{"id":118301,"date":"2020-08-10T07:44:45","date_gmt":"2020-08-10T04:44:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=118301"},"modified":"2020-08-10T08:48:22","modified_gmt":"2020-08-10T05:48:22","slug":"gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir\/","title":{"rendered":"(Turkish) G\u00fcne\u015f&#8217;e 2021-2025 Aral\u0131\u011f\u0131nda 613 Milyar Dolar K\u00fcresel Yat\u0131r\u0131m Yap\u0131labilir"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/118301\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Virginia&#8217;daki elektrik \u00fcretim ve da\u011f\u0131t\u0131m firmas\u0131 AES&#8217;e g\u00f6re, 2021-2025 y\u0131llar\u0131 aral\u0131\u011f\u0131nda g\u00fcne\u015f enerjisi \u00fcretimine y\u00f6nelik k\u00fcresel olarak 613 milyar dolar yat\u0131r\u0131m yap\u0131labilir.<img loading=\"lazy\" class=\"alignright wp-image-118305\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir.jpg 620w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/gunese-2021-2025-araliginda-613-milyar-dolar-kuresel-yatirim-yapilabilir-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h1>\n<p><strong>AES, Avustralya\u2019da<\/strong> faaliyetlerini s\u00fcrd\u00fcren\u00a0<em>g\u00fcne\u015f enerjisi teknoloji firmas\u0131<\/em> <strong>5B\u2019ye<\/strong> yat\u0131r\u0131m yapmaya haz\u0131rlan\u0131rken\u00a0<strong>5B \u015firketi<\/strong> taraf\u0131ndan sunulan <strong>Maverick teknolojisi<\/strong> ile<strong> geleneksel tesisler<\/strong>e g\u00f6re\u00a0<strong>2 kat<\/strong> <strong>daha fazla enerji<\/strong> sa\u011flan\u0131rken, yeni kaynaklar\u0131n<strong> in\u015fa edilme s\u00fcresi<\/strong> ise <strong>3 kat<\/strong> h\u0131z kazanmaktad\u0131r.<\/p>\n<h2><strong>Prefabrik G\u00fcne\u015f Sistemleri Kurulumu Yap\u0131lacak<\/strong><\/h2>\n<p><strong>5B<\/strong> firmas\u0131 kullan\u0131lan bu <strong>Maverick teknolojisi<\/strong>ni, \u201cd\u00fcnyan\u0131n ilk <strong>prefabrik<\/strong>,<strong> d\u00fc\u015f\u00fck maliyetli<\/strong> ve <strong>% 100<\/strong> <em>ta\u015f\u0131nabilir g\u00fcne\u015f enerjisi sistemi<\/em>\u201d olarak belirtirken h\u0131zla b\u00fcy\u00fcyen<strong> g\u00fcne\u015f<\/strong> ve<strong> depolama<\/strong> pazar\u0131n\u0131n <strong>en aktif yat\u0131r\u0131mc\u0131lar\u0131ndan<\/strong> biri olarak g\u00f6sterilen <strong>AES<\/strong>, Haziran&#8217;da\u00a0<strong>Oahu\u2019da<em>\u00a0<\/em><\/strong><em>2 adet<\/em> yeni <strong>g\u00fcne\u015f enerjisi<\/strong> ve <strong>depolama tesisi kurmak<\/strong> ve<strong> i\u015fletmek<\/strong> \u00fczere \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131.<\/p>\n<p>\u015eu anda yap\u0131lan <strong>2 proje<\/strong> ise <strong>35 MWh<\/strong> depolama alan\u0131na sahip <strong>19,5 MW<\/strong>\u2019l\u0131k bir <strong>fotovoltaik g\u00fcne\u015f santrali<\/strong>, di\u011feri ise<strong> 240 MWh<\/strong>\u2019lik <em>batarya depolama sistemi<\/em>ne sahip olan\u00a0<strong>60 MW<\/strong>\u2019l\u0131k bir ges tesisidir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Virginia&#8217;daki elektrik \u00fcretim ve da\u011f\u0131t\u0131m firmas\u0131 AES&#8217;e g\u00f6re, 2021-2025 y\u0131llar\u0131 aral\u0131\u011f\u0131nda g\u00fcne\u015f enerjisi \u00fcretimine y\u00f6nelik k\u00fcresel olarak 613 milyar dolar yat\u0131r\u0131m yap\u0131labilir. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":118305,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[77339,18838,37690,5070,52674,77342,2625,52259,77344,7440,53157,77345,77341,77338,77340,77343,54979,28951],"views":134,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118301"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=118301"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/118301\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/118305"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=118301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=118301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=118301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}