{"id":119420,"date":"2020-08-31T00:17:10","date_gmt":"2020-08-30T21:17:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=119420"},"modified":"2020-08-31T00:39:09","modified_gmt":"2020-08-30T21:39:09","slug":"turkiye-nin-ruzgardaki-gucu-ilk-6-ayda-8-288-mw-a-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-ruzgardaki-gucu-ilk-6-ayda-8-288-mw-a-ulasti\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin R\u00fczgardaki G\u00fcc\u00fc \u0130lk 6 Ayda 8.288 MW\u2019a Ula\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/119420\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>2020 y\u0131l\u0131n\u0131n ilk 6 ay\u0131nda, \u00f6zellikle k\u0131s\u0131tlamalar\u0131n ya\u015fand\u0131\u011f\u0131 d\u00f6nemde r\u00fczgar enerji santralleri elektrik talebini kar\u015f\u0131lamada \u00f6nemli rol oynad\u0131.<\/h1>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-119423\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/01-4.jpg\" alt=\"\" width=\"650\" height=\"412\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/01-4.jpg 681w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/01-4-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/01-4-500x317.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/01-4-80x50.jpg 80w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/p>\n<p>* <strong>T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi T\u00dcREB,<\/strong> 2020 y\u0131l\u0131 <strong>ilk 6 ay verilerini<\/strong> kapsayan <strong>T\u00fcrkiye R\u00fczgar Enerjisi 2020 Temmuz \u0130statistik Raporu<\/strong>\u2019nu yay\u0131nlad\u0131.<\/p>\n<p>* Rapora g\u00f6re <strong>2020 y\u0131l\u0131n\u0131n<\/strong> ilk yar\u0131s\u0131nda <strong>Covid-19 salg\u0131n\u0131<\/strong>na ra\u011fmen devreye al\u0131nabilen kurulu g\u00fc\u00e7 seviyesi <strong>232 MW<\/strong>\u2019ta ula\u015ft\u0131. Toplamda <strong>% 2,8<\/strong> art\u0131\u015fa tekab\u00fcl eden bu rakamla <em>T\u00fcrkiye\u2019nin r\u00fczgar kurulu g\u00fcc\u00fc<\/em> <strong>8.288 MW<\/strong>\u2019a ula\u015ft\u0131.<\/p>\n<p>* Y\u0131l\u0131n ilk <strong>6 ay\u0131nda<\/strong> r\u00fczgardan elde edilen elektrik toplam\u0131 <strong>11 milyon 506 bin 233 kilovat saate<\/strong> eri\u015firken bu miktar T\u00fcrkiye\u2019de \u00fcretilen toplam elektri\u011fin <strong>% 8,52<\/strong>\u2019sini olu\u015fturdu. <strong>Nisan ay\u0131nda<\/strong> ise T\u00fcrkiye\u2019de \u00fcretilen elektri\u011fin <strong>% 10,36<\/strong>\u2019s\u0131 r\u00fczgardan kar\u015f\u0131land\u0131.<\/p>\n<p>* 2.451,05 MW\u2019l\u0131k 53 r\u00fczgar santrali halen in\u015fa a\u015famas\u0131nda bulunuyor.<\/p>\n<h2><strong>\u201cBu santraller halen, r\u00fczgar enerji sekt\u00f6r\u00fcn\u00fcn beklentisi olan \u2018Koronavir\u00fcs kaynakl\u0131 m\u00fccbir sebep ilan edilmesi ve mevcut destek mekanizmas\u0131n\u0131n bitim tarihinin \u00f6telenmesi\u2019 karar\u0131n\u0131 bekliyor\u201d diyen T\u00dcREB Ba\u015fkan\u0131 Hakan Y\u0131ld\u0131r\u0131m, Avrupa\u2019da \u0130spanya, Almanya, \u0130rlanda, \u0130ngiltere gibi bir\u00e7ok \u00fclkenin bu y\u00f6nde kararlar alarak kendi r\u00fczgar enerjisi sekt\u00f6rlerini destekledi\u011fine vurgu yapt\u0131 ve \u201cKoronavir\u00fcs sebebiyle ya\u015fanan gecikmelerden dolay\u0131 m\u00fccbir sebep ilan\u0131 yoluna gidilmezse bu y\u0131l sonunda devreye al\u0131nmas\u0131 planlanan santral yat\u0131r\u0131mlar\u0131n\u0131n tamamlanmas\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde zora girecek\u201d uyar\u0131s\u0131n\u0131 tekrarlad\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-119424\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/02-4.jpg\" alt=\"\" width=\"591\" height=\"557\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/02-4.jpg 591w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/02-4-300x283.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/02-4-424x400.jpg 424w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/02-4-53x50.jpg 53w\" sizes=\"(max-width: 591px) 100vw, 591px\" \/><\/p>\n<h2><strong>Yat\u0131r\u0131mc\u0131larda ilk 5 ayn\u0131 kald\u0131: Polat Enerji, G\u00fcri\u015f, Demirer Enerji, Borusan EnBW ve Eksim Yat\u0131r\u0131m Holding<\/strong><\/h2>\n<p>2020 y\u0131l\u0131n\u0131n ilk yar\u0131s\u0131nda r\u00fczgarda kurulu g\u00fc\u00e7te ilk <strong>5 s\u0131ra<\/strong> yine de\u011fi\u015fmedi. Rapora g\u00f6re bu d\u00f6nemde <strong>i\u015fletmedeki santrallerin<\/strong> yat\u0131r\u0131mc\u0131lara g\u00f6re da\u011f\u0131l\u0131m\u0131 <span style=\"text-decoration: underline;\">\u015fu \u015fekilde ger\u00e7ekle\u015fti:<\/span><\/p>\n<p>&#8211; Polat Enerji <strong>598,7 MW<\/strong> kurulu g\u00fc\u00e7le <strong>% 7,22<\/strong><\/p>\n<p>&#8211; G\u00fcri\u015f <strong>569,85 MW<\/strong> kurulu g\u00fc\u00e7le <strong>% 6,88<\/strong><\/p>\n<p>&#8211; Demirer Enerji <strong>566,85 MW<\/strong> kurulu g\u00fc\u00e7le <strong>% 6,84<\/strong><\/p>\n<p>&#8211; Borusan EnBW <strong>446,35 MW<\/strong> kurulu g\u00fc\u00e7le <strong>% 5,37<\/strong><\/p>\n<p>&#8211; Eksim Yat\u0131r\u0131m Holding <strong>382 MW<\/strong> kurulu g\u00fc\u00e7le <strong>% 4,61<\/strong>\u2019lik pay ald\u0131.