{"id":122151,"date":"2020-10-18T13:55:03","date_gmt":"2020-10-18T10:55:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=122151"},"modified":"2020-10-18T13:55:16","modified_gmt":"2020-10-18T10:55:16","slug":"japon-mitsui-komur-hisselerinin-tamamini-satiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/japon-mitsui-komur-hisselerinin-tamamini-satiyor\/","title":{"rendered":"(Turkish) Japon Mitsui K\u00f6m\u00fcr Hisselerinin Tamam\u0131n\u0131 Sat\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/122151\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Japonya merkezli olan ticaret firmalar\u0131ndan olan Mitsui taraf\u0131ndan 2030 y\u0131l\u0131na kadar <img loading=\"lazy\" class=\"alignright wp-image-122154\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor.jpg\" alt=\"\" width=\"320\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor.jpg 853w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor-300x172.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor-768x439.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor-500x286.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/japon-mitsui-komur-hisselerinin-tamamini-satiyor-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>k\u00f6m\u00fcr santrallerindeki hisselerin tamam\u0131n\u0131n sat\u0131lmas\u0131 planlan\u0131yor.<\/h1>\n<p>Firma, kar\u0131n\u0131n \u00fc\u00e7te ikisini <strong>enerji<\/strong> ve <strong>metallerden<\/strong> elde eden <em>Japon al\u0131m sat\u0131m firmalar\u0131ndan<\/em> <strong>Mitsui &amp; Co Ltd<\/strong>, 2050&#8217;yekadar <strong>s\u0131f\u0131r emisyon hedefi<\/strong> kapsam\u0131nda <strong>k\u00f6m\u00fcr yat\u0131r\u0131mlar\u0131ndan<\/strong> \u00e7\u0131kmay\u0131 hedefliyor. \u015eirket, <strong>2030 y\u0131l\u0131na kadar<\/strong> elinde kalan<strong> t\u00fcm k\u00f6m\u00fcrl\u00fc elektrik santralleri<\/strong>ndeki <strong>hisselerini satmay\u0131<\/strong> planl\u0131yor.<\/p>\n<p>Mitsui CEO&#8217;su <strong>Tatsuo Yasunaga<\/strong> a\u00e7\u0131klamas\u0131nda, &#8220;<strong>Endonezya, \u00c7in, Malezya<\/strong> ve <strong>Fas<\/strong>&#8216;ta <strong>k\u00f6m\u00fcrl\u00fc elektrik santralleri<\/strong>nde hala hisselerimiz var fakat hedefimiz <strong>2030&#8217;a kadar<\/strong> bunlar\u0131 s\u0131f\u0131rlamak&#8221; ifadelerini kullan\u0131rken <strong>Covid-19 krizi<\/strong>nden dolay\u0131 <strong>petrol yat\u0131r\u0131mlar\u0131<\/strong>n\u0131 da ertelediklerini ancak <strong>likit do\u011falgaz projeleri<\/strong>nin s\u00fcrd\u00fc\u011f\u00fcn\u00fc dile getirdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Japonya merkezli olan ticaret firmalar\u0131ndan olan Mitsui taraf\u0131ndan 2030 y\u0131l\u0131na kadar k\u00f6m\u00fcr santrallerindeki hisselerin tamam\u0131n\u0131n sat\u0131lmas\u0131 planlan\u0131yor. Firma, kar\u0131n\u0131n \u00fc\u00e7te ikisini enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":122154,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,52,24649],"tags":[70114,81034,10371,81033,53315,81031,81035,81036,19365,45115,81032],"views":95,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122151"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=122151"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/122151\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/122154"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=122151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=122151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=122151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}