{"id":12152,"date":"2013-06-20T15:58:40","date_gmt":"2013-06-20T12:58:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12152"},"modified":"2013-06-20T16:17:43","modified_gmt":"2013-06-20T13:17:43","slug":"kuveytli-aswardan-amasyaya-1060-mwlik-dogalgaz-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuveytli-aswardan-amasyaya-1060-mwlik-dogalgaz-santrali\/","title":{"rendered":"(Turkish) Kuveytli Aswar`dan Amasya`ya 1060 MW`lik Do\u011falgaz Santrali!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12152\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kuveytli Aswar National Group`un T\u00fcrkiye`deki i\u015ftiraki A&amp;S Enerji \u0130stanbul GCC Amasya`da 1,060 MW`l\u0131k do\u011falgaz \u00e7evrim santrali kuracak. T\u00fcrkiye enerji sekt\u00f6r\u00fcne yat\u0131r\u0131m i\u00e7in yeni bir yabanc\u0131 sermaye giri\u015fi ger\u00e7ekle\u015fiyor. Ancak bu yat\u0131r\u0131m, T\u00fcrkiye`nin elektrik \u00fcretiminde do\u011falgaz\u0131n pay\u0131n\u0131 azaltmaya y\u00f6nelik yakla\u015f\u0131m\u0131na kar\u015f\u0131n, do\u011falgaza dayal\u0131 bir elektrik \u00fcretim santrali i\u00e7in yap\u0131lacak.\u00a0<\/strong><\/p>\n<div><strong>PROJEY\u0130 SATIN ALDILAR<\/strong><\/div>\n<div><\/div>\n<div>Kuweytli Aswar National Group`un T\u00fcrkiye`deki \u015firketi A&amp;S Enerji Y\u00f6netim Kurulu \u00dcyesi Cemalettin \u00d6zdemir, Amasya`daki 1060 MW kurulu bir do\u011falgaz santrali projesini geli\u015ftiren Benal Dan\u0131\u015fmanl\u0131k \u015firketini sat\u0131n ald\u0131klar\u0131n\u0131 a\u00e7\u0131klad\u0131. \u00d6zdemir`in verdi\u011fi bilgiye g\u00f6re projeyle ilgili lisans s\u00fcrecinin tamamlanmas\u0131n\u0131n ard\u0131ndan ilk etapta Amasya Organize Sanayi B\u00f6lgesi`nde 530 MW`l\u0131k bir do\u011falgaz \u00e7evrim santrali kurulacak.<\/div>\n<div><strong><em><\/em><\/strong><\/div>\n<div><strong><em>\u0130LK ETAPTA 600 M\u0130LYON DOLAR<\/em><\/strong><\/div>\n<div><\/div>\n<div>Projenin ilk etab\u0131n\u0131n \u00fc\u00e7 y\u0131l i\u00e7inde tamamlanmas\u0131 planland\u0131\u011f\u0131n\u0131 belirten \u00d6zdemir, &#8220;\u0130lk etap i\u00e7in 600 milyon dolar yat\u0131r\u0131m planlan\u0131yor. Daha sonra gerekli \u015fartlar\u0131n olu\u015fmas\u0131 halinde projenin 530 MW`l\u0131k ikinci etab\u0131 tamamlanarak santralin toplam kapasitesi 1,060 MW`a \u00e7\u0131kar\u0131lacak&#8221; dedi.<\/div>\n<div><strong><em><\/em><\/strong><\/div>\n<div><strong><em>TOPLAM YATIRIM 1.2 M\u0130LYAR DOLAR<\/em><\/strong><\/div>\n<div><\/div>\n<div>Santralin toplam yat\u0131r\u0131m tutar\u0131 1.2 milyar dolar olarak hesaplan\u0131yor. Bu yat\u0131r\u0131m\u0131n tamam\u0131 Kuveytli Aswar National Group taraf\u0131ndan finanse edilecek. Aswar, proje i\u00e7in y\u00fczde 30 oran\u0131nda \u00f6z sermaye kullanmay\u0131 ve y\u00fczde 70 oran\u0131nda Kuveytli ve Suudi Arabistanl\u0131 bankalar ba\u015fta olmak \u00fczere K\u00f6rfez bankalar\u0131ndan kredi kullanmay\u0131 planl\u0131yor.