{"id":122945,"date":"2020-11-04T11:56:45","date_gmt":"2020-11-04T08:56:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=122945"},"modified":"2020-11-04T12:56:45","modified_gmt":"2020-11-04T09:56:45","slug":"generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi\/","title":{"rendered":"(Turkish) &#8217;Generalsolar&#8217; \u00c7ok Say\u0131da \u00c7at\u0131 GES Projesi S\u00f6zle\u015fmesi \u0130mzalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/122945\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Anahtar teslimi G\u00fcne\u015f Enerjisi Santrali (GES) kurulumlar\u0131 ger\u00e7ekle\u015ftiren Generalsolar Enerji, Gaziantep, Kayseri ve Kahramanmara\u015f\u2019ta sekt\u00f6rlerinin \u00f6nemli isimlerinden olan Meray Kuruyemi\u015f, Erat Ayakkab\u0131, Bilken Yumurta, Emek \u00c7elik Kap\u0131 ve Hascevher ile \u00f6zt\u00fcketim ama\u00e7l\u0131 \u00e7at\u0131 GES\u2019lerinin yap\u0131m\u0131 i\u00e7in s\u00f6zle\u015fme imzalad\u0131.<\/h1>\n<p>\u00dc\u00e7 ilde sekt\u00f6rlerinin \u00f6nemli firmalar\u0131 ile <strong>GES projeleri<\/strong> i\u00e7in s\u00f6zle\u015fme imzalaman\u0131n mutlulu\u011funu ya\u015fad\u0131klar\u0131n\u0131 anlatan Generalsolar Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 <strong>Ali Demirda\u015f<\/strong>,<strong> \u201c<\/strong>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck \u00e7elik tencere \u00fcreticisi <strong>Kahramanmara\u015f<\/strong> merkezli <strong>Hascevher<\/strong>, tek \u00e7at\u0131da <strong>11 MW<\/strong>\u2019lik b\u00fcy\u00fck \u00f6l\u00e7ekli <strong>GES Projesi<\/strong>nde bizi tercih etti.\u00a0 Sekt\u00f6rlerinin \u00f6nemli isimlerinden Gaziantep merkezli <strong>Meray Kuruyemi\u015f<\/strong>\u2019in <strong>1.7 MW<\/strong>, <strong>Bilken Yumurta<\/strong>\u2019n\u0131n <strong>1 MW<\/strong>\u2019lik ikinci etap projesinin yan\u0131 s\u0131ra <strong>Erat Ayakkab\u0131<\/strong>\u2019n\u0131n da <strong>750 KW<\/strong> <em>\u00e7at\u0131 <img loading=\"lazy\" class=\"alignright wp-image-122947\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi-1.jpg\" alt=\"\" width=\"320\" height=\"250\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi-1.jpg 624w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi-1-300x235.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi-1-500x391.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/generalsolar-cok-sayida-cati-ges-projesi-sozlesmesi-imzaladi-1-64x50.jpg 64w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>GES projeleri<\/em>ne start verdik. \u00c7elik kap\u0131 sekt\u00f6r\u00fcn\u00fcn \u00f6nemli isimlerinden Kayseri merkezli <strong>Emek \u00c7elik Kap\u0131\u2019<\/strong>n\u0131n da <strong>1.2 MW<\/strong>\u2019lik <strong>\u00e7at\u0131 GES s\u00f6zle\u015fmesi<\/strong>ni imzalad\u0131k\u201d \u015feklinde konu\u015ftu.<\/p>\n<p><strong>2012 y\u0131l\u0131ndan<\/strong> g\u00fcn\u00fcm\u00fcze enerji sekt\u00f6r\u00fcn\u00fcn g\u00fcne\u015f alan\u0131nda \u00fclke genelinde ba\u015far\u0131l\u0131 i\u015flere imza atarak sekt\u00f6r\u00fcn\u00fcn aranan firmalar\u0131ndan olan <strong>Generalsolar<\/strong>, <strong>2020 y\u0131l\u0131nda<\/strong> \u00e7ok say\u0131da <strong>\u00e7at\u0131 GES projesi<\/strong>ni tamamlayarak yat\u0131r\u0131mc\u0131lar\u0131n\u0131n enerjilerini G\u00fcne\u015f\u2019ten almas\u0131n\u0131 sa\u011flad\u0131.