{"id":118456,"date":"2020-08-11T12:28:05","date_gmt":"2020-08-11T09:28:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118456"},"modified":"2020-08-11T12:28:05","modified_gmt":"2020-08-11T09:28:05","slug":"yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi\/","title":{"rendered":"(Turkish) Yusufeli Baraj\u0131&#8217;n\u0131n Tamamlanmas\u0131na Son 50 Metre Kald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118456\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Devlet Su \u0130\u015fleri\u00a0(DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, T\u00fcrkiye&#8217;nin vizyon projelerinden\u00a0Yusufeli Baraj\u0131, yap\u0131m\u0131 tamamland\u0131\u011f\u0131nda 275 metre y\u00fcksekli\u011fiyle \u00e7ift e\u011frilikli beton kemer kategorisinde T\u00fcrkiye&#8217;nin en y\u00fcksek ve d\u00fcnyan\u0131n 3&#8217;\u00fcnc\u00fc y\u00fcksek baraj\u0131 olacak.<\/h1>\n<p>\u0130n\u015faat \u00e7al\u0131\u015fmalar\u0131 yo\u011fun \u015fekilde devam eden baraj\u0131n kurulu g\u00fcc\u00fc 558 megavat\u0131 ve y\u0131ll\u0131k enerji \u00fcretimi <strong>1 milyar 888 milyon kilovat<\/strong> saati bulacak.<\/p>\n<p><strong>Santral binas\u0131<\/strong> ve <strong>enerji yap\u0131lar\u0131nda<\/strong> betonlama \u00e7al\u0131\u015fmalar\u0131 planlad\u0131\u011f\u0131 \u015fekilde devam eden <strong>Yusufeli Baraj\u0131&#8217;n\u0131n<\/strong> tamamlanmas\u0131yla milli b\u00fct\u00e7eye y\u0131ll\u0131k <strong>1 milyar 500 milyon lira<\/strong> katk\u0131 sa\u011flanacak. Proje <img loading=\"lazy\" class=\"alignright wp-image-118458\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi.jpg 731w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/yusufeli-barajinin-tamamlanmasina-son-50-metre-kaldi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sayesinde yakla\u015f\u0131k<strong> 2,5 milyon n\u00fcfuslu<\/strong> bir \u015fehrin y\u0131ll\u0131k enerji ihtiyac\u0131 kar\u015f\u0131lanacak.<\/p>\n<h2><strong>&#8220;Eyfel Kulesi&#8217;nden 25 Metre K\u0131sa&#8221;<\/strong><\/h2>\n<p>A\u00e7\u0131klamada g\u00f6r\u00fc\u015flerine yer verilen DS\u0130 Genel M\u00fcd\u00fcr\u00fc <strong>Kaya Y\u0131ld\u0131z<\/strong> da &#8220;Yusufeli Baraj\u0131&#8217;na <strong>3 milyon 400 bin metrek\u00fcp<\/strong> beton d\u00f6k\u00fclerek, g\u00f6vde betonunda <strong>% 85<\/strong> ger\u00e7ekle\u015fme sa\u011fland\u0131. Baraj\u0131m\u0131z<strong> 225 metre<\/strong> y\u00fcksekli\u011fe ula\u015fm\u0131\u015f olup <strong>son 50 metre<\/strong> kald\u0131. Yusufeli Baraj\u0131, <strong>275 metre<\/strong> g\u00f6vde y\u00fcksekli\u011fiyle Eyfel Kulesi&#8217;nden <strong>25 metre<\/strong> k\u0131sad\u0131r. Baraj\u0131n g\u00f6vdesi <strong>100 katl\u0131<\/strong> bir g\u00f6kdelen y\u00fcksekli\u011findedir.&#8221; ifadelerini kulland\u0131.<\/p>\n<p>\u0130n\u015faatta g\u00fcnl\u00fck maksimum <strong>7 bin 850 metrek\u00fcp<\/strong> g\u00f6vde betonu d\u00f6k\u00fclerek rekor seviyeye ula\u015f\u0131ld\u0131\u011f\u0131 bilgisini veren Y\u0131ld\u0131z, &#8220;Bu miktar <strong>1000 mikser betona<\/strong> e\u015fde\u011fer olup, bu miktar betonla <strong>200 konut<\/strong> yap\u0131labilir. Baraj\u0131n g\u00f6vdesinde kullan\u0131lacak <strong>4 milyon metrek\u00fcp<\/strong> betonla <strong>Artvin<\/strong>&#8216;den <strong>Edirne<\/strong>&#8216;ye <strong>13 metre platform geni\u015fli\u011finde<\/strong> beton yol in\u015fa edilebilir. Bu betonla her biri <strong>120 metrekare<\/strong> 5 katl\u0131 10 bin konut yap\u0131labilir.&#8221;dedi.<\/p>\n<p>Y\u0131ld\u0131z, <strong>Yusufeli Baraj\u0131<\/strong>&#8216;n\u0131n \u00fcretece\u011fi enerjinin yan\u0131 s\u0131ra <strong>di\u011fer barajlara da su kayna\u011f\u0131<\/strong> olaca\u011f\u0131na i\u015faret ederek, &#8220;Yusufeli Baraj\u0131, <strong>\u00c7oruh Nehri&#8217;nin<\/strong> getirece\u011fi rusubat\u0131 da \u00f6nemli \u00f6l\u00e7\u00fcde tutarak di\u011fer <strong>barajlar\u0131n \u00f6mr\u00fcn\u00fcn uzamas\u0131n\u0131<\/strong> sa\u011flayacak, <strong>\u00c7oruh Nehri&#8217;nde<\/strong> olu\u015fabilecek ta\u015fk\u0131n riskini de azaltacak.&#8221; de\u011ferlendirmesinde bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Devlet Su \u0130\u015fleri\u00a0(DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, T\u00fcrkiye&#8217;nin vizyon projelerinden\u00a0Yusufeli Baraj\u0131, yap\u0131m\u0131 tamamland\u0131\u011f\u0131nda 275 metre y\u00fcksekli\u011fiyle \u00e7ift e\u011frilikli beton kemer kategorisinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118458,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[77468,56760,5070,52259,26043,26044,76562,54979,1088,77469],"views":215,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118456"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118456"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118456\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118458"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118456"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118456"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}