{"id":118866,"date":"2020-08-19T18:20:12","date_gmt":"2020-08-19T15:20:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118866"},"modified":"2020-08-19T18:20:12","modified_gmt":"2020-08-19T15:20:12","slug":"tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak\/","title":{"rendered":"(Turkish) &#8217;TsKBM A.\u015e.&#8217;nin Akkuyu NGS G\u00fc\u00e7 \u00dcnitelerinde Pompa Ekipman\u0131 Yer Alacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118866\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rosatom makine m\u00fchendisli\u011fi \u015firketler grubuna ba\u011fl\u0131, Atomenergomash\u2019\u0131n yap\u0131sal brimlerinden biri olan Tsentralnoe Konstruktorskoe Byuro Mashinostroeniya A.\u015e., in\u015faat\u0131 devam eden Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin 4 g\u00fc\u00e7 \u00fcnitesi i\u00e7in pompa ekipman\u0131 tedari\u011fini \u00f6ng\u00f6ren s\u00f6zle\u015fmeleri imzalad\u0131. TsKBM taraf\u0131ndan imzalanan s\u00f6zle\u015fmeler kapsam\u0131nda, Akkuyu NGS i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-118868\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak-1.jpg\" alt=\"\" width=\"320\" height=\"480\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak-1.jpg 325w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak-1-200x300.jpg 200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak-1-266x400.jpg 266w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tskbm-a-s-nin-akkuyu-ngs-guc-unitelerinde-pompa-ekipmani-yer-alacak-1-33x50.jpg 33w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>16 diyagonal ve 16 dikey santrif\u00fcj pompas\u0131 tasarlanacak ve \u00fcretilecek.<\/h1>\n<p><strong>Santrif\u00fcjl\u00fc diyagonal pompa \u00fcniteleri<\/strong>, t\u00fcrbin kondansat\u00f6rlerine so\u011futma suyu temin edilmesi i\u00e7in tasarlan\u0131yor. <strong>Dikey santrif\u00fcj pompalar\u0131<\/strong>, g\u00fc\u00e7 \u00fcnitesinin t\u00fcm \u00e7al\u0131\u015fma modlar\u0131nda deniz suyunu iletme g\u00f6revini \u00fcstleniyor. Pompalar, <strong>NGS g\u00fcvenli\u011fi<\/strong>nden sorumlu sistemlerin kesintisiz \u015fekilde \u00e7al\u0131\u015fmalar\u0131n\u0131, <strong>so\u011futma suyu<\/strong>nun zaman\u0131nda temin edilmesini ve <strong>\u0131s\u0131n\u0131n tahliye edilmesi<\/strong>ni sa\u011fl\u0131yor. Bu kapsamda, her bir <strong>NGS g\u00fc\u00e7 \u00fcnitesi<\/strong> i\u00e7in d\u00f6rt diyagonal ve d\u00f6rt dikey pompa temin edilecek.<\/p>\n<p>Ayn\u0131 zamanda <strong>Akkuyu NGS<\/strong>\u2019nin ana boru ekipman\u0131 tedarik\u00e7isi olan <strong>TsKBM<\/strong>, <strong>Ocak 2018<\/strong>\u2019de <strong>T\u00fcrkiye Atom Enerjisi Kurumu\u2019nun (TAEK)<\/strong> denetiminden ba\u015far\u0131yla ge\u00e7ip, \u00fcretici sertifikas\u0131n\u0131 ald\u0131. <strong>TsKBM<\/strong>, <strong>Akkuyu NGS 1 No\u2019lu<\/strong> g\u00fc\u00e7 \u00fcnitesi i\u00e7in ana sirk\u00fclasyon pompalar\u0131 olan <strong>GTsNA-1753<\/strong>\u2019leri, t\u00fcrbin binas\u0131 i\u00e7in ise ana ve yard\u0131mc\u0131 besleme pompalar\u0131n\u0131 tedarik edecek.<\/p>\n<p>1945 y\u0131l\u0131nda kurulan <strong>Tsentralnoe Konstruktorskoe Byuro Mashinostroeniya A.\u015e.,<\/strong> Rosatom Devlet Kurulu\u015fu\u2019nun \u00f6nde gelen i\u015ftiraklerinden biri. \u00c7ok prestijli bir tasar\u0131m ekibine, kendi ara\u015ft\u0131rma, deney ve \u00fcretim tesislerine sahip olan TsKBM, <strong>bas\u0131n\u00e7l\u0131 su reakt\u00f6rlerinde (VVER)<\/strong> kullan\u0131lan ana <strong>sirk\u00fclasyon pompalar\u0131n\u0131n (GTsN)<\/strong> tek <strong>Rus geli\u015ftiricisi<\/strong> ve \u00fcreticisi olma \u00f6zelli\u011fini ta\u015f\u0131yor. Bununla birlikte \u015firket, <strong>n\u00fckleer santraller<\/strong> i\u00e7in <strong>s\u0131zd\u0131rmaz pompalar, konsol pompa, besleme, acil durum pompalar\u0131<\/strong> ile <strong>radyoaktif maddelerle \u00e7al\u0131\u015fmaya<\/strong> y\u00f6nelik \u00e7e\u015fitli <strong>uzaktan kontrol<\/strong> edilebilir <strong>ekipman\u0131n tasar\u0131m\u0131<\/strong>n\u0131 ve <strong>\u00fcretimini<\/strong> de yap\u0131yor.<\/p>\n<p>TsKBM A.\u015e.\u2019nin geli\u015fim stratejisi, <strong>Rus<\/strong> ve <strong>uluslararas\u0131 n\u00fckleer enerji pazarlar\u0131<\/strong>nda sat\u0131\u015f hacminin art\u0131r\u0131lmas\u0131n\u0131, Rosatom Devlet Kurulu\u015fu\u2019nun stratejik hedeflerine uygun olarak yenilik\u00e7i ekipmanlar\u0131n geli\u015ftirilmesini ve yan sekt\u00f6rlerde kendi teknolojilerini kullanarak \u00fcr\u00fcnlerin \u00e7e\u015fitlendirilmesini \u00f6ng\u00f6r\u00fcyor. <strong>TsKBM<\/strong> g\u00fcn\u00fcm\u00fczde, <strong>termik enerji, gaz ve petrokimya<\/strong> (LNG teknolojileri), gemi in\u015faat\u0131 (s\u0131\u011f \u00e7eki\u015fli ve 10510 \u201cLider\u201d projesinin buzk\u0131ran gemileri) alan\u0131nda ve <strong>at\u0131k i\u015fleme tesisleri<\/strong>nin ekipmanlar\u0131na y\u00f6nelik teknik \u00e7\u00f6z\u00fcmler sunuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rosatom makine m\u00fchendisli\u011fi \u015firketler grubuna ba\u011fl\u0131, Atomenergomash\u2019\u0131n yap\u0131sal brimlerinden biri olan Tsentralnoe Konstruktorskoe Byuro Mashinostroeniya A.\u015e., in\u015faat\u0131 devam eden Akkuyu N\u00fckleer G\u00fc\u00e7 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118869,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,42302,46136,5070,52259,77808,53348,77806,2587,77804,77805,77807],"views":194,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118866"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118866"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118869"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}