131 standartlara sahip oluyor. Santral, <strong>Dry FGD (kuru baca gaz\u0131 ar\u0131tma) sistemi<\/strong>nin mevzuata g\u00f6re <strong>2020 y\u0131l\u0131<\/strong>n\u0131n ilk <strong>6 ay\u0131nda<\/strong> tamamlanmas\u0131 ve <strong>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan yap\u0131lan denetimler sonucu <strong>ge\u00e7ici faaliyet belgesi<\/strong> ald\u0131.<\/p>\n<p><strong>Af\u015fin Elbistan A Santrali<\/strong>\u2019nin <strong>1 Aral\u0131k 2018<\/strong> tarihinde <strong>\u00c7elikler Holding<\/strong>\u2019e devredilmesiyle birlikte \u015firket <strong>revizyon<\/strong> ve <strong>rehabilitasyon yat\u0131r\u0131mlar\u0131<\/strong>na ba\u015flad\u0131. Bu kapsamda, yap\u0131lacak <strong>projenin fizibilite raporlar\u0131<\/strong> ve<strong> \u015fartnameleri<\/strong> 2019 y\u0131l\u0131n\u0131n <strong>\u015eubat ay\u0131nda<\/strong> haz\u0131rland\u0131 ve <strong>Haziran 2019<\/strong>\u2019da <strong>m\u00fchendislik projelerinin haz\u0131rlanmas\u0131<\/strong> konusunda <img loading=\"lazy\" class=\"alignleft wp-image-123082\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-2.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-2.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-2-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-2-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-2-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>anla\u015fma imzaland\u0131. Bu anla\u015fmay\u0131 takiben, <strong>Temmuz 2019\u2019da<\/strong> <em>filtre ve baca gaz\u0131 ar\u0131tma tesisi<\/em>nin, <strong>A\u011fustos 2019<\/strong>\u2019da <strong>otomatik kontrol ve kumanda sisteminin (DCS) m\u00fchendislik anla\u015fmalar\u0131<\/strong> imzaland\u0131.<\/p>\n<p>Santralin ilk ate\u015flenmesi a\u015famas\u0131nda <strong>fuel oil kullan\u0131m\u0131<\/strong>n\u0131n neden oldu\u011fu <strong>kirlili\u011fi \u00f6nlemek<\/strong> amac\u0131yla, yine 2019 y\u0131l\u0131n\u0131n A\u011fustos ay\u0131nda, \u00fcnitelerdeki <strong>yak\u0131c\u0131lar\u0131 do\u011falgazla \u00e7al\u0131\u015ft\u0131racak<\/strong> ve <strong>fuel oil yak\u0131t <\/strong><strong>kaynakl\u0131 kirlili\u011fi<\/strong> tamamen ortadan kald\u0131racak ayr\u0131 bir proje daha ba\u015flat\u0131ld\u0131. Bu \u00e7er\u00e7evede <strong>kurulan do\u011falgaz istasyonlar\u0131<\/strong>n\u0131n <strong>2020 y\u0131l\u0131nda<\/strong> kullan\u0131lmaya ba\u015flanmas\u0131yla, santralin ate\u015flenmesinde ortaya \u00e7\u0131kan ve <strong>kara duman<\/strong> olarak bilinen g\u00f6r\u00fcnt\u00fcler tarihe kar\u0131\u015ft\u0131.<\/p>\n<h2>\u0130\u015f\u00e7iler ma\u011fdur edilmedi<\/h2>\n<p><strong>Revizyon, filtre ve baca gaz\u0131 ar\u0131tma tesisleri<\/strong>nin yap\u0131m\u0131 devam ederken, d\u00fcnyada ve \u00fclkemizde ba\u015f<br \/>\n<img loading=\"lazy\" class=\"alignright wp-image-123083\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-3.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-3.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-3-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-3-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-3-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>g\u00f6steren pandemi \u015fartlar\u0131na ra\u011fmen <strong>i\u015ften \u00e7\u0131karma yap\u0131lmad\u0131<\/strong>. Bu s\u00fcre\u00e7te,<strong> t\u00fcm i\u015f\u00e7ilere \u00f6demeleri<\/strong><br \/>\nyap\u0131larak <strong>ailelerine destek<\/strong> sa\u011fland\u0131. Pandemi ko\u015fullar\u0131nda devam eden <strong>revizyon<\/strong> ve<strong> filtreleme<\/strong><br \/>\n<strong>\u00e7al\u0131\u015fmalar\u0131<\/strong>nda <strong>1&#8217;inci faz<\/strong> tamamland\u0131 ve <strong>Haziran 2020<\/strong>\u2019de <strong>3 \u00fcnitede<\/strong> <strong>\u00e7evre mevzuat\u0131<\/strong>n\u0131n<br \/>\ngerektirdi\u011fi \u015fartlar\u0131n yerine getirilmi\u015f olmas\u0131 nedeniyle <strong>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan<br \/>\nverilen <strong>ge\u00e7ici faaliyet belgesiyle<\/strong> \u00fcretime ge\u00e7ildi.<\/p>\n<h2>T\u00fcrkiye ekonomisi i\u00e7in \u00f6nemli bir enerji \u00fcretim tesisi<\/h2>\n<p><strong>Af\u015fin Elbistan A Termik Santrali<\/strong> d\u00f6rt \u00fcniteden olu\u015fuyor ve y\u0131lda<strong> 8.1 milyar kilovatsaatlik<\/strong> elektrik \u00fcretim kapasitesiyle T\u00fcrkiye ekonomisine ve <strong>Kahramanmara\u015f\u2019a<\/strong> \u00f6nemli katk\u0131lar sa\u011fl\u0131yor. <img loading=\"lazy\" class=\"wp-image-123084 alignleft\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-4.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-4.