{"id":117611,"date":"2020-07-27T10:34:15","date_gmt":"2020-07-27T07:34:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117611"},"modified":"2020-07-27T10:34:15","modified_gmt":"2020-07-27T07:34:15","slug":"canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak\/","title":{"rendered":"(Turkish) \u00c7anakkale Bo\u011faz\u0131 ve \u0130zmit K\u00f6rfezi Ge\u00e7i\u015f Kablo Ba\u011flant\u0131 \u0130halesi Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117611\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan yenilenebilir enerji\u00a0 entegrasyonu projesi kapsam\u0131nda, \u00c7anakkale Bo\u011faz (Lapseki 3-S\u00fctl\u00fcce 3)\u00a0 ge\u00e7i\u015fi ve \u0130zmit K\u00f6rfez (Hersek-Dilovas\u0131) ge\u00e7i\u015fi denizalt\u0131 kablo ba\u011flant\u0131 i\u015fleri i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-117613\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak.jpg\" alt=\"\" width=\"320\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak.jpg 605w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak-500x283.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/canakkale-bogazi-ve-izmit-korfezi-gecis-kablo-baglanti-ihalesi-yapilacak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ihale a\u00e7t\u0131. TE\u0130A\u015e&#8217;\u0131n s\u00f6z konusu ihaleye ili\u015fkin ilan\u0131 Resmi Gazete&#8217;de yay\u0131mland\u0131.<\/h1>\n<p><strong>TE\u0130A\u015e<\/strong>&#8216;\u0131n, <strong>Uluslararas\u0131 \u0130mar ve Kalk\u0131nma Bankas\u0131<\/strong>ndan <strong>Yenilenebilir Enerji Entegrasyonu Projesi<\/strong> \u2013 <strong>Ek Finansman kapsam\u0131<\/strong>nda bir ikraz temin etmi\u015ftir. S\u00f6z konusu bu <strong>ikraz gelirinin<\/strong> bir k\u0131sm\u0131 <em><strong>400 kV<\/strong> \u00c7anakkale Bo\u011faz (Lapseki 3-S\u00fctl\u00fcce 3) Ge\u00e7i\u015fi (Lot 1)<\/em> &amp; <em>\u0130zmit K\u00f6rfez (Hersek-Dilovas\u0131) Ge\u00e7i\u015fi ve ba\u011flant\u0131l\u0131 Kara Kablolar\u0131<\/em> (Lot 2) <em>Denizalt\u0131 Kablo Ba\u011flant\u0131 \u0130\u015fleri (DB.KAB.19) s\u00f6zle\u015fmesi<\/em> kapsam\u0131ndaki <strong>uygun \u00f6demeler<\/strong> i\u00e7in kullan\u0131lmas\u0131 planland\u0131.<\/p>\n<p><strong>TE\u0130A\u015e taraf\u0131ndan<\/strong>\u00a0<strong>teklif vermeye uygun istekliler<\/strong>\u00a0belirtilen\u00a0<strong>tesis\/yap\u0131m ve\u00a0 devreye alma<\/strong> i\u015fi i\u00e7in kapal\u0131 teklif vermeye davet edildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan yenilenebilir enerji\u00a0 entegrasyonu projesi kapsam\u0131nda, \u00c7anakkale Bo\u011faz (Lapseki 3-S\u00fctl\u00fcce 3)\u00a0 ge\u00e7i\u015fi ve \u0130zmit K\u00f6rfez (Hersek-Dilovas\u0131) ge\u00e7i\u015fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[76598,76600,52674,52259,2054,76601,76599,1388,1582,47585,14882,76597],"views":312,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117611"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117611"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117611\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117613"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}