<\/div>\n<div><em><strong>AMASYA OSB ARAZ\u0130S\u0130NE KUR<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-12153\" title=\"Aswar-National-Group--HI-199319\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319-300x170.jpg\" alt=\"\" width=\"300\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319-500x284.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Aswar-National-Group-HI-199319.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ULACAK<\/strong><\/em><\/div>\n<div><\/div>\n<div>Aswar`\u0131n kuraca\u011f\u0131 do\u011falgaz \u00e7evrim santralinin arazisini, Amasya OSB tahsis etti. Mavi Ak\u0131m Gaz Boru Hatt\u0131`n\u0131n uzant\u0131s\u0131 olan hat \u00fczerinde kurulacak Santral, Ye\u015fil\u0131rmak nehrinin k\u0131y\u0131s\u0131nda yer alacak ve so\u011futma suyunu nehirden alacak. A&amp;S Enerji Y\u00f6netim Kurulu \u00dcyesi Cemalettin \u00d6zdemir, di\u011fer t\u00fcm \u00e7evre ko\u015fullar\u0131n\u0131n da yerine getirildi\u011fini, gaz ba\u011flant\u0131 g\u00f6r\u00fc\u015f\u00fcn\u00fcn de tamamland\u0131\u011f\u0131n\u0131 kaydetti.<\/div>\n<div><em><strong><\/strong><\/em><\/div>\n<div><em><strong>DENGELEME SANTRAL\u0130, %60 VER\u0130ML\u0130L\u0130KTE\u00a0<\/strong><\/em><\/div>\n<div><\/div>\n<div>Cemalettin \u00d6zdemir, kurulacak santralin, Amasya`n\u0131n T\u00fcrkiye`nin tam ortas\u0131nda yer almas\u0131 nedeniyle mevcut elektrik iletim sistemi i\u00e7in de bir dengeleme rol\u00fcne sahipy olaca\u011f\u0131n\u0131 vurgulad\u0131. Projenin fizibilitesini tamamlad\u0131klar\u0131n\u0131 da belirten \u00d6zdemir, &#8220;Deloitte bu konuda bizim fizibilite \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 yap\u0131yor. Yapaca\u011f\u0131m\u0131z bu santral y\u00fczde 60 civar\u0131 verimlilikle \u00e7al\u0131\u015facak. BOTA\u015e`tan gaz ba\u011flant\u0131 g\u00f6r\u00fc\u015f\u00fc al\u0131nd\u0131. \u015eirket kuruldu. TE\u0130A\u015e ile ilgili ba\u011flant\u0131 konusunda da bir s\u0131k\u0131nt\u0131 g\u00f6z\u00fckm\u00fcyor&#8221; dedi.<\/div>\n<div><em><strong><\/strong><\/em><\/div>\n<div><em><strong>YEN\u0130 PROJELER DE YOLDA\u00a0<\/strong><\/em><\/div>\n<div><\/div>\n<div>T\u00fcrkiye`de halen gayrimenkul yat\u0131r\u0131mlar\u0131 alan\u0131nda faaliyet y\u00fcr\u00fcten Aswar National Group \u00f6n\u00fcm\u00fczdeki be\u015f y\u0131l i\u00e7inde enerji sekt\u00f6r\u00fcnde de \u00f6nemli bir oyuncu olmak istiyor. Cemalettin \u00d6zdemir, &#8220;Aswar T\u00fcrkiye enerji sekt\u00f6r\u00fcne \u00f6n\u00fcm\u00fczdeki be\u015f y\u0131lda 3 milyar dolar yat\u0131r\u0131m planl\u0131yor. Ama bu yat\u0131r\u0131mlarda Aswar tek ba\u015f\u0131na olmayacak. Daha sonra baz\u0131 Suudi Arabistanl\u0131 gruplar da bu yat\u0131r\u0131m s\u00fcrecine dahil olacaklar. Finansman konusunda ilerleyen d\u00f6nemde bir joint venture yap\u0131s\u0131 olu\u015facak. Ana yat\u0131r\u0131m aya\u011f\u0131 Kuveyt`tir ama arkas\u0131nda destekleyen ayak Suudi Arabistanl\u0131 yat\u0131r\u0131mc\u0131lar olacak. Bunlar aras\u0131nda \u00f6zel sekt\u00f6r fonlar\u0131 var ama \u015fu anda devlet yat\u0131r\u0131mc\u0131lar\u0131 bulunmuyor&#8221; dedi.