{"id":12015,"date":"2013-06-17T14:10:31","date_gmt":"2013-06-17T11:10:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12015"},"modified":"2013-06-17T14:10:31","modified_gmt":"2013-06-17T11:10:31","slug":"gelinkaya-hes-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gelinkaya-hes-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Gelinkaya HES, Enerji \u00dcretimine Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12015\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akfen Hidroelektrik Santrali Yat\u0131r\u0131mlar\u0131 A.\u015e.\u2019ye ba\u011fl\u0131 PAK Enerji \u00dcretimi Sanayi Tic. A.\u015e.&#8217;nin <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-6903\" title=\"gelinkaya-hes-enerji-uretimine-basladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434-300x257.jpg\" alt=\"\" width=\"300\" height=\"257\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434-300x257.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434-465x400.jpg 465w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434-58x50.jpg 58w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/hes2-505x434.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Erzurum\u2019un Il\u0131ca il\u00e7esinde bulunan 6,9 MW kurulu g\u00fc\u00e7 kapasitesine sahip Gelinkaya HES Projesi, ticari enerji \u00fcretimine ba\u015flad\u0131.<\/strong><\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n onay\u0131yla santral mevzuat\u0131na uygun olarak enerji \u00fcretimine ba\u015flayan Gelinkaya HES\u2019in y\u0131ll\u0131k 25,8 GWs elektrik \u00fcretmesi bekleniyor. Yat\u0131r\u0131m program\u0131na uygun \u015fekilde hidroelektrik santrallerini ticari enerji \u00fcretimi i\u00e7in devreye almaya devam eden Akfen Holding\u2019in 14 Haziran itibariyle ba\u011fl\u0131 ortakl\u0131klar\u0131 yoluyla faaliyet g\u00f6sterdi\u011fi 8 hidroelektrik santralinde toplam 142,2 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 551 GWs \u00fcretim kapasitesine ula\u015f\u0131ld\u0131.<\/p>\n<p>Akfen Holding, 6 Haziran 2013 tarihinde 26 MW kurulu g\u00fcce sahip 5 adet hidroelektrik santralinden olu\u015fan Karasular Enerji\u2019de kalan y\u00fczde 60 hissesini Aquila Grubu\u2019na satm\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.bugun.com.tr\/son-dakika\/gelinkaya-hes-enerji-uretimine-basladi-haberi\/666068\" target=\"_blank\">Bug\u00fcn<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akfen Hidroelektrik Santrali Yat\u0131r\u0131mlar\u0131 A.\u015e.\u2019ye ba\u011fl\u0131 PAK Enerji \u00dcretimi Sanayi Tic. A.\u015e.&#8217;nin Erzurum\u2019un Il\u0131ca il\u00e7esinde bulunan 6,9 MW kurulu g\u00fc\u00e7 kapasitesine sahip Gelinkaya [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6903,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[6049,6047,19,63,67,165,18,6046,35370,1090,6048],"views":1653,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12015"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12015"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12015\/revisions"}],"predecessor-version":[{"id":12017,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12015\/revisions\/12017"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/6903"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}