{"id":122613,"date":"2020-10-28T10:40:33","date_gmt":"2020-10-28T07:40:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=122613"},"modified":"2020-10-28T10:44:50","modified_gmt":"2020-10-28T07:44:50","slug":"elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;Elaz\u0131\u011f Belediyesi&#8217; 5 MW G\u00fcce Sahip G\u00fcne\u015f Enerji Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/122613\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Elaz\u0131\u011f Belediyesi&#8217;nin i\u015ftiraklerinden olan EBUA\u015e taraf\u0131ndan kendi enerji t\u00fcketiminin kar\u015f\u0131lanmas\u0131na y\u00f6nelik 5 MW kapasiteye <img loading=\"lazy\" class=\"alignright wp-image-122615\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/elazig-belediyesi-5-mw-guce-sahip-gunes-enerji-santrali-kuracak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sahip G\u00fcne\u015f Enerji Santrali kurulacak olup kentin merkezinde Elaz\u0131\u011f Belediyesi taraf\u0131ndan 75 bin 900 m2\u2019lik arazi \u00fczerinde 5 MW kapasiteye sahip g\u00fcne\u015f enerjisi santrali i\u015fletilecek.<\/strong><\/h1>\n<p>Tahmini olarak\u00a0<strong>3,3 milyon dolar<\/strong> yat\u0131r\u0131m bedeline sahip proje ile<strong> monokristalin fotovoltaik paneller<\/strong> kullan\u0131larak elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Santralde <strong>18 bin<\/strong> adet <strong>330 Wp<\/strong>\u2019l\u0131k g\u00fcne\u015f enerjisi panelinden enerji \u00fcretilerek <strong>100 kW<\/strong>\u2019l\u0131k <strong>50 adet<\/strong> <em>eviriciye aktar\u0131lacak<\/em> ve buradan da <strong>\u00fcretim prosesi<\/strong> i\u00e7in <strong>i\u00e7 t\u00fcketimde kullan\u0131lmak<\/strong> \u00fczere <strong>elektrik da\u011f\u0131t\u0131m sistemine<\/strong> iletilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Elaz\u0131\u011f Belediyesi&#8217;nin i\u015ftiraklerinden olan EBUA\u015e taraf\u0131ndan kendi enerji t\u00fcketiminin kar\u015f\u0131lanmas\u0131na y\u00f6nelik 5 MW kapasiteye sahip G\u00fcne\u015f Enerji Santrali kurulacak olup kentin merkezinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":122615,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[81446,81447,81445,5070,52259,53157,81444,81443,54979],"views":114,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122613"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=122613"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122613\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/122615"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=122613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=122613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=122613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}