{"id":118892,"date":"2020-08-20T12:13:51","date_gmt":"2020-08-20T09:13:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118892"},"modified":"2020-08-20T12:13:51","modified_gmt":"2020-08-20T09:13:51","slug":"ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki\/","title":{"rendered":"(Turkish) &#8217;Il\u0131su Baraj\u0131 ve HES&#8217;inden T\u00fcrkiye Ekonomisine 3 Ayda 375 Milyon Lira Katk\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118892\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Devlet Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Dicle Nehri \u00fczerindeki baraj ve HES&#8217;in ilk t\u00fcrbininin 19 May\u0131s 2020&#8217;de devreye al\u0131nd\u0131\u011f\u0131 belirtilirken Baraj\u0131n kurulu g\u00fcc\u00fcn\u00fcn 1200 megavat oldu\u011fu, bu yat\u0131r\u0131mla y\u0131ll\u0131k ortalama 4 milyar 120 milyon kilovatsaat enerji \u00fcretilece\u011fi belirtildi.<\/h1>\n<p>A\u00e7\u0131klamada, <strong>Il\u0131su&#8217;nun Atat\u00fcrk Baraj\u0131<\/strong>&#8216;ndan sonra \u00fclkenin <strong>2&#8217;inci b\u00fcy\u00fck baraj\u0131<\/strong> oldu\u011fu, baraj\u0131n<strong> &#8220;\u00f6n y\u00fcz\u00fc beton kapl\u0131 kaya dolgu baraj&#8221; tipi<\/strong>nde <strong>dolgu hacmi bak\u0131m\u0131ndan<\/strong> d\u00fcnyada 1&#8217;inci s\u0131rada yerini al\u0131rken DS\u0130 Genel M\u00fcd\u00fcr\u00fc <strong>Kaya Y\u0131ld\u0131z,<\/strong> <strong>Il\u0131su Baraj\u0131<\/strong>&#8216;nda \u015fimdiye kadar <strong>toplam 3 \u00fcnite<\/strong>nin devreye al\u0131nd\u0131\u011f\u0131n\u0131 ve bu \u00fcnitelerin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131larak <strong>Elektrik \u00dcretim A\u015e<\/strong>&#8216;ye devredildi\u011fini <img loading=\"lazy\" class=\"alignright wp-image-118894\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki.jpg 777w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/ilisu-baraji-ve-hesinden-turkiye-ekonomisine-3-ayda-375-milyon-lira-katki-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>a\u00e7\u0131klad\u0131.<\/p>\n<p>Barajda <strong>3 ay<\/strong> i\u00e7inde <strong>750 milyon kilovatsaat<\/strong> enerji \u00fcretimi ger\u00e7ekle\u015ftirilerek <strong>T\u00fcrkiye ekonomisi<\/strong>ne yakla\u015f\u0131k <strong>375 milyon lira katk\u0131<\/strong> sa\u011fland\u0131\u011f\u0131 bilgisini veren Y\u0131ld\u0131z, &#8220;Geriye kalan <strong>di\u011fer 3 \u00fcnitede<\/strong> ise test \u00e7al\u0131\u015fmalar\u0131 s\u00fcr\u00fcyor. Bu y\u0131l, baraj\u0131n t\u00fcm \u00fcnitelerinin devreye al\u0131nmas\u0131 planlan\u0131rken <strong>Il\u0131su Baraj\u0131<\/strong>, tamamland\u0131\u011f\u0131nda \u00fclke ekonomisine y\u0131lda <strong>2,8 milyar lira katk\u0131<\/strong> sa\u011flayacak\u201d dedi.<\/p>\n<p><strong>Il\u0131su Baraj\u0131<\/strong> ve<strong> HES<\/strong>&#8216;i ile \u00fcretilecek\u00a0<strong>ye\u015fil enerjiyle<\/strong> daha<strong> temiz ve ya\u015fanabilir bir gelece\u011fe<\/strong> de katk\u0131 sa\u011flamas\u0131 bekleniyor. <strong>Il\u0131su Baraj\u0131<\/strong>&#8216;nda reg\u00fcle edilen ve daha sonra yap\u0131lmas\u0131 hedeflenen <strong>Cizre Baraj\u0131&#8217;na<\/strong> b\u0131rak\u0131lan sularla,<strong> Nusaybin, Cizre, \u0130dil <\/strong>ve<strong> Silopi<\/strong> ovalar\u0131nda toplam <strong>765 bin dekar alan<\/strong> modern tekniklerle sulanacak ve y\u0131lda <strong>1 milyar 168 milyon kilovatsaat<\/strong> enerji \u00fcretilebilecek. Cizre Baraj\u0131 tamamland\u0131\u011f\u0131nda y\u0131ll\u0131k<strong> 1 milyar liral\u0131k<\/strong> ilave gelir art\u0131\u015f\u0131 da sa\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Devlet Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Dicle Nehri \u00fczerindeki baraj ve HES&#8217;in ilk t\u00fcrbininin 19 May\u0131s 2020&#8217;de devreye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118894,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[57394,77819,5070,52259,26044,76563,77817,4278,76562,77818,54979,2364,3769],"views":124,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118892"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118892"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118892\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118894"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}