{"id":12074,"date":"2013-06-18T15:07:22","date_gmt":"2013-06-18T12:07:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12074"},"modified":"2013-06-18T15:07:22","modified_gmt":"2013-06-18T12:07:22","slug":"ilk-5-ayda-1-263-mwlik-kurulu-guc-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilk-5-ayda-1-263-mwlik-kurulu-guc-devreye-alindi\/","title":{"rendered":"(Turkish) \u0130lk 5 Ayda 1.263 MW\u2019l\u0131k Kurulu G\u00fc\u00e7 Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12074\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye`de y\u0131l\u0131n ilk be\u015f ayl\u0131k d\u00f6neminde toplam kurulu g\u00fcc\u00fc 1.263 MW`yi bulan 87 elektrik \u00fcretim tesisi devreye al\u0131nd\u0131. 46 HES, 18 RES, 15 gaz santrali \u00fcretime ge\u00e7ti.<\/strong><\/p>\n<p>\u00d6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan santralar\u0131n devreye al\u0131nmas\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar, 2013 y\u0131l\u0131n\u0131n ilk 5 ay\u0131nda da devam etti. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 (ETKB), 2013 y\u0131l\u0131n\u0131n ilk 5 ay\u0131nda 1.263 MW\u2019l\u0131k 87 adet projenin ge\u00e7ici kabul ya<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-12075\" title=\"Elektrik-toplam-kurulu-guc--HI-211418\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418-300x203.jpg\" alt=\"\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418-300x203.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418-500x338.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Elektrik-toplam-kurulu-guc-HI-211418.jpg 588w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>parak, devreye ald\u0131.<br \/>\nDevreye al\u0131nan santrallar\u0131n 46 adedi 770.8 MW\u2019l\u0131k Hidroelektrik Santral (HES) projesi olurken, 18 adedi toplam 197.3 MW\u2019l\u0131k R\u00fczgar Enerjisi Santral\u0131 (RES), 15 adedi ise 203.3 MW\u2019l\u0131k do\u011falgaz santral\u0131 oldu.<\/p>\n<p>Ayr\u0131ca, bu d\u00f6nemde, 15.2 MW\u2019l\u0131k 1 adet at\u0131k \u0131s\u0131 santral\u0131, 24.5 MW\u2019l\u0131k motorin santral\u0131, 5 MW\u2019l\u0131k 2 adet biyogaz santral\u0131, 1.4 MW\u2019l\u0131k 1 adet biyok\u00fctle santral\u0131, 37 MW\u2019l\u0131k 1 adet linyit santral\u0131 devreye al\u0131nd\u0131.<\/p>\n<p>ETKB taraf\u0131ndan \u00fcnitelerinin ge\u00e7ici kabul yap\u0131larak devreye al\u0131nan santrallar aras\u0131nda kurulu g\u00fcc\u00fc ile dikkat \u00e7eken projeler \u015f\u00f6yle oldu:<\/p>\n<p>&#8211; Enerjisa, Adana K\u00f6pr\u00fc Baraj\u0131 ve HES 155 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; Age Denizli Do\u011falgaz Elektrik, Denizli Do\u011falgaz Kombine \u00c7evrim Santral\u0131 64,5 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Bereket Enerji, Adana Toros HES 49,9 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; Fernas Enerji, Batman Garzan HES42 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; \u00c7obany\u0131ld\u0131z\u0131 Elektrik, Konya Linyit Santral\u0131 37 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Alia\u011fa \u00c7akmaktepe Enerji, \u0130zmir Do\u011falgaz Kombine \u00c7evrim Santral\u0131 24 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; Bis Enerji, Bursa Kombine \u00c7evrim Santral\u0131 28 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Avkal Enerji, Amasya Kale HES 29,2 MW\u2019l\u0131k 3 \u00fcnite<br \/>\n&#8211; Prestij Enerji, Giresun Ko\u00e7ak Reg. ve HES 24,1 MW\u2019l\u0131k 3 \u00fcnite<br \/>\n&#8211; Y\u00fcksel Enerji, Bolu K\u00f6pr\u00fcba\u015f\u0131 HES 74 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; Suata Elektrik, Giresun Bur\u00e7ak HES 33,4 MW\u2019l\u0131k 2 \u00fcnite<br \/>\n&#8211; Egenda Ege Enerji, Adana E\u011flence 2 HES 26 MW\u2019l\u0131k 3 \u00fcnite<br \/>\n&#8211; T\u00fcrkiye Petrol Rafinerileri A.\u015e., \u0130zmir Motorin Santral\u0131 24,5 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Karadeniz Hidroelektrik Enerji, Giresun \u00c7\u0131rakdam\u0131 Reg. ve HES 24,5 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Kurtsuyu Elektrik, Karaman Daran I HES 23,8 MW\u2019l\u0131k 1 \u00fcnite<br \/>\n&#8211; Lodos Karaburun Elektrik, \u0130zmir Karaburun RES 22 Mw\u2019l\u0131k 11 \u00fcnite<br \/>\n&#8211; Zeytineli RES Elektrik, \u0130zmir Zeytineli RES 37,5 MW\u2019l\u0131k 15 \u00fcnite<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ilk-5-ayda-1263-mwlik-kurulu-guc-devreye-alindi_3943.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye`de y\u0131l\u0131n ilk be\u015f ayl\u0131k d\u00f6neminde toplam kurulu g\u00fcc\u00fc 1.263 MW`yi bulan 87 elektrik \u00fcretim tesisi devreye al\u0131nd\u0131. 46 HES, 18 RES, 15 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12075,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,47,50],"tags":[6098,6100,1678,4725,68,61,260,63,67,165,18,1972,1635,35370,1090,6101,6099,474,231],"views":814,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12074"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12074"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12074\/revisions"}],"predecessor-version":[{"id":12077,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12074\/revisions\/12077"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12075"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12074"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12074"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}