{"id":120883,"date":"2020-09-25T12:39:41","date_gmt":"2020-09-25T09:39:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=120883"},"modified":"2020-09-25T12:39:52","modified_gmt":"2020-09-25T09:39:52","slug":"gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor\/","title":{"rendered":"(Turkish) &#8217;G\u00fclermak \u00c7elik&#8217; \u0130zmir Alia\u011fa OSB&#8217;deki Fabrika \u00c7at\u0131s\u0131na GES Kurduruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/120883\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>G\u00dcLERMAK \u00c7EL\u0130K Konstr\u00fcksiyon San ve Tic A.\u015e. \u00e7at\u0131 tipi GES projesine y\u00f6nelik bir <img loading=\"lazy\" class=\"alignright wp-image-120885\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor-2.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor-2.jpg 480w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/gulermak-celik-izmir-aliaga-osbdeki-fabrika-catisina-ges-kurduruyor-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>anla\u015fma imzalad\u0131.<\/strong><\/h1>\n<p><strong>T\u00fcrkiye\u2019nin \u00e7e\u015fitli b\u00f6lgeleri<\/strong>nde yeni <strong>g\u00fcne\u015f enerjisi santrallerinin kurulumlar\u0131n\u0131 <\/strong>\u00a0Asunim taraf\u0131ndan <strong>1958 y\u0131l\u0131ndan<\/strong> g\u00fcn\u00fcm\u00fcze toplam <strong>157.000 m2<\/strong> alan ve <em>yap\u0131sal &amp;mekanik \u00e7elikte<\/em> <strong>30.000 ton \/y\u0131l \u00fcretim kapasitesi<\/strong> ile <strong>T\u00fcrkiye\u2019nin<\/strong> en b\u00fcy\u00fck \u00e7elik fabrikalar\u0131ndan birisi konumundaki <strong>G\u00fclermak \u00c7elik<\/strong>\u2019in <strong>\u0130zmir Alia\u011fa OSB<\/strong>\u2019de bulunan fabrika \u00e7at\u0131s\u0131na<strong> 2.64 MWp<\/strong>\u2019l\u0131k <strong>g\u00fcne\u015f enerji santrali<\/strong> kurulumu ger\u00e7ekle\u015ftirecek.<\/p>\n<p><strong>T\u00fcm projelendirme ve tasar\u0131m s\u00fcre\u00e7lerin<\/strong>in <strong>Asunim\u2019in<\/strong> Avrupa\u2019da bulunan <strong>\u00e7at\u0131 \u00fczeri GES<\/strong> alan\u0131nda <strong>uzman m\u00fchendislik birimi<\/strong> taraf\u0131ndan yap\u0131laraktan <strong>projenin bak\u0131m onar\u0131m faaliyetleri<\/strong> ise Asunim\u2019in i\u015ftiraki, <strong>G\u00fcne\u015f Enerji Santralleri bak\u0131m &amp; onar\u0131m ve izleme hizmetleri<\/strong> alan\u0131nda \u00e7al\u0131\u015fan <strong>Maxima Enerji<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00dcLERMAK \u00c7EL\u0130K Konstr\u00fcksiyon San ve Tic A.\u015e. \u00e7at\u0131 tipi GES projesine y\u00f6nelik bir anla\u015fma imzalad\u0131. T\u00fcrkiye\u2019nin \u00e7e\u015fitli b\u00f6lgelerinde yeni g\u00fcne\u015f enerjisi santrallerinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":120887,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[79842,79846,45405,5070,52259,79840,79845,79844,53157,79841,79843,54979],"views":407,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120883"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=120883"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/120887"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=120883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=120883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=120883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}