{"id":119265,"date":"2020-08-28T12:11:56","date_gmt":"2020-08-28T09:11:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=119265"},"modified":"2020-08-28T12:11:56","modified_gmt":"2020-08-28T09:11:56","slug":"kahramanmarastaki-tarim-arazileri-masdaf-ile-hayat-buluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kahramanmarastaki-tarim-arazileri-masdaf-ile-hayat-buluyor\/","title":{"rendered":"(Turkish) Kahramanmara\u015f\u2019taki Tar\u0131m Arazileri &#8216;Masdaf&#8217; ile Hayat Buluyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/119265\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Yar\u0131m asra yakla\u015fan tecr\u00fcbesi ve m\u00fchendislik g\u00fcc\u00fcyle pompa teknolojileri alan\u0131nda entegre \u00e7\u00f6z\u00fcmler sunan Masdaf, se\u00e7kin referans projelere imza atmay\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/h1>\n<p><em>Tar\u0131mda T\u00fcrkiye\u2019nin incisi olan <strong>Kahramanmara\u015f<\/strong>\u2019da <strong>22.500 dekar<\/strong> tar\u0131m arazisinin sulanmas\u0131 amac\u0131yla in\u015fa edilen <strong>\u201cDS\u0130 Sire\u015fanl\u0131 Pompaj Sulama 1.K\u0131s\u0131m Projesi\u201d<\/strong> de Masdaf\u2019\u0131n \u00e7\u00f6z\u00fcm orta\u011f\u0131 oldu\u011fu projeler listesine eklendi. Projede Masdaf\u2019\u0131n y\u00fcksek verimli \u201c<strong>SPLT serisi Ayr\u0131labilir <img loading=\"lazy\" class=\"alignright wp-image-119268\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/kahramanmaras-taki-tarim-arazileri-masdaf-ile-hayat-buluyor.jpg\" alt=\"\" width=\"320\" height=\"234\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/kahramanmaras-taki-tarim-arazileri-masdaf-ile-hayat-buluyor.jpg 666w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/kahramanmaras-taki-tarim-arazileri-masdaf-ile-hayat-buluyor-300x220.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/kahramanmaras-taki-tarim-arazileri-masdaf-ile-hayat-buluyor-500x366.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/kahramanmaras-taki-tarim-arazileri-masdaf-ile-hayat-buluyor-68x50.jpg 68w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>G\u00f6vdeli \u00c7ift Emi\u015fli Santrif\u00fcj Pompalar\u0131<\/strong>\u201d tercih edildi.<\/em><\/p>\n<p><strong>\u00c7evreci ve inovatif pompa teknolojileri<\/strong> ile <strong>43 y\u0131ld\u0131r<\/strong> T\u00fcrkiye <strong>pompa sekt\u00f6r\u00fc<\/strong>n\u00fcn \u00f6nc\u00fc markas\u0131 olan <strong>Masdaf<\/strong>, se\u00e7kin referans projelere imza atmaya devam ediyor. <strong>Kahramanmara\u015f<\/strong>\u2019da <strong>22.500 dekar<\/strong> <strong>tar\u0131m arazisinin sulanmas\u0131<\/strong> amac\u0131yla in\u015fa edilen \u201c<strong>DS\u0130 \u015eire\u015fanl\u0131 Pompaj Sulama 1.K\u0131s\u0131m Projesi<\/strong>\u201d de Masdaf\u2019\u0131n <strong>\u00e7\u00f6z\u00fcm orta\u011f\u0131 oldu\u011fu<\/strong> projeler listesindeki yerini ald\u0131.<\/p>\n<p>Kurulu\u015fundan g\u00fcn\u00fcm\u00fcze kadar T\u00fcrkiye\u2019de ki<strong> 8.5 milyon<\/strong> hektar tar\u0131m sahas\u0131n\u0131n yakla\u015f\u0131k<strong> %50\u2019sini<\/strong> suya kavu\u015fturan <strong>DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc<\/strong>; sanayinin ihtiyac\u0131 olan <strong>zirai \u00fcr\u00fcnlerin dengeli<\/strong> ve<strong> s\u00fcrekli \u00fcretilebilmesi<\/strong>, tar\u0131m kesiminde \u00e7al\u0131\u015fan n\u00fcfusun<strong> i\u015fsizlik probleminin \u00e7\u00f6z\u00fclmesi<\/strong> ve <strong>hayat standard\u0131n\u0131n y\u00fckseltilmesi<\/strong> i\u00e7in gereken <strong>sulama tesislerinin in\u015fa edilmesi<\/strong> amac\u0131yla faaliyetlerine h\u0131zla devam ediyor.