{"id":118753,"date":"2020-08-17T15:29:08","date_gmt":"2020-08-17T12:29:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118753"},"modified":"2020-08-17T15:29:37","modified_gmt":"2020-08-17T12:29:37","slug":"tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor\/","title":{"rendered":"(Turkish) &#8217;Tuzla Belediyesi&#8217; \u015eelale Park&#8217;a, G\u00fcne\u015f Santrali Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118753\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Tuzla Belediyesi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, 4 bin 200 metrekarelik <img loading=\"lazy\" class=\"alignright wp-image-118755\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor.jpg\" alt=\"\" width=\"320\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor.jpg 1075w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor-768x482.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor-1024x643.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor-500x314.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tuzla-belediyesi-selale-parka-gunes-santrali-kuruyor-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>alanda 1386 g\u00fcne\u015f panelinden meydana gelen santralde, 367 kilovatl\u0131k elektrik enerjisi \u00fcretimi ger\u00e7ekle\u015fiyor.<\/strong><\/h1>\n<p><strong>3 y\u0131l<\/strong> i\u00e7inde <strong>yat\u0131r\u0131m bedelini kar\u015f\u0131layacak<\/strong> olan <strong>g\u00fcne\u015f enerji santrali<\/strong>nin, ayn\u0131 zamanda <strong>\u0130stanbul<\/strong>\u2019un kamu alan\u0131ndaki en b\u00fcy\u00fck <strong>G\u00fcne\u015f Enerji Santrali (GES) yat\u0131r\u0131m\u0131<\/strong> unvan\u0131n\u0131 ta\u015f\u0131d\u0131\u011f\u0131 da a\u00e7\u0131kland\u0131.<\/p>\n<p>Santral ile 274 ton <strong>karbondioksit sal\u0131m\u0131n\u0131 engellemenin<\/strong>\u00a0yan\u0131 s\u0131ra her y\u0131l <strong>25 bin a\u011fac\u0131n<\/strong> da yok olup gitmesinin \u00f6n\u00fcne ge\u00e7ilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tuzla Belediyesi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, 4 bin 200 metrekarelik alanda 1386 g\u00fcne\u015f panelinden meydana gelen santralde, 367 kilovatl\u0131k elektrik enerjisi \u00fcretimi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118755,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,53157,7858,60397,77732],"views":173,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118753"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118753"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118753\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118755"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}