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-119425\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/03-1.jpg\" alt=\"\" width=\"441\" height=\"154\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/03-1.jpg 441w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/03-1-300x105.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/03-1-80x28.jpg 80w\" sizes=\"(max-width: 441px) 100vw, 441px\" \/><\/p>\n<h2><strong>\u0130n\u015fa halindeki santral hacmi \u00e7ok y\u00fcksek: 2.451,05 MW\u2019l\u0131k santralin yap\u0131m\u0131 s\u00fcr\u00fcyor<\/strong><\/h2>\n<p>T\u00fcrkiye\u2019de halen <strong>2.451,05 MW<\/strong>\u2019l\u0131k <strong>53<\/strong> r\u00fczgar santralinin in\u015fas\u0131 devam ediyor. Bu santrallerin, tek t\u00fcrbinin devreye al\u0131nmas\u0131 ile k\u0131smi kabulle de olsa <strong>YEKDEM<\/strong>\u2019den yararlanabilmesi i\u00e7in yat\u0131r\u0131mc\u0131lar \u00e7al\u0131\u015f\u0131yor. T\u00dcREB taraf\u0131ndan yap\u0131lan ankete kat\u0131l\u0131mc\u0131lardan gelen verilere g\u00f6re, k\u0131smi kabullerle devreye girecek <strong>RES projeleri<\/strong>nin <strong>31 Ekim\u2019e<\/strong> kadar yakla\u015f\u0131k <strong>1.250 MW<\/strong>,<strong> 31 Aral\u0131k<\/strong>\u2019a kadar ise yakla\u015f\u0131k <strong>1.100 MW<\/strong> g\u00fc\u00e7 ile <strong>YEKDEM mekanizmas\u0131<\/strong>na dahil olabilecekleri \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>\u0130n\u015fas\u0131 s\u00fcren santrallerde ilk 5 s\u0131ray\u0131 <strong>RT Enerji, T\u00fcrkerler, Borusan EnBW, Fina Enerji<\/strong> ve <strong>Sanko Enerji<\/strong> payla\u015f\u0131yor. <span style=\"text-decoration: underline;\">Buna g\u00f6re:<\/span><\/p>\n<p>&#8211; <strong>RT Enerji<\/strong>\u2019nin <strong>363,74 MW<\/strong>\u2019l\u0131k<\/p>\n<p>&#8211; <strong>T\u00fcrkerler<\/strong>\u2019in<strong> 244,86 MW<\/strong>\u2019l\u0131k<\/p>\n<p>&#8211; <strong>Borusan EnBW<\/strong>\u2019nun <strong>210 MW<\/strong>\u2019l\u0131k<\/p>\n<p>&#8211; <strong>Fina Enerji<\/strong>\u2019nin <strong>203 MW<\/strong>\u2019l\u0131k ve<\/p>\n<p>&#8211; <strong>Sanko Enerji<\/strong>\u2019nin de <strong>194,60 MW<\/strong>\u2019l\u0131k <strong>r\u00fczgar santrali<\/strong> halen in\u015fa halinde.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-119426\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/04.jpg\" alt=\"\" width=\"481\" height=\"525\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/04.jpg 481w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/04-275x300.jpg 275w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/04-366x400.jpg 366w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/04-46x50.jpg 46w\" sizes=\"(max-width: 481px) 100vw, 481px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"size-full wp-image-119427 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/05.png\" alt=\"\" width=\"289\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/05.png 289w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/05-80x50.png 80w\" sizes=\"(max-width: 289px) 100vw, 289px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2020 y\u0131l\u0131n\u0131n ilk 6 ay\u0131nda, \u00f6zellikle k\u0131s\u0131tlamalar\u0131n ya\u015fand\u0131\u011f\u0131 d\u00f6nemde r\u00fczgar enerji santralleri elektrik talebini kar\u015f\u0131lamada \u00f6nemli rol oynad\u0131. * T\u00fcrkiye R\u00fczgar Enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":119432,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[929,52259,7043,1092,5121,4353,65693,35002,22632,10278,53282,54979,57618,78260,3390,8275,29410],"views":390,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/119420"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=119420"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/119420\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/119432"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=119420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=119420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=119420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}