{"id":11906,"date":"2013-06-14T10:27:54","date_gmt":"2013-06-14T07:27:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=11906"},"modified":"2013-06-14T10:29:09","modified_gmt":"2013-06-14T07:29:09","slug":"gunes-eken-77-kat-fazla-kazaniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-eken-77-kat-fazla-kazaniyor\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Eken 77 Kat Fazla Kazan\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/11906\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye`nin tah\u0131l ambar\u0131 Konya ve Karaman`daki bu\u011fday tarlalar\u0131, daha k\u00e2rl\u0131 oldu\u011fu i\u00e7in g\u00fcne\u015f enerjisi panelleriyle kaplan\u0131yor. Tarlas\u0131na g\u00fcne\u015f eken bu\u011fday ekenden 77 kat fazla kazan\u0131yor. Sabah Gazetesi`nden \u00d6zge Yavuz`un haberine g\u00f6re T\u00fcrkiye`de g\u00fcne\u015ften enerji \u00fcretimine y\u00f6nelik talepte patlama ya\u015fan\u0131yor.<\/strong><\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurulu`nun (EPDK) 10 Haziran`da kabul etmeye ba\u015flad\u0131\u011f\u0131 \u00fcretim lisans\u0131 ba\u015fvurular\u0131na gelen talep de bunu do\u011frular nitelikte. Kurula 3 g\u00fcnde toplam kurulu g\u00fcc\u00fc 2 bin 900 megavata ula\u015fan 260 ba\u015fvuru geldi\u011fi a\u00e7\u0131kland\u0131. EPDK, yar\u0131n saat 18.00`e kadar yap\u0131lacak olanlarla birlikte bu y\u0131l i\u00e7in yakla\u015f\u0131k 1.2 milyar lira tutar\u0131nda ba\u015fvuru bekliyor.<\/p>\n<p><strong>&#8220;G\u00fcne\u015f topla bu\u011fday yerine&#8221;<\/strong><\/p>\n<p>G\u00fcne\u015ften elde edilen enerji ayn\u0131 zamanda s\u00fcrd\u00fcr\u00fclebilir \u00f6zellik ta\u015f\u0131yor. Yap\u0131lan analizler g\u00fcne\u015f enerjisine yap\u0131lan yat\u0131r\u0131m\u0131n tar\u0131mdan daha k\u00e2rl\u0131 oldu\u011funu g\u00f6steriyor. 20 d\u00f6n\u00fcml\u00fck bir arazide 1 megavatl\u0131k g\u00fcne\u015f enerjisi \u00fcretildi\u011finde yat\u0131r\u0131mc\u0131n\u0131n cebine bir y\u0131l sonra maliyet pay\u0131 \u00e7\u0131kar\u0131ld\u0131\u011f\u0131nda net 334 bin TL kal\u0131yor. Ayn\u0131 alanda 1 y\u0131lda 12 bin kilogram bu\u011fday \u00fcreten bir \u00e7ift\u00e7i ise, \u00fcr\u00fcn\u00fcn\u00fc devlete kilogram ba\u015f\u0131na 720 kuru\u015ftan satarak net 4 bin 320 TL kazan\u0131yor.<\/p>\n<p><strong>Karaman`\u0131n g\u00fcne\u015fi \u00f6nde<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerjisi-sektoru-gunes-yatirimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10742\" title=\"gunes-enerjisi-sektoru-gunes-yatirimi-ges\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerjisi-sektoru-gunes-yatirimi-300x181.jpg\" alt=\"\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerjisi-sektoru-gunes-yatirimi-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerjisi-sektoru-gunes-yatirimi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/gunes-enerjisi-sektoru-gunes-yatirimi.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>G\u00fcne\u015f enerji santrali (GES) kurulumu i\u00e7in en uygun olan b\u00f6lgelerin T\u00fcrkiye`nin orta hatt\u0131n\u0131n alt\u0131nda kalan alanlar oldu\u011fu belirtiliyor. G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED) Ba\u015fkan Yard\u0131mc\u0131s\u0131 Hakan Erkan, g\u00fcne\u015f \u00f6l\u00e7\u00fcmlerinin \u00f6zellikle Konya, Karaman, Kahramanmara\u015f ve Harran b\u00f6lgelerinde yo\u011funla\u015ft\u0131\u011f\u0131na dikkat \u00e7ekti. Erkan, bu y\u0131l\u0131n `g\u00fcne\u015f y\u0131l\u0131` olaca\u011f\u0131n\u0131 belirterek, &#8220;Yat\u0131r\u0131mlar artacak. T\u00fcrkiye`nin<strong> iklim \u015fartlar\u0131 g\u00fcne\u015f enerjisi<\/strong> i\u00e7in \u00e7ok uygun. G\u00fcne\u015f enerjisinden y\u0131lda 380 milyar kWh elektrik \u00fcretebilecek potansiyele sahibiz&#8221; dedi.<\/p>\n<p><strong>\u0130kinci etap 1000 megawatla a\u00e7\u0131lacak<\/strong><\/p>\n<p>EPDK, halen devam eden lisans ba\u015fvurular\u0131nda ilk etapta 600 megavatl\u0131k izin verecek. Ancak bunun bir ba\u015flang\u0131\u00e7 oldu\u011funu s\u00f6yleyen Erkan, ikinci etab\u0131n 6 ay sonra 1000 megavatla a\u00e7\u0131laca\u011f\u0131n\u0131 tahmin ettiklerini a\u00e7\u0131klad\u0131.<\/p>\n<p><strong>G\u00fcne\u015f paneli yan sanayisi do\u011fdu<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisindeki yat\u0131r\u0131m potansiyeli yan sanayideki yat\u0131r\u0131mc\u0131lar\u0131 da harekete ge\u00e7irdi. GES kurulumu i\u00e7in en \u00f6nemli kalemlerden biri olan g\u00fcne\u015f paneli \u00fcretiminde art\u0131\u015f ba\u015flad\u0131. Gaziantep`te bu alana yat\u0131r\u0131m yapan Solarturk Enerji`nin Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Osman \u00d6zberk, \u00fcretime k\u0131sa zaman \u00f6nce ba\u015flamalar\u0131na ra\u011fmen T\u00fcrkiye`deki yat\u0131r\u0131mc\u0131lardan ciddi talep ald\u0131klar\u0131n\u0131 s\u00f6yledi. T\u00fcrkiye`de 15 ay \u00f6nce ofis a\u00e7an \u00c7in`in en b\u00fcy\u00fck g\u00fcne\u015f paneli \u00fcreticisi Yingli Solar da pazarda hedef b\u00fcy\u00fctt\u00fc. Firman\u0131n genel m\u00fcd\u00fcr\u00fc U\u011fur K\u0131l\u0131\u00e7, son 3 ayd\u0131r taleplerin artt\u0131\u011f\u0131n\u0131 s\u00f6yleyerek, lisans ba\u015fvurusu yapan firmalar\u0131n kendileriyle ileti\u015fime ge\u00e7ti\u011fini a\u00e7\u0131klad\u0131.