<\/p>\n<p><strong>\u00dcretim<\/strong> ve <strong>ihracatlar\u0131<\/strong> ile <strong>T\u00fcrkiye\u2019de<\/strong> s\u00f6z sahibi \u00e7ok say\u0131da firman\u0131n kendi enerjilerini \u00fcretmek amac\u0131yla <strong>Generalsolar<\/strong> ile proje geli\u015ftirdi\u011fi bilgisini aktaran Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131<strong> Ercan Din\u00e7er<\/strong>, \u201cFabrikalar\u0131n\u0131 g\u00fcne\u015f enerjisiyle tan\u0131\u015ft\u0131rmak ve bu alandan daha \u00e7ok istifade etmek isteyen \u015firketlerin taleplerine <strong>tecr\u00fcbeli m\u00fchendis<\/strong> ve <strong>\u00e7al\u0131\u015fan kadromuz<\/strong> ile h\u0131zl\u0131 bir \u015fekilde cevap vermeye \u00e7al\u0131\u015f\u0131yoruz. \u00c7ok say\u0131da<strong> \u00e7at\u0131 GES projemizi<\/strong> yak\u0131n zamanda tamamlaman\u0131n mutlulu\u011funu ya\u015f\u0131yoruz. <strong>Pet Preform<\/strong> alan\u0131ndaki ba\u015far\u0131l\u0131 \u00fcretimleriyle d\u00fcnyaca bilinen <strong>K\u00f6ksan Holding<\/strong>\u2019in, <strong>Gaziantep Organize Sanayi B\u00f6lgesi<\/strong>nde bulunan tesislerinin \u00e7at\u0131s\u0131na kurulacak<strong> 14 MW<\/strong> g\u00fcc\u00fcndeki elektrik santralinin <strong>4.2 MW<\/strong>\u2019lik ilk etap projesi ba\u015far\u0131 ile tamamland\u0131. <strong>Haskan \u015eirketler Grubu<\/strong>nun ise toplam <strong>9 MW<\/strong>\u2019lik \u00e7at\u0131 GES projesinin Kilis <strong>Bayteks firmas\u0131<\/strong> k\u0131sm\u0131 olan <strong>2 MW<\/strong>\u2019lik projesini bitirdik. <strong>Bilken Yumurta<\/strong>\u2019n\u0131n <strong>2 MW<\/strong>\u2019lik projesinin <strong>1 MW<\/strong>\u2019lik ilk etab\u0131 da faaliyete ge\u00e7irildi.\u00a0 Di\u011fer taraftan<strong> \u00d6zkaplan Hal\u0131<\/strong>\u2019n\u0131n <strong>5.5 MW<\/strong>, <em>Aslankaya Grubun 2,4 MW, Adnan A.\u015e.\u2019nin 1,4 MW ve Petsa Ambalaj\u2019\u0131n 1 MW\u2019lik GES projeleri<\/em> ve <strong>Kahramanmara\u015f Marteks<\/strong> firmas\u0131n\u0131n <strong>550 KW \u00e7at\u0131 GES projeleri<\/strong> yak\u0131n zamanda hayata ge\u00e7irildi ve \u00fcretime start verildi\u201d diye konu\u015ftu.<\/p>\n<p><strong>Kurulacak \u00e7at\u0131 GES<\/strong>\u2019ler ile <strong>yerli<\/strong> ve<strong> yenilenebilir g\u00fcne\u015f kayna\u011f\u0131<\/strong>n\u0131n kullan\u0131m\u0131 sa\u011flanarak enerji ithalat\u0131n\u0131n azalt\u0131lmas\u0131na katk\u0131da bulunuldu\u011fu gibi, <strong>daha ya\u015fanabilir<\/strong> ve<strong> daha temiz d\u00fcnya<\/strong> hedeflerimize bizleri bir ad\u0131m daha yakla\u015ft\u0131rd\u0131\u011f\u0131n\u0131 s\u00f6yleyen <strong>Ali Demirda\u015f<\/strong>, \u201cBu yat\u0131r\u0131mlar ile firmalar\u0131m\u0131z<strong> t\u00fckettikleri elektri\u011fin tamam\u0131n\u0131<\/strong> temiz enerji kaynaklardan sa\u011flamay\u0131 ve <strong>karbon ayak izlerini s\u0131f\u0131rlamay\u0131<\/strong> hedefliyor. Bizlere duyduklar\u0131 g\u00fcven ve \u00e7evreye olan duyarl\u0131l\u0131klar\u0131ndan dolay\u0131 yat\u0131r\u0131mc\u0131lar\u0131m\u0131za te\u015fekk\u00fcr ederiz.<strong> Yenilenebilir enerjiyi<\/strong> kullan\u0131labilir kaynaklar\u0131m\u0131z aras\u0131nda en<strong> \u00fcst s\u0131raya ta\u015f\u0131mak<\/strong> ve <strong>gelecek ku\u015faklara ya\u015fanabilir<\/strong> bir d\u00fcnya b\u0131rakabilmek i\u00e7in <strong>t\u00fcm g\u00fcc\u00fcm\u00fczle<\/strong> ve <strong>enerjimizle<\/strong> \u00e7al\u0131\u015fmaya devam edece\u011fiz\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Anahtar teslimi G\u00fcne\u015f Enerjisi Santrali (GES) kurulumlar\u0131 ger\u00e7ekle\u015ftiren Generalsolar Enerji, Gaziantep, Kayseri ve Kahramanmara\u015f\u2019ta sekt\u00f6rlerinin \u00f6nemli isimlerinden olan Meray Kuruyemi\u015f, Erat Ayakkab\u0131, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":122948,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[68478,71548,81701,5070,52259,81702,61365,53157,54979],"views":182,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122945"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=122945"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122945\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/122948"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=122945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=122945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=122945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}