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-4-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-4-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-4-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Toplam<strong> 1.355 MW<\/strong> kurulu g\u00fcc\u00fcyle<strong> elektrik \u00fcretimi<\/strong>nde \u00f6nde gelen tesislerden olan<strong> Af\u015fin Elbistan A Santrali,<\/strong> revizyon yat\u0131r\u0131mlar\u0131 sayesinde hem <strong>filtreleme<\/strong> ve <strong>baca gaz\u0131 ar\u0131tma sistemleri<\/strong> konusunda d\u00fcnya standartlar\u0131na sahip olacak, hem de elektrik \u00fcretim kapasitesini art\u0131racak.<\/p>\n<p>Af\u015fin Elbistan A Santrali, <strong>mill\u00ee<\/strong> ve <strong>do\u011fal k\u00f6m\u00fcr kaynaklar\u0131<\/strong>n\u0131n ekonomiye kazand\u0131r\u0131lmas\u0131nda ve <strong>d\u0131\u015f <\/strong><br \/>\n<strong>ticaret a\u00e7\u0131\u011f\u0131n\u0131n azalt\u0131lmas\u0131<\/strong>nda \u00f6nemli rol oynuyor. <strong>Af\u015fin Elbistan A Santrali\u2019nde<\/strong>, linyit i\u015fletmeleriyle birlikte, b\u00fcy\u00fck \u00e7o\u011funlu\u011fu b\u00f6lge halk\u0131ndan olu\u015fan <strong>4 bine yak\u0131n i\u015f\u00e7i<\/strong> \u00e7al\u0131\u015f\u0131yor.<\/p>\n<h2>\u00c7evre sistemlerinde d\u00fcnya standard\u0131na sahip<\/h2>\n<p>Santralin<strong> \u00c7elikler Holding<\/strong>\u2019e devriyle birlikte ba\u015flat\u0131lan <strong>filtreleme<\/strong> ve<strong> baca gaz\u0131 ar\u0131tma projesi<\/strong>nde, d\u00fcnyada uygulanan <strong>en iyi \u00e7evre sistemleri<\/strong>nin hayata ge\u00e7irilmesi hedeflendi. Projenin <strong>m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131<\/strong>, hem <strong>uluslararas\u0131 standartlara<\/strong>, hem de<strong> son teknolojiye<\/strong> sahip olmas\u0131 <img loading=\"lazy\" class=\"alignright wp-image-123088\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-5.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-5.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-5-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-5-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/afsin-elbistan-a-santrali-cevre-sistemleri-bilgilendirmesi-5-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>amac\u0131yla, d\u00fcnyaca tan\u0131nan <strong>uzman \u015firketlere<\/strong> verildi ve<strong> proje tasar\u0131m\u0131<\/strong>n\u0131n tamamlanmas\u0131yla birlikte, <strong>vakit kaybetmeden<\/strong> yap\u0131m\u0131na ba\u015fland\u0131.<\/p>\n<p>Proje kapsam\u0131nda,<strong> toz tutucu filtreler<\/strong> <strong>% 80<\/strong> oran\u0131nda yenilenerek ilk etapta <strong>Dry FGD (\u0131slak <\/strong><br \/>\n<strong>baca gaz\u0131 ar\u0131tma) sistemi<\/strong> <strong>% 100<\/strong> oran\u0131nda tamamlanarak hayata ge\u00e7irildi. Bu \u00e7er\u00e7evede,<br \/>\n<strong>Avrupa\u2019daki uygulama \u00f6rnekleri<\/strong>ne uygun olarak hareket edildi. <strong>Haziran 2020<\/strong>\u2019de <strong>\u00e7evre mevzuat\u0131<\/strong>na <strong>uygunluk denetimi<\/strong>nden <strong>onay al\u0131narak<\/strong> kullan\u0131m\u0131na ba\u015fland\u0131.<\/p>\n<p><strong>2&#8217;inci a\u015famada<\/strong>, daha b\u00fcy\u00fck tesislerden olu\u015fan <strong>Wet FGD (\u0131slak baca gaz\u0131 ar\u0131tma) sistemi<\/strong> in\u015fas\u0131na ba\u015fland\u0131. Sistemin m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131 <strong>Avrupa\u2019da<\/strong> haz\u0131rland\u0131ktan sonra, <strong>Mart 2020<\/strong>\u2019de temeli at\u0131ld\u0131 ve <strong>pandemi ko\u015fullar\u0131<\/strong>na ra\u011fmen ara verilmeden ilerleyerek<strong> % 65<\/strong> oran\u0131nda tamamland\u0131.<\/p>\n<p>Sistemlerin, <strong>2021 y\u0131l\u0131<\/strong>n\u0131n ilk \u00e7eyre\u011finde <strong>% 100<\/strong> oran\u0131nda tamamlanmas\u0131 planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2018 y\u0131l\u0131n\u0131n Aral\u0131k ay\u0131 itibariyle \u00f6zel sekt\u00f6re devredilen Af\u015fin Elbistan A Termik Santrali, yeni\u00a0 yat\u0131r\u0131mlar\u0131n tamamlanmas\u0131yla, \u00e7evre limitlerine uygunlukta uluslararas\u0131 standartlara sahip [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123080,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,24649],"tags":[4673,81805,81791,81790,55570,81800,2199,4422,81792,81801,81799,81803,81786,81802,81806,81788,65174,81795,81794,81787,81798,81797,81789,54547,81796,81807,81793,81804],"views":283,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123077"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=123077"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/123077\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/123080"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=123077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=123077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=123077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}