{"id":12304,"date":"2013-06-25T10:54:59","date_gmt":"2013-06-25T07:54:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12304"},"modified":"2013-06-25T10:55:34","modified_gmt":"2013-06-25T07:55:34","slug":"gunes-lisanslari-ile-ilgili-teknik-incelemeler-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-lisanslari-ile-ilgili-teknik-incelemeler-basliyor\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Lisanslar\u0131 \u0130le \u0130lgili Teknik \u0130ncelemeler Ba\u015fl\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12304\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019na (EPDK) yap\u0131lan yakla\u015f\u0131k 9000 MW G\u00fcne\u015f Enerjisi Santral\u0131 (GES) \u00f6nlisans ba\u015fvurular\u0131 i\u00e7in yat\u0131r\u0131mc\u0131lar\u0131n sundu\u011fu \u00f6l\u00e7\u00fcm raporlar\u0131na ili\u015fkin teknik incelemeler Yenilenebilir Enerji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde ba\u015flat\u0131lacak.\u00a0<\/strong><\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 (ETKB) taraf\u0131ndan 1 Haziran 2013 tarihinde yay\u0131mlanan GES Ba\u015fvurular\u0131n\u0131n Teknik De\u011ferlendirmesine \u0130li\u015fkin Y\u00f6netmeli\u011fe g\u00f6re, Genel M\u00fcd\u00fcrl\u00fck taraf\u0131ndan teknik de\u011ferlendirme yap\u0131lacak lisans ba\u015fvurular\u0131, Bakanl\u0131k taraf\u0131ndan ilan edilecek ve grupland\u0131r\u0131lan lisans ba\u015fvurular\u0131n\u0131n santral sahas\u0131 alan\u0131n\u0131n Santral Sahas\u0131 Belirleme Y\u00f6ntemi esasl<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/xapple-veri-merkezleri-tamamen-yenilenebilir-enerji-kullaniyor-manset_640x360.jpg.pagespeed.ic_.5aUi8Wxt06.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-8678\" title=\"gunes-enerjisi-lisanslari-ile-ilgili-teknik-incelemeler-basliyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/xapple-veri-merkezleri-tamamen-yenilenebilir-enerji-kullaniyor-manset_640x360.jpg.pagespeed.ic_.5aUi8Wxt06-300x173.jpg\" alt=\"\" width=\"300\" height=\"173\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/xapple-veri-merkezleri-tamamen-yenilenebilir-enerji-kullaniyor-manset_640x360.jpg.pagespeed.ic_.5aUi8Wxt06-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/xapple-veri-merkezleri-tamamen-yenilenebilir-enerji-kullaniyor-manset_640x360.jpg.pagespeed.ic_.5aUi8Wxt06-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/xapple-veri-merkezleri-tamamen-yenilenebilir-enerji-kullaniyor-manset_640x360.jpg.pagespeed.ic_.5aUi8Wxt06.jpg 494w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ar\u0131na uygunlu\u011fu kontrol edilecek. Ba\u015fvurulara y\u00f6nelik evrak incelemelerini yapmakta olan EPDK, evrak eksiklerinin tamamlanmas\u0131 ard\u0131ndan, ba\u015fvurular\u0131n teknik olarak incelenmesi i\u00e7in gerekli i\u015flemleri ba\u015flatacak.<\/p>\n<p>Santral Sahas\u0131 Alan\u0131 Kurulu G\u00fc\u00e7 Yo\u011funlu\u011fu hesaplanacak olan ba\u015fvurular, grupland\u0131r\u0131lan her bir lisans ba\u015fvurusu i\u00e7in t\u00fcm \u015fartlar\u0131n sa\u011flanmas\u0131 durumunda her bir ba\u015fvuruya ait santral sahas\u0131 alan\u0131n\u0131n kesi\u015fti\u011fi veya \u00e7ak\u0131\u015ft\u0131\u011f\u0131 di\u011fer lisans ba\u015fvurular\u0131 belirlenecek. \u201cBa\u015fvurunun Teknik De\u011ferlendirme Sonu\u00e7 Raporu\u201d Genel M\u00fcd\u00fcrl\u00fck taraf\u0131ndan EPDK\u2019ya g\u00f6nderilecek.