{"id":120430,"date":"2020-09-18T10:30:49","date_gmt":"2020-09-18T07:30:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=120430"},"modified":"2020-09-18T10:48:55","modified_gmt":"2020-09-18T07:48:55","slug":"seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi\/","title":{"rendered":"(Turkish) Seymen \u00c7\u00f6p Gaz\u0131 Enerji \u00dcretim Tesisi Faaliyetine Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/120430\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u0130n\u015fa s\u00fcrecinin b\u00fcy\u00fck k\u0131sm\u0131n\u0131n tamamland\u0131\u011f\u0131 Seymen \u00c7\u00f6p Gaz\u0131 Enerji \u00dcretim Tesisi\u00a0projesi, tek par\u00e7a bir alanda kurulu D\u00fcnya&#8217;n\u0131n en b\u00fcy\u00fck \u00e7\u00f6p gaz\u0131ndan enerji \u00fcretim tesislerinden birisi konumunda yer alacak olup YEO Group CEO\u2019su Tolunay Y\u0131ld\u0131z taraf\u0131ndan tesisin devreye al\u0131nmas\u0131 ile y\u0131lda 277 bin ton <strong>karbondioksit sal\u0131m\u0131n\u0131n<\/strong> \u00f6n\u00fcne ge\u00e7ilece\u011fine vurgu yap\u0131ld\u0131.<\/h2>\n<p>\u0130lk etapta\u00a0<strong>12 gaz motoru<\/strong>nun devreye al\u0131narak <strong>Enerji Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan kabul\u00fc ger\u00e7ekle\u015ftirilen santralin motorlar\u0131ndan \u015fu anda\u00a0<strong>18 MW<\/strong> enerji \u00fcretimi yap\u0131l\u0131rken bu say\u0131s\u0131 ilerleyen s\u00fcre\u00e7te\u00a0<strong>52<\/strong>\u2019ye<img loading=\"lazy\" class=\"alignright wp-image-120433\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi-1.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi-1.jpg 535w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi-1-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi-1-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/seymen-cop-gazi-enerji-uretim-tesisi-faaliyeti-ne-basladi-1-80x45.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/> \u00e7\u0131kacakt\u0131r. <strong>\u00c7\u00f6p gaz\u0131 \u00fcretim sahas\u0131<\/strong> yakla\u015f\u0131k<strong> 200 milyon liral\u0131k yat\u0131r\u0131m bedeli ile\u00a0<\/strong>tamamlanm\u0131\u015f olup\u00a0<strong>6 hektar<\/strong> alan \u00fczerinde in\u015fas\u0131 yakla\u015f\u0131k\u00a0<strong>2 y\u0131l<\/strong>\u00a0s\u00fcrm\u00fc\u015ft\u00fcr.<\/p>\n<p>Yat\u0131r\u0131mda <strong>Jenbacher, Conveco<\/strong> gibi \u015firketlerle birlikte \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131n\u0131 ifade eden YILDIZ, \u201c<strong>YEO Elektrik Otomasyon A.\u015e.<\/strong> olarak projenin,<strong> enerji santrali<\/strong> ve<strong> trafo merkezi<\/strong>nin <strong>elektrikasyon<\/strong> ve <strong>otomasyon<\/strong> i\u015flerinin; <strong>dizayn, imalat ve tedarik, montaj<\/strong> ve <strong>devreye alma<\/strong> gibi s\u00fcre\u00e7lerini <strong>anahtar teslim olarak<\/strong> ger\u00e7ekle\u015ftirdik.\u201d dedi.<\/p>\n<p><strong>Proje yat\u0131r\u0131mc\u0131s\u0131<\/strong>n\u0131n <strong>\u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi<\/strong> i\u015ftiraki olan <strong>\u0130stanbul Enerji<\/strong> firmas\u0131n\u0131n oldu\u011fu proje kapsam\u0131nda \u201c<strong>YEKDEM<\/strong>&#8216;den faydalan\u0131larak <strong>biyogaz santralleri<\/strong>, \u00fcretilen\u00a0<strong>1 kWh<\/strong> elektrik i\u00e7in <strong>13,3 sent<\/strong> <strong>te\u015fvikte<\/strong> al\u0131nmaktad\u0131r.<\/p>\n<h2 class=\"dtl-box gray\"><strong>Biyogaz Projeleri&#8217;nde 48,6 MW Kurulu G\u00fc\u00e7 Devreye Alma Plan\u0131<\/strong><\/h2>\n<p class=\"dtl-box gray\"><strong>Yenilenebilir enerji<\/strong> alan\u0131nda <strong>Seymen Projesi<\/strong>\u2019nin yan\u0131 s\u0131ra <strong>Bal\u0131kesir<\/strong>\u2019de <strong>1,5 mw<\/strong> Biyogaz Enerji \u00dcretim Santrali ve <strong>Ayd\u0131n<\/strong> <strong>\u00c7ine<\/strong>\u2019de <strong>13,6 mw<\/strong> <em>Biyok\u00fctle Enerji \u00dcretim Santrali<\/em>, <strong>\u00c7ank\u0131r\u0131<\/strong>\u2019da <strong>1,5 mw<\/strong> Biyogaz Enerji \u00dcretim Santrali ve <strong>Gaziantep<\/strong>\u2019te <strong>4,5 mw<\/strong> Biyogaz Enerji \u00dcretim Santrali projelerinin s\u00fcrd\u00fc\u011f\u00fcn\u00fc dile getiren Y\u0131ld\u0131z ayr\u0131ca, &#8220;<strong>Edirne Kat\u0131 At\u0131k D\u00fczenli Depolama ve Bertaraf Tesisi<\/strong>\u2019nde <strong>1,5 mw Kuru Fermantasyon Enerji \u00dcretim Santrali<\/strong> ve ger\u00e7ekle\u015ftirece\u011fimiz di\u011fer <strong>biyogaz enerjisi projeleri<\/strong>miz ile <strong>y\u0131l sonuna kadar<\/strong> toplamda<strong> 48,6 mw<\/strong> kurulu g\u00fcc\u00fc <strong>devreye almay\u0131<\/strong> planl\u0131yoruz.\u201d ifadelerini kulland\u0131.<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"nofollow noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130n\u015fa s\u00fcrecinin b\u00fcy\u00fck k\u0131sm\u0131n\u0131n tamamland\u0131\u011f\u0131 Seymen \u00c7\u00f6p Gaz\u0131 Enerji \u00dcretim Tesisi\u00a0projesi, tek par\u00e7a bir alanda kurulu D\u00fcnya&#8217;n\u0131n en b\u00fcy\u00fck \u00e7\u00f6p gaz\u0131ndan enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":120434,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[7179,3613,79390,64246,79388,7891,64244,79402,26809,34258,79397,79395,5148,79391,5070,79400,21919,52259,53032,4498,34502,79396,41805,60397,79401,79399,30503,79392,79387,79389,54979,79394,42316,79398,79393],"views":404,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120430"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=120430"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120430\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/120434"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=120430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=120430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=120430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}