<\/p>\n<p><strong>GES kurman\u0131n maliyeti 1.5 milyon dolar<\/strong><\/p>\n<p>Kamunun g\u00fcne\u015f enerjisi al\u0131m fiyat\u0131, halen y\u00fcr\u00fcrl\u00fckte olan Yenilenebilir Enerji Kanunu (YEK) uyar\u0131nca 13 dolar sent. Ancak y\u00fcksek g\u00fcne\u015f alma seviyesi yat\u0131r\u0131m\u0131n geri d\u00f6n\u00fc\u015f s\u00fcresini k\u0131salt\u0131yor ve yat\u0131r\u0131mlar\u0131 fizib\u0131l k\u0131l\u0131yor. Hakan Erkan, 1 megavatl\u0131k GES kurman\u0131n maliyetinin 1.5 milyon dolar oldu\u011funu a\u00e7\u0131klad\u0131. GES kurulumu, di\u011fer ye\u015fil enerji kaynaklar\u0131na g\u00f6re daha pahal\u0131 olmas\u0131na ra\u011fmen, son y\u0131llarda d\u00fcnyada panel fiyatlar\u0131 arz fazlas\u0131 nedeniyle ucuzlad\u0131.<\/p>\n<p><strong>ALIM GARANT\u0130S\u0130 13.3 DOLAR\/SENT<\/strong><br \/>\nKamu al\u0131m garantisi: 13.3 dolar\/sent<br \/>\nYerli yat\u0131r\u0131m olursa al\u0131m garantisi: 19.5 dolar\/sent<br \/>\nAl\u0131m garanti s\u00fcresi: 10 y\u0131l<br \/>\nYat\u0131r\u0131m\u0131n geri d\u00f6n\u00fc\u015f s\u00fcresi: 7-10 y\u0131l<br \/>\nEn fazla g\u00fcne\u015f alan b\u00f6lgeler: G. Anadolu ve Akdeniz<br \/>\nGES kurmaya elveri\u015fli alan: 4 bin 600 km2<br \/>\nY\u0131ll\u0131k ortalama g\u00fcne\u015flenme s\u00fcresi: 2.640 saat<br \/>\nY\u0131ll\u0131k elektrik \u00fcretme potansiyeli: 380 milyar kWh<\/p>\n<p><strong>G\u00fcne\u015f geliri Tar\u0131m`\u0131n 77 kat\u0131<\/strong><\/p>\n<table width=\"369\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" nowrap=\"nowrap\" width=\"111\"><\/td>\n<td style=\"text-align: center;\" nowrap=\"nowrap\" width=\"129\"><strong>G\u00fcne\u015f Ekersek<\/strong><\/td>\n<td style=\"text-align: center;\" nowrap=\"nowrap\" width=\"129\"><strong>Bu\u011fday Ekersek<\/strong><\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">Alan<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">20 D\u00f6n\u00fcm<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">20 D\u00f6n\u00fcm<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">S\u00fcre<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">1 Y\u0131l<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">1 Y\u0131l<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">Kapasite<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">1 megavat<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">12 bin kilogram<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">Br\u00fct Kazan\u00e7<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">418 bin TL<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">8 bin 640 TL<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">Maliyet Pay\u0131<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">20%<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">50%<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\" width=\"111\">Net kazan\u00e7<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">334 bin TL<\/p>\n<\/td>\n<td nowrap=\"nowrap\" width=\"129\">\n<p align=\"center\">4 bin 320 TL<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/gunes-eken-77-kat-fazla-kazaniyor_3909.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye`nin tah\u0131l ambar\u0131 Konya ve Karaman`daki bu\u011fday tarlalar\u0131, daha k\u00e2rl\u0131 oldu\u011fu i\u00e7in g\u00fcne\u015f enerjisi panelleriyle kaplan\u0131yor. Tarlas\u0131na g\u00fcne\u015f eken bu\u011fday ekenden 77 kat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10742,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,165,727,2326,227,13,2569,5973,108,2576,5970,5971,1679,2441,5969,105,5972],"views":12156,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11906"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=11906"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11906\/revisions"}],"predecessor-version":[{"id":11908,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11906\/revisions\/11908"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10742"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=11906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=11906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=11906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}