{"id":122888,"date":"2020-11-03T14:00:32","date_gmt":"2020-11-03T11:00:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=122888"},"modified":"2020-11-03T14:00:32","modified_gmt":"2020-11-03T11:00:32","slug":"baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek\/","title":{"rendered":"(Turkish) Ba\u015fkent EDA\u015e Mikro \u015eebeke Bataryas\u0131n\u0131 Mart 2021\u2019de Hayata Ge\u00e7irecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/122888\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri\u2019nden Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A.\u015e. Elektrik Da\u011f\u0131t\u0131m Hizmetleri Derne\u011fi\u2019nin (ELDER) koordinat\u00f6rl\u00fc\u011f\u00fcnde ilerleyen Kimyasal Enerji Depolama Projesi\u2019ne (KEDEP), Alt\u0131nay Teknoloji Grubu b\u00fcnyesinde bulunan Alt\u0131nay Elektromobilite A.\u015e. ile birlikte kat\u0131ld\u0131. Trafo yat\u0131r\u0131m\u0131n\u0131n yap\u0131lamad\u0131\u011f\u0131 b\u00f6lgelerde enerji depolama \u00fcniteleriyle k\u00fc\u00e7\u00fck \u00f6l\u00e7ekli enerji adalar\u0131 olu\u015fturulmas\u0131 planlanan projede, 100 haneye kadar besleme g\u00fcc\u00fcndeki iki ayr\u0131 bataryan\u0131n \u00f6n\u00fcm\u00fczdeki mart ay\u0131nda Gazi Teknoparktaki mikro \u015febekeye kurulumu tamamlanacak.<\/strong><\/h1>\n<p><strong>Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri<\/strong>\u2019nden <strong>Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A.\u015e. (Ba\u015fkent EDA\u015e)<\/strong>, T\u00fcrkiye elektrik da\u011f\u0131t\u0131m sekt\u00f6r\u00fcnde depolama alan\u0131nda yap\u0131lan ilk ve en kapsaml\u0131 proje olan <strong>Kimyasal Enerji Depolama Projesi\u2019ne (KEDEP)<\/strong>, kat\u0131lan ilk <strong>elektrik da\u011f\u0131t\u0131m \u015firketleri<\/strong>nden biri oldu.<\/p>\n<p><strong>A\u011fustos 2018<\/strong>\u2019de ba\u015flat\u0131lan ve <strong>Elektrik Da\u011f\u0131t\u0131m Hizmetleri Derne\u011fi<\/strong>\u2019nin<strong> (ELDER)<\/strong> koordinat\u00f6rl\u00fc\u011f\u00fcnde y\u00fcr\u00fct\u00fclen projeye, <strong>Ba\u015fkent EDA\u015e Alt\u0131nay Teknoloji Grubu<\/strong> \u015firketlerinden <img loading=\"lazy\" class=\"alignright wp-image-122891\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2.jpg\" alt=\"\" width=\"320\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2.jpg 806w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2-300x182.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2-768x465.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2-500x303.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/11\/baskent-edas-mikro-sebeke-bataryasini-mart-2021de-hayata-gecirecek-2-80x48.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Alt\u0131nay Elektromobilite A.\u015e.<\/strong> ile birlikte girdi.<\/p>\n<p>2 \u015firketin ortak y\u00fcr\u00fctece\u011fi \u00e7al\u0131\u015fmalarla, \u00e7e\u015fitli senaryolar\u0131 test etmeye y\u00f6nelik\u00a0<strong>lityum-iyon<\/strong> bazl\u0131 <strong>enerji depolama \u00fcniteleri<\/strong>nin kurulumlar\u0131n\u0131 ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Ge\u00e7ti\u011fimiz ay i\u00e7inde<strong> Alt\u0131nay Batarya \u00c7\u00f6z\u00fcmleri<\/strong> ile <strong>\u00f6l\u00e7eklenebilir enerji depolama sistemi geli\u015ftirilmesi<\/strong> ve <strong>\u00fcretilmesi<\/strong> anla\u015fmas\u0131na imza atan <strong>Ba\u015fkent EDA\u015e<\/strong>, <strong>KEDEP projesi<\/strong> kapsam\u0131nda geli\u015ftirece\u011fi <strong>\u00f6l\u00e7eklenebilir depolama sistemi<\/strong> ile <strong>mikro \u015febekelerde enerji depolama uygulamas\u0131<\/strong>n\u0131 inceleyecek.<\/p>\n<p>Yakla\u015f\u0131k <strong>4.3 milyon TL<\/strong> b\u00fct\u00e7eye sahip olan proje dahilinde, <strong>100 haneye<\/strong> kadar besleme g\u00fcc\u00fcndeki <strong>105 kWh<\/strong> ve <strong>315 kWh<\/strong> g\u00fcc\u00fcnde <strong>iki ayr\u0131 batarya \u00e7\u00f6z\u00fcm\u00fc<\/strong> \u00fcretilecek ve <strong>Mart 2021<\/strong> tarihi itibariyle <strong>Gazi Teknopark<\/strong> b\u00fcnyesinde yer alan<strong> mikro \u015febeke kurulumu<\/strong> tamamlanacak.