<\/p>\n<p><strong>AYNI YERLERE BA\u015eVURANLAR YARI\u015eACAK<\/strong><\/p>\n<p>Yenilenebilir Enerji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn teknik de\u011ferlendirmesi sonucunda baz\u0131 ba\u015fvurular\u0131n elenebilece\u011fine ve ba\u015fvurular\u0131n azalabilece\u011fine dikkat \u00e7ekiliyor. Teknik olarak uygun bulunan ba\u015fvurular aras\u0131ndan ba\u015fka bir ba\u015fvuru ile \u00e7ak\u0131\u015ft\u0131\u011f\u0131 veya kesi\u015fti\u011fi belirlenen ve grupland\u0131r\u0131lan ba\u015fvurular i\u00e7in T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan yar\u0131\u015fmalar yap\u0131lacak. Yeni Elektrik Piyasas\u0131 Kanunu\u2019na uygun olarak haz\u0131rlanan mevzuata g\u00f6re, ayn\u0131 ba\u011flant\u0131 noktas\u0131na ve\/veya ayn\u0131 ba\u011flant\u0131 b\u00f6lgesine ba\u011flanmak i\u00e7in birden fazla ba\u015fvurunun bulunmas\u0131 durumunda, katk\u0131 pay\u0131 yar\u0131\u015fmalar\u0131 d\u00fczenlenecek.<\/p>\n<p><strong>YARI\u015eMALARA 30 G\u00dcN S\u00dcRE<\/strong><\/p>\n<p>TE\u0130A\u015e yar\u0131\u015fmaya kat\u0131lacak projeleri ba\u011flant\u0131 b\u00f6lgesi ve\/veya ba\u011flant\u0131 noktas\u0131 baz\u0131nda internet sayfas\u0131nda duyuracak ve yar\u0131\u015fma tarihlerini bildirecek. \u015eirketlere, davet yaz\u0131s\u0131n\u0131 g\u00f6nderecek olan TE\u0130A\u015e\u2019\u0131n g\u00f6nderisinde, Katk\u0131 Pay\u0131 teklif mektubu formu, taahh\u00fctname \u00f6rne\u011fi ile kati ve s\u00fcresiz banka teminat mektubu \u00f6rne\u011fi bulunacak. TE\u0130A\u015e\u2019\u0131n internet sayfas\u0131ndaki yay\u0131m tarihi ile teklif verme tarihi aras\u0131ndaki s\u00fcre, 30 takvim g\u00fcn\u00fcnden az olamayacak.<\/p>\n<p><strong>YARI\u015eMA SONU\u00c7LARI<\/strong><\/p>\n<p>\u015eirketler belirlenen \u015fartlardaki teklif zarflar\u0131n\u0131 TE\u0130A\u015e taraf\u0131ndan belirtilen yer, g\u00fcn ve saatte belirlenen adrese teslim edecek ve her bir teklif i\u00e7in sunulacak banka teminat mektubu tutar\u0131 ve her MW\u2019\u0131n virg\u00fclden sonraki ilk basama\u011f\u0131n yukar\u0131 yuvarlanmas\u0131yla elde edilen rakam\u0131n on bin TL ile \u00e7arp\u0131lmas\u0131 ile elde edilecek. Yar\u0131\u015fma sonu\u00e7lar\u0131, TE\u0130A\u015e taraf\u0131ndan 30 g\u00fcn i\u00e7erisinde EPDK\u2019ya bildirilecek ve \u015firket, yar\u0131\u015fma sonucunun taraf\u0131na tebli\u011f edildi\u011fi tarihten itibaren 15 g\u00fcn i\u00e7erisinde Katk\u0131 Pay\u0131 Anla\u015fmas\u0131 yapmak \u00fczere TE\u0130A\u015e`a ba\u015fvuru yapacak.<\/p>\n<p><strong>SAHA \u00c7AKI\u015eMASI YOKSA L\u0130SANS HEMEN<\/strong><\/p>\n<p>\u00c7ak\u0131\u015fmayan ba\u015fvurular i\u00e7in ise EPDK \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde \u00f6nlisanslar\u0131n verilmesi i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flayacak. Gerekli y\u00fck\u00fcml\u00fcl\u00fckleri yerine getirmesi i\u00e7in firmalara bildirimde bulunacak. EPDK yar\u0131\u015fmalar\u0131 kazanan firmalara \u00f6nlisans\u0131n\u0131 verecek. Bunun ard\u0131ndan y\u00fcr\u00fcrl\u00fc\u011fe girecek \u00d6nlisans ve Lisans Y\u00f6netmeli\u011fi\u2019ne uygun olarak ba\u015fvurular i\u00e7in gerekli y\u00fck\u00fcml\u00fcl\u00fcklerini yerine getiren ba\u015fvuru sahiplerine lisanslar\u0131 verilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/gunes-lisanslari-ile-ilgili-teknik-incelemeler-bas_4013.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019na (EPDK) yap\u0131lan yakla\u015f\u0131k 9000 MW G\u00fcne\u015f Enerjisi Santral\u0131 (GES) \u00f6nlisans ba\u015fvurular\u0131 i\u00e7in yat\u0131r\u0131mc\u0131lar\u0131n sundu\u011fu \u00f6l\u00e7\u00fcm raporlar\u0131na ili\u015fkin teknik incelemeler [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8678,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1046,165,750,2326,227,13,2569,6287,6286,6288,2168],"views":777,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12304"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12304"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12304\/revisions"}],"predecessor-version":[{"id":12306,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12304\/revisions\/12306"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/8678"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}