{"id":1190,"date":"2012-08-02T08:53:41","date_gmt":"2012-08-02T05:53:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=1190"},"modified":"2012-08-02T08:53:41","modified_gmt":"2012-08-02T05:53:41","slug":"kirgizistanin-enerji-altyapisini-cin-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirgizistanin-enerji-altyapisini-cin-kuruyor\/","title":{"rendered":"(Turkish) K\u0131rg\u0131zistan&#8217;\u0131n Enerji Altyap\u0131s\u0131n\u0131 \u00c7in Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/1190\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yakla\u015f\u0131k 390 milyon dolara mal olacak 500 megavat kapasiteli Kemin elektrik \u00fcretim ve da\u011f\u0131t\u0131m merkezinin temeli t\u00f6renle at\u0131ld\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-1191\" title=\"enerji-altyapisi-k\u0131rg\u0131zistan\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/08\/enerji-altyapisi-k\u0131rg\u0131zistan-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/08\/enerji-altyapisi-k\u0131rg\u0131zistan-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/08\/enerji-altyapisi-k\u0131rg\u0131zistan-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/08\/enerji-altyapisi-k\u0131rg\u0131zistan.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>K\u0131rg\u0131zistan&#8217;\u0131n kuzeyindeki \u00c7uy eyaletine ba\u011fl\u0131 Kemin il\u00e7esinde, \u00c7in&#8217;in Tebian Electric Apparatus Stock Co. Ltd.(TBEA) \u015firketinin yap\u0131m\u0131n\u0131 \u00fcstlendi\u011fi ve yakla\u015f\u0131k 390 milyon dolara mal olacak 500 megavat kapasiteli Kemin elektrik \u00fcretim ve da\u011f\u0131t\u0131m merkezinin temeli t\u00f6renle at\u0131ld\u0131.<\/p>\n<p>Temel atma t\u00f6reninde konu\u015fan Cumhurba\u015fkan\u0131 Almazbek Atambayev, \u00f6n\u00fcm\u00fczdeki y\u0131llarda enerji altyap\u0131s\u0131n\u0131n milli ekonominin lokomotifi olaca\u011f\u0131n\u0131 belirterek, \u00fclkenin kuzey ve g\u00fcneyini birbirine enerji hatlar\u0131yla ba\u011flayacak projenin yap\u0131m\u0131n\u0131 \u00fcstlenen \u00c7in h\u00fck\u00fcmeti ve TBEA \u015firketine te\u015fekk\u00fcr etti.<\/p>\n<p>Atambayev, &#8220;Bu bizim i\u00e7in b\u00fcy\u00fck bir geli\u015fme. G\u00fcney ve kuzeyimizi birle\u015ftiriyoruz. Bu t\u00fcr projeler K\u0131rg\u0131zistan&#8217;da milliyet\u00e7ilik, \u0131rk\u00e7\u0131l\u0131k ve b\u00f6lgesel ayr\u0131mc\u0131l\u0131k yapanlara b\u00fcy\u00fck bir ders olacakt\u0131r&#8221; diye konu\u015ftu.<\/p>\n<p>\u00dclkenin g\u00fcneyindeki Celalabad Eyaleti&#8217;ne ba\u011fl\u0131 Bazar-Korgon eyaletinde de, Datka adl\u0131 elektrik \u00fcretim ve da\u011f\u0131t\u0131m merkezinin temeli ge\u00e7en y\u0131l at\u0131lm\u0131\u015ft\u0131.<\/p>\n<p>Datka ve Kemin elektrik \u00fcretim ve da\u011f\u0131t\u0131m merkezleri in\u015faatlar\u0131n\u0131 \u00fcstlenen \u00c7in \u015firketi TBEA, buralarada \u00fcretilen elektri\u011fin \u00fclke i\u00e7inde da\u011f\u0131t\u0131m\u0131n\u0131 da ger\u00e7ekle\u015ftirecek.<\/p>\n<p>K\u0131rg\u0131zistan mevcut durumda, Sovyetler Birli\u011fi&#8217;nden kalan altyap\u0131y\u0131 kullanarak, kom\u015fu \u00fclkeler \u00d6zbekistan ve Kazakistan \u00fczerinden elekrik temin ediyor ve bunun i\u00e7in y\u00fckl\u00fc miktarlarda transfer \u00fccreti \u00f6d\u00fcyor.<\/p>\n<p>K\u0131rg\u0131zistan y\u00f6netimi ulusal elektrik \u00fcretimi i\u00e7in ad\u0131mlar atarken, \u00d6zbekistan ve Kazakistan da eski elektrik \u015febekesini terk edecekleri y\u00f6n\u00fcnde sinyaller veriyor. Ancak bu \u00fclkelerin ani bir kararla eski sistemi terk etmeleri halinde karanl\u0131kta kalmaktan korkan K\u0131rg\u0131z y\u00f6netimi, s\u00f6z konusu karar\u0131n ertelenmesi i\u00e7in yo\u011fun bir diplomasi y\u00fcr\u00fct\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.sabah.com.tr\/Ekonomi\/2012\/08\/01\/kirgizistanin-enerji-altyapisini-cin-kuruyor\" target=\"_blank\">Sabah<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yakla\u015f\u0131k 390 milyon dolara mal olacak 500 megavat kapasiteli Kemin elektrik \u00fcretim ve da\u011f\u0131t\u0131m merkezinin temeli t\u00f6renle at\u0131ld\u0131. K\u0131rg\u0131zistan&#8217;\u0131n kuzeyindeki \u00c7uy eyaletine ba\u011fl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1191,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[61,19,213,212],"views":837,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1190"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=1190"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1190\/revisions"}],"predecessor-version":[{"id":1193,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1190\/revisions\/1193"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/1191"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=1190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=1190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=1190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}