<\/p>\n<h2><strong><em>\u201cEnerji depolama \u00fcniteleri, s\u00fcrd\u00fcr\u00fclebilirlik ve yenilenebilir enerji kaynaklar\u0131 a\u00e7\u0131s\u0131ndan b\u00fcy\u00fck bir \u00f6neme sahip\u201d<\/em><\/strong><\/h2>\n<p><strong>Enerjisa Enerji A.\u015e. CEO\u2019su Murat P\u0131nar<\/strong> konu ile ilgili olarak: <em>\u201cEnerjisa Enerji olarak, takip etti\u011fimiz global trendler ve benimsedi\u011fimiz s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma hedefleri do\u011frultusunda gerek ulusal, gerek yerel faaliyetlerimizi geli\u015ftirerek devam ettiriyoruz. Bu do\u011frultuda T\u00fcrkiye elektrik da\u011f\u0131t\u0131m sekt\u00f6r\u00fcnde depolama alan\u0131n\u0131n ilk ve en kapsaml\u0131 projesi olan KEDEP \u2018e Ba\u015fkent EDA\u015e ile destek vermekten b\u00fcy\u00fck mutluluk duyuyoruz. 2021 y\u0131l\u0131nda Gazi Teknopark \u2019ta kurulumu tamamlanarak \u00e7al\u0131\u015fmaya ba\u015flayacak olan enerji depolama \u00fcnitelerinin hayata ge\u00e7mesiyle birlikte \u00fclkemizin ve Enerjisa Enerji olarak bizim de benimsedi\u011fimiz s\u00fcrd\u00fcrebilir kalk\u0131nma hedefleri alt ba\u015fl\u0131klar\u0131 aras\u0131nda yer alan kesintisiz enerji kaynaklar\u0131na eri\u015fim noktas\u0131nda b\u00fcy\u00fck bir katk\u0131 sa\u011flayaca\u011f\u0131na inan\u0131yoruz. <strong>KEDEP projesi<\/strong>nin ileride geli\u015ftirilecek nice projelere ilham olmas\u0131n\u0131 umuyoruz\u201d<\/em> dedi.<\/p>\n<h2><strong><em>\u2018\u2019 Yerli m\u00fchendislik kaynaklar\u0131 ile enerji depolama \u00e7\u00f6z\u00fcmleri sunuyoruz\u2018\u2019<\/em><\/strong><\/h2>\n<p><strong>Alt\u0131nay Teknoloji Grubu Kurucu Orta\u011f\u0131 Can Bayar <\/strong>konu ile ilgili olarak<strong>: \u2018\u2019<\/strong><em>Alt\u0131nay Elektromobilite olarak <strong>10 y\u0131l\u0131 a\u015fk\u0131n<\/strong> bir s\u00fcredir, Tamamen yerli m\u00fchendislik kayna\u011f\u0131 ile kendi geli\u015ftirdi\u011fimiz lityum iyon teknolojisine sahip enerji depolama \u00e7\u00f6z\u00fcmlerini yerli ve yabanc\u0131 pazarda bir\u00e7ok ara\u00e7 \u00fcreticisinin kullan\u0131m\u0131na sunuyoruz. Bu kez, <strong>Enerjisa Ba\u015fkent EDA\u015e<\/strong> ile <strong>enerji depolama \u00e7\u00f6z\u00fcmleri<\/strong>nde ortak bir <strong>Ar-Ge projesi<\/strong>ni hayata ge\u00e7irece\u011fiz ve bundan dolay\u0131 \u00e7ok mutluyuz.<\/em> <em>Projede \u00f6ncelikli ama\u00e7,<strong> trafo yat\u0131r\u0131m\u0131<\/strong>n\u0131n elveri\u015fli olmad\u0131\u011f\u0131 b\u00f6lgelere enerji ta\u015f\u0131mak. Bununla birlikte <strong>az haneli k\u00f6yler, d\u00f6nemsel sulama yap\u0131lan tar\u0131m alanlar\u0131, \u015fantiyeler<\/strong> ve <strong>elektrikli \u015farj istasyonlar\u0131<\/strong> i\u00e7in<strong> k\u0131sa<\/strong> ve <strong>orta vadeli \u00e7\u00f6z\u00fcm<\/strong> olacak <strong>enerji havuzlar\u0131<\/strong> da projenin odak noktas\u0131 olarak g\u00f6sterilebilir\u2018\u2019 dedi.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri\u2019nden Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A.\u015e. Elektrik Da\u011f\u0131t\u0131m Hizmetleri Derne\u011fi\u2019nin (ELDER) koordinat\u00f6rl\u00fc\u011f\u00fcnde ilerleyen Kimyasal Enerji Depolama Projesi\u2019ne (KEDEP), Alt\u0131nay Teknoloji Grubu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":122892,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[81655,81651,81663,81650,21112,24666,81660,81658,81303,61157,49286,81653,81656,81649,81661,81657,81654,33828,81659,81662,81652],"views":85,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122888"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=122888"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122888\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/122892"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=122888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=122888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=122888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}