{"id":121256,"date":"2020-10-02T12:07:16","date_gmt":"2020-10-02T09:07:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=121256"},"modified":"2020-10-02T12:07:16","modified_gmt":"2020-10-02T09:07:16","slug":"turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin \u0130lk Hibrit GES Projesi&#8217;nin \u00c7ED Olumlu Karar\u0131 Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/121256\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Cengiz Enerji ve \u00d6zalt\u0131n \u0130n\u015faat\u2019\u0131n %50-50 ortakl\u0131k yap\u0131s\u0131ndan meydana gelen Kalehan Gen\u00e7 Enerji \u00dcretim A.\u015e. taraf\u0131ndan <img loading=\"lazy\" class=\"alignright wp-image-121258\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi.jpg\" alt=\"\" width=\"320\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi.jpg 673w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi-500x363.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/10\/turkiye-nin-ilk-hibrit-ges-projesinin-ced-olumlu-karari-alindi-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yap\u0131lmas\u0131 planlanan A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131 ve HES \/ Yard\u0131mc\u0131 Kaynak G\u00fcne\u015f Enerji Santrali\u2019nin \u00c7ED Raporuna y\u00f6nelik 17 Eyl\u00fcl 2020&#8217;de \u00c7ED olumlu karar\u0131n\u0131n verildi\u011fi a\u00e7\u0131kland\u0131.<\/strong><\/h1>\n<p>Raporda yer alan bilgiye g\u00f6re<strong> 75,614 MWe\/80 MWp<\/strong> kurulu g\u00fcce sahip olacak projeyle y\u0131ll\u0131k <strong>131,2 Gigavat Saat<\/strong> enerji \u00fcretiminin ger\u00e7ekle\u015ftirilmesi hedeflenmektedir.<\/p>\n<p><strong>Bing\u00f6l<\/strong>\u2019\u00fcn <strong>Gen\u00e7 il\u00e7esi<\/strong>nde <strong>35,6 milyon ABD Dolar\u0131<\/strong> yat\u0131r\u0131m bedeli ile tamamlanacak olan projede <strong>Talesun Bistar<\/strong>\u00a0<em>9BB TP6F72M model<\/em> g\u00fcne\u015f paneli <strong>FIMER&#8217;den<\/strong> tedarik edilecek olup <strong>5MVA<\/strong> g\u00fcce sahip\u00a0<strong>PVS serisi merkezi inverter<\/strong>\u00a0kurulumu da ger\u00e7ekle\u015ftirilecek. Proje tamamlanarak hizmete girdi\u011finde <strong>T\u00fcrkiye\u2019nin<\/strong> <strong>ilk hibrit GES yat\u0131r\u0131m\u0131<\/strong> ve <strong>YEKA modeli<\/strong> d\u0131\u015f\u0131nda kurulumu yap\u0131lan\u00a0<strong>en b\u00fcy\u00fck g\u00fcne\u015f enerji santrali (ges)<\/strong> \u00fcnvan\u0131na da sahip olmu\u015f olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Cengiz Enerji ve \u00d6zalt\u0131n \u0130n\u015faat\u2019\u0131n %50-50 ortakl\u0131k yap\u0131s\u0131ndan meydana gelen Kalehan Gen\u00e7 Enerji \u00dcretim A.\u015e. taraf\u0131ndan yap\u0131lmas\u0131 planlanan A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131 ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":121258,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,47],"tags":[80265,22080,5465,2890,80270,53157,80272,80267,80264,7934,80271,80269,80268,80266],"views":397,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/121256"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=121256"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/121256\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/121258"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=121256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=121256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=121256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}