{"id":117901,"date":"2020-08-01T02:45:15","date_gmt":"2020-07-31T23:45:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117901"},"modified":"2020-08-01T02:45:41","modified_gmt":"2020-07-31T23:45:41","slug":"turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin Kurulu G\u00fcc\u00fc \u0130lk 6 Ayda 978 MW Artarak 92 GW\u2019a Ula\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117901\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye\u2019nin elektrikteki lisansl\u0131 kurulu g\u00fcc\u00fc Haziran sonu itibar\u0131yla 92,097 MW\u2019a y\u00fckseldi. Y\u0131l\u0131n ilk 6 ay\u0131nda kurulu g\u00fc\u00e7teki art\u0131\u015f, bu y\u0131l ge\u00e7ici kabul\u00fc yap\u0131larak i\u015fletmeye al\u0131nan HES\u2019lerin 652 MW katk\u0131s\u0131yla 978 MW <img loading=\"lazy\" class=\"alignright wp-image-117903\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti.jpg\" alt=\"\" width=\"320\" height=\"208\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti.jpg 1040w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti-768x498.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti-1024x665.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti-500x325.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/08\/turkiye-nin-kurulu-gucu-ilk-6-ayda-978-mw-artarak-92-gwa-ulasti-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>art\u0131\u015f g\u00f6sterdi. RES\u2019lerin kurulu g\u00fc\u00e7 art\u0131\u015f\u0131na katk\u0131s\u0131 ise ayn\u0131 d\u00f6nemde 286 MW oldu. Yat\u0131r\u0131mlar\u0131n yo\u011funla\u015ft\u0131\u011f\u0131 biyok\u00fctlede ise art\u0131\u015f 28 MW olarak kay\u0131tlara yans\u0131d\u0131.<\/h1>\n<p>Y\u0131l\u0131n ilk <strong>6 ayl\u0131k d\u00f6neminde<\/strong> <em>lisansl\u0131 g\u00fcne\u015f santralleri<\/em>nde i\u015fletmeye al\u0131nan kapasite <strong>10 MW<\/strong> olurken, <em>g\u00fcne\u015fte lisanss\u0131z santraller<\/em> dahil toplam kurulu g\u00fc\u00e7<strong> 6,166 MW<\/strong> oldu.<\/p>\n<p>Bu y\u0131l\u0131n <strong>2&#8217;inci yar\u0131s\u0131nda<\/strong>, y\u0131l sonunda sona erecek <strong>YEKDEM<\/strong>\u2019e giri\u015f i\u00e7in <strong>in\u015fas\u0131 devam eden<\/strong> <em>r\u00fczgar ve biyok\u00fctle\/gaz santralleri<\/em> ile birlikte <strong>jeotermal santrallerin<\/strong> a\u011f\u0131rl\u0131kta olmas\u0131 bekleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin elektrikteki lisansl\u0131 kurulu g\u00fcc\u00fc Haziran sonu itibar\u0131yla 92,097 MW\u2019a y\u00fckseldi. Y\u0131l\u0131n ilk 6 ay\u0131nda kurulu g\u00fc\u00e7teki art\u0131\u015f, bu y\u0131l ge\u00e7ici kabul\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117903,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53,49,47,50],"tags":[1678,53114,52259,58160,34926,16077,4995,36184,76949,76948,474,76950,8275],"views":124,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117901"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117901"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117901\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117903"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117901"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117901"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}