{"id":12095,"date":"2013-06-19T10:16:39","date_gmt":"2013-06-19T07:16:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12095"},"modified":"2013-06-19T13:29:04","modified_gmt":"2013-06-19T10:29:04","slug":"gensed-gunes-enerji-santrali-lisans-basvurularini-degerlendirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gensed-gunes-enerji-santrali-lisans-basvurularini-degerlendirdi\/","title":{"rendered":"(Turkish) GENSED, G\u00fcne\u015f Enerji Santrali Lisans Ba\u015fvurular\u0131n\u0131 De\u011ferlendirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12095\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T.C. Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019nun (EPDK) 10-14 Haziran 2013 tarihleri aras\u0131nda 27 b\u00f6lgeyi kapsayan 38 \u015fehirde, 600 MW\u2019l\u0131k kapasite i\u00e7in a\u00e7t\u0131\u011f\u0131 ba\u015fvurular i\u00e7in rekor bir kat\u0131l\u0131m ger\u00e7ekle\u015fmi\u015ftir. Toplamda 8899 MW\u2019l\u0131k kurulu g\u00fc\u00e7 i\u00e7in 496 adet G\u00fcne\u015f Enerji Santrali (GES) lisans ba\u015fvurusu yap\u0131lm\u0131\u015ft\u0131r.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin ilk GES Lisans ba\u015fvurular\u0131, GENSED \u00fcyelerinin de aralar\u0131nda bulundu\u011fu ve \u00e7o\u011funlu\u011fu yerli yat\u0131r\u0131mc\u0131 olan firmalar taraf\u0131ndan ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p>Ba\u015fvurular\u0131 takip eden s\u00fcre\u00e7te, \u00f6ncelikle EPDK\u2019n\u0131n yap\u0131lan ba\u015fvurular\u0131 en k\u0131sa s\u00fcrede detayl\u0131 bir \u015fekilde inceleyerek yar\u0131\u015fma a\u015famas\u0131na getirece\u011fi ve TE\u0130A\u015e taraf\u0131ndan yap\u0131lacak yar\u0131\u015fmalar sonunda sisteme ba\u011flant\u0131 hakk\u0131 kazanarak GES Lisans\u0131 alan yat\u0131r\u0131mc\u0131lar\u0131n belli olaca\u011f\u0131 belirtilmi\u015ftir.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9723\" title=\"gunes-enerjisi-santrali-ba\u015fvurular\u0131-de\u011ferlendirme-gensed\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman-300x181.jpg\" alt=\"\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman-500x302.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-karaman.jpg 699w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>GENSED; \u00fclkemizin potansiyeline y\u00f6nelik b\u00fcy\u00fck g\u00fcvenin g\u00f6stergesi olan bu ilginin, yar\u0131\u015fmalar yerine ba\u015fvurular\u0131n s\u00fcrekli a\u00e7\u0131k tutularak, en etkin ve verimli \u015fekilde de\u011ferlendirilmesini temenni etti\u011fini ifade etmektedir. Gerek g\u00fcne\u015f enerjisi, gerekse g\u00fcne\u015f enerjisinden elektrik \u00fcretimine y\u00f6nelik ekipmanlar\u0131n \u00fcretimi a\u00e7\u0131s\u0131ndan b\u00fcy\u00fck bir potansiyele sahip olan T\u00fcrkiye\u2019nin bu s\u00fcreci son derece hassas y\u00fcr\u00fctmesinin gereklili\u011fini vurgulamaktad\u0131r.<\/p>\n<p>Bu s\u00fcrecin daha sa\u011fl\u0131kl\u0131 ve verimli hale getirilebilmesi konusunda GENSED, sekt\u00f6r\u00fc olu\u015fturan t\u00fcm kamu ve \u00f6zel sekt\u00f6r taraflar\u0131 ile beraber \u00e7al\u0131\u015fmalara devam edece\u011fini ve 600 MW\u2019l\u0131k ba\u015fvurular\u0131n h\u0131zl\u0131 bir \u015fekilde sonu\u00e7land\u0131r\u0131larak yeni ba\u015fvurular\u0131n a\u00e7\u0131lmas\u0131n\u0131 bekledi\u011fini ifade etmektedir.<\/p>\n<p><strong><em>Ayr\u0131nt\u0131l\u0131 bilgi i\u00e7in:<\/em><\/strong><\/p>\n<p align=\"left\"><a href=\"mailto:info@gensed.org\"><em>info@gensed.org<\/em><\/a><em>\u00a0\u00a0 <\/em><\/p>\n<p align=\"left\"><em>tel: 0216 455 35 00<\/em><\/p>\n<p>&#8212;<\/p>\n<p><strong><em>G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED) hakk\u0131nda:<\/em><\/strong><em><\/em><\/p>\n<p><em>T\u00fcrkiye\u2019de g\u00fcne\u015ften elektrik \u00fcretimini yayg\u0131nla\u015ft\u0131rma amac\u0131 ile 24 Aral\u0131k 2009 tarihinde kurulan, <\/em><em>G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED) T\u00fcrkiye\u2019deki en b\u00fcy\u00fck sekt\u00f6rel \u00f6rg\u00fctlenmedir. 100\u2019\u00fc a\u015fk\u0131n kurumsal, bireysel ve onursal \u00fcyeye sahip dernekte faaliyetler komisyon ve alt komisyonlarda y\u00fcr\u00fct\u00fclmekte ve periyodik olarak \u00fcyeler ile payla\u015f\u0131lmaktad\u0131r. Dernek faaliyetleri ve \u00fcyelik ile ilgili ayr\u0131nt\u0131l\u0131 bilgi i\u00e7in: <\/em><a href=\"http:\/\/www.gensed.org\"><em>www.gensed.org<\/em><\/a><em><\/em><\/p>\n<p>Yay\u0131nc\u0131 ve Kaynak: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T.C. Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019nun (EPDK) 10-14 Haziran 2013 tarihleri aras\u0131nda 27 b\u00f6lgeyi kapsayan 38 \u015fehirde, 600 MW\u2019l\u0131k kapasite i\u00e7in a\u00e7t\u0131\u011f\u0131 ba\u015fvurular i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9723,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,165,750,727,2326,6129,227,944,13,6128],"views":855,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12095"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12095"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12095\/revisions"}],"predecessor-version":[{"id":12098,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12095\/revisions\/12098"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9723"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}