{"id":117978,"date":"2020-08-03T10:25:32","date_gmt":"2020-08-03T07:25:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117978"},"modified":"2020-08-03T10:25:46","modified_gmt":"2020-08-03T07:25:46","slug":"izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek\/","title":{"rendered":"(Turkish) \u0130zmir Belediyesi Yeni Kuraca\u011f\u0131 Tesis ile At\u0131klar\u0131ndan Enerji \u00dcretecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117978\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130zmir B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkanl\u0131\u011f\u0131&#8217;nca haz\u0131rlanan Entegre Kat\u0131 At\u0131k Y\u00f6netim Plan\u0131na g\u00f6re yakla\u015f\u0131k 312 hektar alan \u00fczerinde evsel ve evsel nitelikteki <strong>kat\u0131 at\u0131klar\u0131n bertaraf<\/strong> ve <strong>ekonomiye yeniden <img loading=\"lazy\" class=\"alignright wp-image-117982\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek.jpg 800w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/izmir-belediyesi-yeni-kuracagi-tesis-ile-atiklarindan-enerji-uretecek-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kazand\u0131r\u0131lmas\u0131<\/strong>na y\u00f6nelik<strong>\u00a024,038 MW<\/strong> kapasiteye sahip &#8220;Entegre Kat\u0131 At\u0131k Bertaraf Tesisi&#8221; yap\u0131lmas\u0131 planlan\u0131yor.<\/h1>\n<p>Yakla\u015f\u0131k olarak <strong>197 milyon lira yat\u0131r\u0131m bedeli<\/strong>ne sahip olacak olan tesisin\u00a0<strong>\u0130zmir<\/strong> \u0130li<strong> G\u00fcney 2 B\u00f6lgesi<\/strong>ne (<em>Menderes, Gaziemir, Karaba\u011flar, Buca, Bal\u00e7ova ve Narl\u0131dere<\/em> il\u00e7eleri)\u00a0g\u00fcnde ortalama olarak<strong> 979 ton at\u0131\u011f\u0131n <\/strong>gelece\u011fi\u00a0tahmin ediliyor.<\/p>\n<p><strong>Hayvansal<\/strong> ve <strong>g\u0131da end\u00fcstrisi<\/strong> at\u0131klar\u0131n\u0131n <strong>Biyometanizasyon Tesisi&#8217;<\/strong>ne al\u0131narak <strong>fermantasyon<\/strong> sonucunda elde edilecek <strong>biyogaz<\/strong>\u00a0<em>Metan gaz\u0131 Elektrik Enerjisi \u00dcretim Tesisi\u2019nde<\/em> elektrik enerjisine d\u00f6n\u00fc\u015f\u00fcm\u00fc sa\u011flanarak <strong>enterkonnekte sisteme<\/strong> aktar\u0131m\u0131 yap\u0131larak gelir elde edilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkanl\u0131\u011f\u0131&#8217;nca haz\u0131rlanan Entegre Kat\u0131 At\u0131k Y\u00f6netim Plan\u0131na g\u00f6re yakla\u015f\u0131k 312 hektar alan \u00fczerinde evsel ve evsel nitelikteki kat\u0131 at\u0131klar\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[77032,52614,64244,57885,5527,52259,77029,77027,77034,77035,77030,77033,4946,77028,77037,2689,61010,77031,16437,77036],"views":173,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117978"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117978"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117978\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117982"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}