{"id":11851,"date":"2013-06-13T10:57:07","date_gmt":"2013-06-13T07:57:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=11851"},"modified":"2013-06-13T11:00:31","modified_gmt":"2013-06-13T08:00:31","slug":"guney-akim-boru-hatti-icin-ced-sureci-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guney-akim-boru-hatti-icin-ced-sureci-basladi\/","title":{"rendered":"(Turkish) G\u00fcney Ak\u0131m Boru Hatt\u0131 \u0130\u00e7in \u00c7ED S\u00fcreci Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/11851\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rus do\u011falgaz\u0131n\u0131 Karadeniz\u2019in alt\u0131ndan ge\u00e7erek Avrupa\u2019ya ta\u015f\u0131yacak G\u00fcney Ak\u0131m Projesi\u2019nin T\u00fcrkiye\u2019nin m\u00fcnhas\u0131r ekonomik b\u00f6lgesiyle ilgili k\u0131sm\u0131 i\u00e7in \u00c7ED Ba\u015fvurusu uygun bulundu, s\u00fcre\u00e7 ba\u015fl\u0131yor.\u00a0<\/strong><\/p>\n<p>Rus South Stream Transport BV, G\u00fcney Ak\u0131m A\u00e7\u0131k Deniz Boru Hatt\u0131 Projesi\u2019nin T\u00fcrkiye b\u00f6l\u00fcm\u00fc i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunu yapt\u0131. Ba\u015fvurunun, \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 \u00c7ED Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn uygun bulmas\u0131 ile proje i\u00e7in \u00c7ED s\u00fcreci ba\u015flam\u0131\u015f oldu.<\/p>\n<p>Rus \u015firketin en b\u00fcy\u00fck hissesi <strong>y\u00fczde 50<\/strong> ile Rus \u015firketi <strong>OAO Gazprom\u2019a<\/strong> ait. Proje\u2019nin di\u011fer ortaklar\u0131, <strong>y\u00fczde 20<\/strong> ile \u0130talyan \u015firketi <strong>Eni S.p.A.<\/strong> ve y\u00fczde <strong>15\u2019er hisse<\/strong> ile <strong>Frans\u0131z enerji \u015firketi EDF<\/strong> ve Alman \u015firketi <strong>Wintershall Holding<\/strong> GmbH (BASF Group).<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Guney-Akim-SouthStream-HI-431419.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-11852\" title=\"Guney-Akim-SouthStream--HI-431419\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Guney-Akim-SouthStream-HI-431419.jpg\" alt=\"\" width=\"299\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Guney-Akim-SouthStream-HI-431419.jpg 299w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/Guney-Akim-SouthStream-HI-431419-80x45.jpg 80w\" sizes=\"(max-width: 299px) 100vw, 299px\" \/><\/a>ELC Group A.\u015e. taraf\u0131ndan haz\u0131rlanan <strong>\u00c7ED ba\u015fvurusu<\/strong> dosyas\u0131na g\u00f6re, projenin yakla\u015f\u0131k maliyeti 56 milyar 420 milyon Dolar oldu. \u00c7ED Ba\u015fvuru dosyas\u0131na g\u00f6re projenin \u00f6zellikleri \u015f\u00f6yle:<\/p>\n<p>G\u00fcney Ak\u0131m Projesi tamamland\u0131\u011f\u0131nda toplam uzunlu\u011fu 2 bin 300 kilometreden fazla olacak. Karadeniz boyunca yakla\u015f\u0131k 930 km devam eden, birbirine paralel ve 813 mm (32 in\u00e7) \u00e7ap\u0131nda d\u00f6rt adet boru hatt\u0131ndan olu\u015fan Hat, Karadeniz`in Rusya k\u0131y\u0131s\u0131ndaki Anapa \u015fehri yak\u0131nlar\u0131ndan ba\u015flay\u0131p, T\u00fcrkiye M\u00fcnhas\u0131r Ekonomik B\u00f6lgesi\u2019nden de ge\u00e7erek, Bulgaristan k\u0131y\u0131s\u0131ndaki Varna \u015fehri yak\u0131nlar\u0131nda k\u0131y\u0131ya \u00e7\u0131kacak.<\/p>\n<p><strong><em>\u0130\u015eTE G\u00dcNEY AKIM\u2019IN TEKN\u0130K VE KAPAS\u0130TE \u00d6ZELL\u0130KLER\u0130<\/em><\/strong><br \/>\n&#8211; Do\u011fuda Rusya s\u0131n\u0131r\u0131ndan bat\u0131da Bulgaristan s\u0131n\u0131r\u0131na dek, T\u00fcrkiye M\u00fcnhas\u0131r Ekonomik B\u00f6lgesi i\u00e7inde yer alan T\u00fcrkiye b\u00f6l\u00fcm\u00fcn\u00fcn uzunlu\u011fu yakla\u015f\u0131k 470 km.<\/p>\n<p>&#8211; Boru hatt\u0131 en y\u00fcksek kapasiteyle \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda, y\u0131lda 63 bcm do\u011fal gaz ta\u015f\u0131yabilecek.<\/p>\n<p>&#8211; D\u00f6rt adet boru hatt\u0131ndan her birinin en y\u00fcksek ak\u0131\u015f h\u0131z\u0131 yakla\u015f\u0131k olarak y\u0131lda 15,75 bcm ve en y\u00fcksek tasar\u0131m bas\u0131nc\u0131 da 300 bar seviyelerinde olacak<\/p>\n<p>&#8211; Projenin in\u015faat a\u015famas\u0131 2015 y\u0131l\u0131 sonunda, i\u015fletme s\u00fcresi 2065 y\u0131l\u0131nda tamamlanacak.<\/p>\n<p>&#8211; T\u00fcrkiye\u2019de borular\u0131n d\u00f6\u015fenece\u011fi deniz taban\u0131 derinli\u011fi yakla\u015f\u0131k 2.021 m \u2013 2.199 m aras\u0131nda de\u011fi\u015fkenlik g\u00f6steriyor. Boru par\u00e7alar\u0131 i\u00e7eriden ve d\u0131\u015far\u0131dan kaplanacak. \u0130\u00e7 kaplama, i\u00e7 temizli\u011fi ve operasyonel gaz ak\u0131\u015f h\u0131z\u0131n\u0131 art\u0131ran bir epoksi boyayla, d\u0131\u015f kaplama ise, boru hatlar\u0131n\u0131 korozyona kar\u015f\u0131 korumak i\u00e7in \u00fc\u00e7 katmanl\u0131 polipropilenle (3LPP) yap\u0131lacak<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/guney-akim-boru-hatti-icin-ced-sureci-basladi_3890.html#.Ubl6vefwlsk\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rus do\u011falgaz\u0131n\u0131 Karadeniz\u2019in alt\u0131ndan ge\u00e7erek Avrupa\u2019ya ta\u015f\u0131yacak G\u00fcney Ak\u0131m Projesi\u2019nin T\u00fcrkiye\u2019nin m\u00fcnhas\u0131r ekonomik b\u00f6lgesiyle ilgili k\u0131sm\u0131 i\u00e7in \u00c7ED Ba\u015fvurusu uygun bulundu, s\u00fcre\u00e7 ba\u015fl\u0131yor.\u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5929,4402,5927,4275,92,226,63,67,5926,1278,2007,1772,5928,885],"views":788,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11851"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=11851"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11851\/revisions"}],"predecessor-version":[{"id":11855,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11851\/revisions\/11855"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/11852"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=11851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=11851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=11851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}