{"id":120218,"date":"2020-09-14T12:56:37","date_gmt":"2020-09-14T09:56:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=120218"},"modified":"2020-09-14T12:56:46","modified_gmt":"2020-09-14T09:56:46","slug":"denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti\/","title":{"rendered":"(Turkish) &#8217;Denizli B\u00fcy\u00fck\u015fehir Belediyesi&#8217; G\u00fcne\u015ften 4,1 Milyon KWh\u2019lik Enerji \u00dcretti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/120218\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Denizli B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan enerji \u00fcretiminde fosil kaynaklar\u0131n etkisini azaltmak, enerji verimlili\u011finin art\u0131r\u0131lmas\u0131n\u0131 sa\u011flamaya y\u00f6nelik \u00fclke ekonomisine katk\u0131 sa\u011flamak amac\u0131yla 2017 y\u0131l\u0131nda Akk\u00f6y G\u00fcne\u015f Enerji Santrali&#8217;nin (GES) ilk a\u015famas\u0131 tamamlanarak devreye al\u0131nd\u0131.<\/h1>\n<p>Denizli B\u00fcy\u00fck\u015fehir Belediyesi <strong>DESK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc<\/strong>&#8216;n\u00fcn hayata ge\u00e7irdi\u011fi <strong>g\u00fcne\u015f tarlalar\u0131 projesi<\/strong>nin <strong>2&#8217;inci a\u015famas\u0131<\/strong> olan <strong>Akk\u00f6y GES 2<\/strong> ise <strong>2018 y\u0131l\u0131nda<\/strong> faaliyete ge\u00e7ti. Verimli bir \u015fekilde e<img loading=\"lazy\" class=\"alignright wp-image-120220\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti.jpg 747w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/denizli-buyuksehir-belediyesi-gunesten-41-milyon-kwh-lik-enerji-uretti-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>lektrik enerjisi \u00fcreten Denizli B\u00fcy\u00fck\u015fehir Belediyesinin g\u00fcne\u015f tarlalar\u0131 bu y\u0131l da b\u00fcy\u00fcmesini s\u00fcrd\u00fcrd\u00fc. <strong>2017&#8217;de<\/strong> ba\u015flayan ve <strong>39.000 metrekare<\/strong> alana kurulan projenin yakla\u015f\u0131k <strong>3 ay<\/strong> \u00f6nce <strong>3&#8217;\u00fcnc\u00fc a\u015famas\u0131<\/strong> da tamamland\u0131. <strong>Akk\u00f6y GES 3<\/strong>&#8216;\u00fcn de tamamlanmas\u0131 ile <strong>8 bin 480 adet<\/strong> g\u00fcne\u015f paneli kullan\u0131\u015fm\u0131\u015f oldu.<\/p>\n<p>2 MW kurulu g\u00fcce sahip <strong>yenilenebilir enerji yat\u0131r\u0131mlar\u0131<\/strong>n\u0131 s\u00fcrd\u00fcren <strong>Denizli B\u00fcy\u00fck\u015fehir Belediyesi<\/strong>nin g\u00fcne\u015f enerji santrali, <strong>GES 3<\/strong>&#8216;\u00fcn de tamamlanmas\u0131yla <strong>2 MW<\/strong>\u2019l\u0131k g\u00fcc\u00fc yakalad\u0131. <strong>Denizli B\u00fcy\u00fck\u015fehir Belediyesi&#8217;<\/strong>nin aral\u0131klarla hizmete giren <strong>g\u00fcne\u015f tarlalar\u0131<\/strong> bug\u00fcne kadar<strong> 4,1 milyon Kwh&#8217;lik<\/strong> enerji \u00fcretti. <strong>Toplam yat\u0131r\u0131m maliyeti<\/strong>nin b\u00fcy\u00fck bir b\u00f6l\u00fcm\u00fcn\u00fcn bug\u00fcne kadar \u00fcretilen enerjiden kar\u015f\u0131land\u0131\u011f\u0131na dikkat \u00e7ekilirken, <strong>Akk\u00f6y GES1, 2 ve 3<\/strong> ile y\u0131ll\u0131k toplam \u00fcretim hedefinin ise\u00a0<strong>4 milyon KWh<\/strong> oldu\u011funa vurgu yap\u0131ld\u0131.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.denizligazetesi.com\/guncel\/buyuksehir-gunes-tarlalari-ile-41-milyon-kwh-lik-elektrik-h98018.html\" target=\"_blank\" rel=\"nofollow noopener\">Denizli Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Denizli B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan enerji \u00fcretiminde fosil kaynaklar\u0131n etkisini azaltmak, enerji verimlili\u011finin art\u0131r\u0131lmas\u0131n\u0131 sa\u011flamaya y\u00f6nelik \u00fclke ekonomisine katk\u0131 sa\u011flamak amac\u0131yla 2017 y\u0131l\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":120220,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[79184,79189,79181,79179,79188,79191,79180,79186,79183,79192,79182,79187,79190,79185,79177,79178,49483,845,45211,49482,53114,5070,52259,13522,29013,53157,26729,54979,1245],"views":75,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120218"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=120218"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120218\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/120220"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=120218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=120218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=120218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}