<\/div>\n<div><em><strong><\/strong><\/em><\/div>\n<div><em><strong>G\u00dcNE\u015e \u0130\u00c7\u0130N DE BA\u015eVURDULAR<\/strong><\/em><\/div>\n<div><\/div>\n<div>Benal Dan\u0131\u015fmanl\u0131k olarak bu do\u011falgaz \u00e7evrim santrali projesi d\u0131\u015f\u0131nda \u00f6zellikle yenilenebilir enerji yat\u0131r\u0131mlar\u0131 alan\u0131nda da faaliyet y\u00fcr\u00fctt\u00fcklerini belirten \u00d6zdemir, &#8220;\u00d6zellikle ge\u00e7ti\u011fimiz hafta sonu sona eren g\u00fcne\u015f enerjisi lisans ba\u015fvurular\u0131nda 800 MW`l\u0131k ba\u015fvuru yapt\u0131k. Biz g\u00fcne\u015f enerjisi konusunda \u00fc\u00e7 y\u0131ld\u0131r yo\u011fun bir \u00e7al\u0131\u015fma y\u00fcr\u00fct\u00fcyoruz. Bu 600 MW`l\u0131k portf\u00f6y\u00fcn en az 100 MW`\u0131n\u0131 alaca\u011f\u0131m\u0131z\u0131 tahmin ediyorum&#8221; dedi.<\/div>\n<div><strong><\/strong><\/div>\n<div><strong>G\u00dcNE\u015e \u0130\u00c7\u0130N KOREL\u0130LER`LE ANLA\u015eMI\u015eTI<\/strong><\/div>\n<div><\/div>\n<div>A&amp;S Enerji T\u00fcrkiye`de g\u00fcne\u015f yat\u0131r\u0131mlar\u0131 i\u00e7in daha \u00f6nce G\u00fcney Koreli bir firma ile anla\u015fm\u0131\u015f ve 450 milyon dolarl\u0131k yat\u0131r\u0131m planlad\u0131\u011f\u0131n\u0131 a\u00e7\u0131klam\u0131\u015ft\u0131. \u00d6zdemir`in verdi\u011fi bilgiye g\u00f6re, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde planlanan yat\u0131r\u0131mlarla ilgili sermaye ak\u0131\u015f\u0131n\u0131n ba\u015flamas\u0131yla birlikte b\u00fct\u00fcn enerji yat\u0131r\u0131mlar\u0131 A&amp;S Enerji \u015firketinin alt\u0131nda toplanacak. \u015eirketin \u00e7o\u011funluk hisseleri ise Aswar Group`un elinde olacak.<\/div>\n<div><\/div>\n<div>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/kuveytli-aswardan-amasyaya-1060-mwlik-dogalgaz-san_3964.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kuveytli Aswar National Group`un T\u00fcrkiye`deki i\u015ftiraki A&amp;S Enerji \u0130stanbul GCC Amasya`da 1,060 MW`l\u0131k do\u011falgaz \u00e7evrim santrali kuracak. T\u00fcrkiye enerji sekt\u00f6r\u00fcne yat\u0131r\u0131m i\u00e7in yeni [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12153,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[6182,6184,1162,4725,68,19,63,67,165,532,6186,6187,6181,6190,1301,6189,6183,6188],"views":2075,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12152"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12152"}],"version-history":[{"count":8,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12152\/revisions"}],"predecessor-version":[{"id":12156,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12152\/revisions\/12156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12153"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}