{"id":120145,"date":"2020-09-13T17:34:48","date_gmt":"2020-09-13T14:34:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=120145"},"modified":"2020-09-13T17:35:45","modified_gmt":"2020-09-13T14:35:45","slug":"gunes-enerjisi-ndeki-kurulu-guc-63-mw-artisla-6-294-mw-a-yukseldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisi-ndeki-kurulu-guc-63-mw-artisla-6-294-mw-a-yukseldi\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisindeki Kurulu G\u00fc\u00e7 63 MW Art\u0131\u015fla 6.294 MW\u2019e Y\u00fckseldi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/120145\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan A\u011fustos 2020 Kurulu G\u00fc\u00e7 Raporu Yay\u0131mland\u0131. Rapora g\u00f6re, toplam kurulu g\u00fc\u00e7 93.022,7 MW olurken 2020 A\u011fustos&#8217;un sonu itibari ile kurulu g\u00fcc\u00fcn 6.294,7 MW\u2019l\u0131k k\u0131sm\u0131 g\u00fcne\u015f enerjisi santrallerinden meydana geldi. G\u00fcne\u015f enerjisindeki kurulu g\u00fc\u00e7 bir \u00f6nceki aya g\u00f6re 63 MW art\u0131\u015f kaydetti.<\/strong><\/h1>\n<p><strong>TE\u0130A\u015e<\/strong>\u2019\u0131n ayl\u0131k olarak yay\u0131mlad\u0131\u011f\u0131 <strong>kurulu g\u00fc\u00e7 raporu<\/strong>na g\u00f6re, a\u011fustos ay\u0131nda <strong>elektrik \u00fcretim kurulu g\u00fcc\u00fc<\/strong> bir \u00f6nceki aya g\u00f6re <strong>139 MW<\/strong> art\u0131\u015f ile <strong>93.022,7 MW<\/strong> de\u011ferine y\u00fckseldi.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-120148\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo.jpg\" alt=\"\" width=\"600\" height=\"260\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo.jpg 1125w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo-300x130.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo-768x333.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo-1024x444.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo-500x217.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/09\/teia\u015f-agutos-2020-tablo-80x35.jpg 80w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><strong>T\u00fcrkiye<\/strong>\u2019deki <strong>lisansl\u0131 GES<\/strong> say\u0131s\u0131<strong> 20<\/strong> adet; <strong>lisanss\u0131z GES<\/strong> say\u0131s\u0131 ise bir \u00f6nceki aya g\u00f6re <strong>53 adetlik bir <\/strong>art\u0131\u015fla\u00a0<strong>7.198\u2019e<\/strong> ula\u015ft\u0131. Y\u0131l\u0131n ilk 8 ay\u0131nda toplam<strong> 300 MW\u2019lik<\/strong> <em>g\u00fcne\u015f enerjisi santrali<\/em> <strong>T\u00fcrkiye\u2019nin kurulu g\u00fcc\u00fc<\/strong>ne ilave oldu.<\/p>\n<p><strong>Daha Detayl\u0131 Bilgi \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/www.teias.gov.tr\/rakamlarla-elektrik-iletimi\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.teias.gov.tr\/rakamlarla-elektrik-iletimi <\/a>adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan A\u011fustos 2020 Kurulu G\u00fc\u00e7 Raporu Yay\u0131mland\u0131. Rapora g\u00f6re, toplam kurulu g\u00fc\u00e7 93.022,7 MW olurken 2020 A\u011fustos&#8217;un [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":120149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[79120,79121,79123,53114,5070,52259,35038,53157,65136,8731,79124,8732,54431,79125,47585,79122,17903],"views":227,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120145"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=120145"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/120145\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/120149"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=120145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=120145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=120145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}