<\/p>\n<h2><strong>22 bin 500 dekar arazi can suyuna kavu\u015facak<\/strong><\/h2>\n<p><strong>DS\u0130<\/strong> taraf\u0131ndan <strong>Kahramanmara\u015f<\/strong>\u2019da kurulan <strong>\u201cSire\u015fanl\u0131 Pompaj Sulama 1.K\u0131s\u0131m Projesi\u201d<\/strong> kapsam\u0131nda <strong>Kartalkaya Baraj\u0131<\/strong> dipsava\u011f\u0131ndan al\u0131nan <strong>sulama suyu, terfi istasyonu<\/strong> vas\u0131tas\u0131yla maksimum <strong>42 metre<\/strong> terfi ettirildikten sonra <strong>Kartalkaya Baraj\u0131<\/strong> sa\u011f sahilinde bulunan <strong>22 bin 500 dekar arazi<\/strong>, can suyuna kavu\u015facak. B\u00f6lgede yap\u0131lacak sulu tar\u0131m ile birlikte y\u00f6re \u00e7ift\u00e7isinin gelir art\u0131\u015f\u0131 sa\u011flamas\u0131 ve <strong>5.800 ki\u015fiye istihdam<\/strong> imkan\u0131 sunulmas\u0131 hedefleniyor. Bu proje ile tar\u0131mda T\u00fcrkiye\u2019nin incisi olan <strong>Kahramanmara\u015f\u2019\u0131n verimli arazileri<\/strong>, Masdaf\u2019\u0131n <strong>y\u00fcksek pompa teknolojileri<\/strong> ile hayat bulacak.<\/p>\n<p><strong>ARGES \u0130n\u015faat<\/strong> taraf\u0131ndan in\u015fa edilen projenin <strong>terfi istasyonu<\/strong>nda Masdaf\u2019\u0131n SPLT serisi <strong>Ayr\u0131labilir G\u00f6vdeli \u00c7ift Emi\u015fli Santrif\u00fcj<\/strong> <strong>Pompalar\u0131<\/strong> tercih edildi. <strong>DS\u0130 teknik \u015fartnamesi<\/strong>ne uygun olarak imal edilen pompalar\u0131n, <strong>montaj ve devreye alma \u00e7al\u0131\u015fmalar\u0131<\/strong> da Masdaf\u2019\u0131n alan\u0131nda uzman m\u00fchendisleri taraf\u0131ndan titizlikle yap\u0131ld\u0131.<\/p>\n<h2><strong>Maksimum Enerji Tasarrufu ile Sistem Verimlili\u011fi<\/strong><\/h2>\n<p><strong>Sire\u015fanl\u0131 Pompaj Sulama \u0130stasyonu<\/strong>\u2019nda maksimum<strong> enerji tasarrufu<\/strong> ile <strong>sistem verimlili\u011fi<\/strong> sa\u011flayacak SPLT serisi <strong>Ayr\u0131labilir G\u00f6vdeli \u00c7ift Emi\u015fli Santrif\u00fcj<\/strong> pompalar\u0131n devreye alma i\u015flemi esnas\u0131nda; \u201c<em>pompalar\u0131n <strong>\u015fase<\/strong> ve<strong> kaide montajlar\u0131n\u0131n<\/strong> ba\u011flant\u0131 kontrol\u00fc, pompa <strong>emme<\/strong> ve <strong>basma tesisat\u0131<\/strong> desteklerinin kontrol\u00fc, <strong>kompansat\u00f6r ba\u011flant\u0131s\u0131<\/strong> ve<strong> uygunlu\u011funun kontrol\u00fc, pompa tesisat ba\u011flant\u0131s\u0131n\u0131n kontrol\u00fc, rediksiyon, vana ve \u00e7ekvalf uygulama yerlerinin kontrol\u00fc, pompa ve flan\u015f ba\u011flant\u0131lar\u0131n\u0131n s\u0131k\u0131l\u0131k kontrol\u00fc, kaplin ayr\u0131, kumanda panosu besleme ve motor kablo ba\u011flant\u0131lar\u0131n\u0131n kontrol\u00fc ve bas\u0131n\u00e7 kontrol\u00fc<\/strong><\/em>\u201d yap\u0131larak sistemin; performansl\u0131, verimli ve sorunsuz bir \u015fekilde \u00e7al\u0131\u015fmas\u0131 sa\u011fland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yar\u0131m asra yakla\u015fan tecr\u00fcbesi ve m\u00fchendislik g\u00fcc\u00fcyle pompa teknolojileri alan\u0131nda entegre \u00e7\u00f6z\u00fcmler sunan Masdaf, se\u00e7kin referans projelere imza atmay\u0131 s\u00fcrd\u00fcr\u00fcyor. Tar\u0131mda T\u00fcrkiye\u2019nin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":119268,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,52],"tags":[78145,78141,5114,78140,78148,78150,78152,78143,75337,78147,65093,78151,78149,78142,78139,78146,73024,78144,73019],"views":87,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/119265"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=119265"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/119265\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/119268"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=119265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=119265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=119265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}