{"id":117781,"date":"2020-07-29T14:10:39","date_gmt":"2020-07-29T11:10:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117781"},"modified":"2020-07-29T14:11:50","modified_gmt":"2020-07-29T11:11:50","slug":"aksa-enerjiden-sanliurfada-uretimi-durdurma-karari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari\/","title":{"rendered":"(Turkish) Aksa Enerji&#8217;den \u015eanl\u0131urfa&#8217;da \u00dcretimi Durdurma Karar\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117781\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Aksa Enerji taraf\u0131ndan &#8216;rekabet\u00e7i bir fiyattan elektrik \u00fcretimi ger\u00e7ekle\u015ftirme imkan\u0131 <img loading=\"lazy\" class=\"alignright wp-image-117783\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/aksa-enerjiden-sanliurfada-uretimi-durdurma-karari-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>azald\u0131\u011f\u0131&#8217; nedeniyle \u015eanl\u0131urfa Do\u011fal Gaz Kombine \u00c7evrim Santrali&#8217;nde \u00fcretimi durdurma karar\u0131 al\u0131nd\u0131. \u015eirket karara ili\u015fkin KAP&#8217;a bildirimde bulundu.<\/h1>\n<p>Ge\u00e7ti\u011fimiz y\u0131l\u00a0<strong>ENKA Enerji, Alarko <\/strong>ve <strong>Aksa<\/strong>\u2019n\u0131n hayata ge\u00e7irdi\u011fi <strong>\u00fcretimi durdurma karar\u0131<\/strong> bu kez <strong>\u015eanl\u0131urfa\u2019dan<\/strong> geldi.\u00a0Aksa Enerji, <strong>\u015eanl\u0131urfa Do\u011fal Gaz Kombine \u00c7evrim Santrali<\/strong>\u2019nin ge\u00e7ici s\u00fcreyle \u00fcretimini durdurmaya <strong>TE\u0130A\u015e\u2019a<\/strong> ba\u015fvurusunu yapt\u0131. <strong>Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP)<\/strong> yap\u0131lan bildirimde ise <strong>Aksa Enerji<\/strong> <span style=\"text-decoration: underline;\">\u015fu ifadelere yer verdi:<\/span><\/p>\n<p>&#8220;<strong>147 MW<\/strong> kurulu g\u00fc\u00e7teki <strong>\u015eanl\u0131urfa Do\u011fal Gaz Kombine \u00c7evrim Santrali<\/strong>\u2019nin <strong>serbest piyasa ko\u015fullar\u0131<\/strong>nda T\u00fcrkiye s\u0131n\u0131rlar\u0131 i\u00e7erisinde <strong>rekabet\u00e7i bir fiyattan elektrik \u00fcretimi<\/strong> ger\u00e7ekle\u015ftirme <strong>imkan\u0131 azald\u0131\u011f\u0131ndan<\/strong> ge\u00e7ici <em>s\u00fcreyle \u00fcretimini durdurmak<\/em> i\u00e7in <strong>TE\u0130A\u015e\u2019a<\/strong> ba\u015fvuru yap\u0131lm\u0131\u015ft\u0131r.&#8221; denildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji taraf\u0131ndan &#8216;rekabet\u00e7i bir fiyattan elektrik \u00fcretimi ger\u00e7ekle\u015ftirme imkan\u0131 azald\u0131\u011f\u0131&#8217; nedeniyle \u015eanl\u0131urfa Do\u011fal Gaz Kombine \u00c7evrim Santrali&#8217;nde \u00fcretimi durdurma karar\u0131 al\u0131nd\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[143,1571,28626,54036,5070,52259,76835,60520,5436,2097,76834,1582],"views":105,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117781"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117781"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117781\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117783"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}