{"id":118321,"date":"2020-08-10T08:28:10","date_gmt":"2020-08-10T05:28:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118321"},"modified":"2020-08-10T08:28:10","modified_gmt":"2020-08-10T05:28:10","slug":"tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak\/","title":{"rendered":"(Turkish) &#8217;Tucson Electric Power&#8217; K\u00f6m\u00fcr Santrallerini Kademeli Olarak Kapatacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118321\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Amerika Birle\u015fik Devletleri\u2019nin (ABD) Arizona Eyaleti\u2019nde faaliyetlerini s\u00fcrd\u00fcren Tucson Electric Power (TEP), 2035 y\u0131l\u0131na kadar elde etti\u011fi enerjinin % 70\u2019ini g\u00fcne\u015f ve r\u00fczg\u00e2rdan sa\u011flamak ve enerji depolama <img loading=\"lazy\" class=\"alignright wp-image-118323\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak.jpg\" alt=\"\" width=\"320\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak.jpg 783w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak-768x479.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak-500x312.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/tucson-electric-power-komur-santrallerini-kademeli-olarak-kapatacak-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kapasitesini art\u0131rmaya y\u00f6nelik yeni yat\u0131r\u0131mlar ger\u00e7ekle\u015ftirecek.<\/strong><\/h1>\n<p>TEP, \u00f6n\u00fcm\u00fczdeki <strong>15 y\u0131l<\/strong> i\u00e7inde <strong>k\u00f6m\u00fcr santralleri<\/strong>ni kademeli olarak kapatarak, <strong>2,5 GW<\/strong>\u2019l\u0131k yeni <strong>g\u00fcne\u015f<\/strong> ve <strong>r\u00fczg\u00e2r santrali<\/strong> ile <strong>1,4 GW<\/strong> kapasiteli <strong>enerji depolama sistemleri<\/strong>ni hayata ge\u00e7irmeyi planl\u0131yor.<\/p>\n<p><em>PV-Tech<\/em>\u2019de yer alan habere g\u00f6re, <strong>yenilenebilir enerji <\/strong>ve<strong> depolama maliyetleri<\/strong>nin azalmas\u0131n\u0131n yan\u0131 s\u0131ra <strong>\u00e7evresel kayg\u0131lar<\/strong>dan dolay\u0131\u00a0<strong>2035 y\u0131l\u0131na<\/strong> kadar<strong> t\u00fcm k\u00f6m\u00fcr santrallerini<\/strong> kapatmay\u0131 planlayan <strong>TEP<\/strong>, neden oldu\u011fu emisyonlar\u0131<strong> % 80<\/strong> oran\u0131nda azaltmay\u0131 da \u00f6ng\u00f6r\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Amerika Birle\u015fik Devletleri\u2019nin (ABD) Arizona Eyaleti\u2019nde faaliyetlerini s\u00fcrd\u00fcren Tucson Electric Power (TEP), 2035 y\u0131l\u0131na kadar elde etti\u011fi enerjinin % 70\u2019ini g\u00fcne\u015f ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118323,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,24649,50],"tags":[5070,2625,52259,35038,53157,35121,35002,53282,57125,54979,75863],"views":89,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118321"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118321"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118321\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118323"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}