{"id":11759,"date":"2013-06-10T17:39:45","date_gmt":"2013-06-10T14:39:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=11759"},"modified":"2013-06-10T17:39:45","modified_gmt":"2013-06-10T14:39:45","slug":"yildiz-dinara-termik-santral-kuracagiz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yildiz-dinara-termik-santral-kuracagiz\/","title":{"rendered":"(Turkish) Y\u0131ld\u0131z: \u201cDinar\u2019a Termik Santral Kuraca\u011f\u0131z\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/11759\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji ve Tabii Kaynaklar Bakan\u0131 Y\u0131ld\u0131z Dinar\u2019a 5 milyar dolar yat\u0131r\u0131mla 3 bin 500 MW g\u00fcc\u00fcnde termik santral kurmay\u0131 hedeflediklerini s\u00f6yledi. Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, Maden Tetkik ve Arama Kurumunun (MTA) Afyon Dinar \u00e7evresinde 5 y\u0131ld\u0131r devam eden sondaj \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamland\u0131\u011f\u0131n\u0131 ve Afyon Dinar\u2019daki linyit rezervinin 950 milyon ton oldu\u011funun tespit edildi\u011fini belirterek, \u201cB\u00f6lgede yakla\u015f\u0131k 5 milyar dolarl\u0131k yat\u0131r\u0131mla 3 bin 500 megavat (MW) g\u00fcc\u00fcnde termik santral kurmay\u0131 hedefliyoruz. Bu, santral in\u015fas\u0131 ve maden sahas\u0131nda 6-7 bin ki\u015filik istihdam demektir\u201d ifadelerini kulland\u0131.<\/strong><\/p>\n<p>Y\u0131ld\u0131z, yapt\u0131\u011f\u0131 yaz\u0131l\u0131 a\u00e7\u0131klamada, y\u00fcksek kalorili yerli linyite yap\u0131lacak yat\u0131r\u0131mla hem Afyon\u2019un hem de T\u00fcrkiye\u2019nin kazanaca\u011f\u0131n\u0131 bildirdi.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/taner-yildiz-tanap.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9755\" title=\"taner-yildiz-tanap\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/taner-yildiz-tanap-300x214.jpg\" alt=\"\" width=\"300\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/taner-yildiz-tanap-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/taner-yildiz-tanap-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/taner-yildiz-tanap.jpg 461w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>T\u00fcrkiye\u2019nin 2023 y\u0131l\u0131nda elektrik \u00fcretiminin 3\u2032te 1\u2032ini k\u00f6m\u00fcrden kar\u015f\u0131lama hedefi oldu\u011funu an\u0131msatan Y\u0131ld\u0131z, \u201cBunun i\u00e7in yerli k\u00f6m\u00fcr santrali kurulu g\u00fcc\u00fcn\u00fc, 10 y\u0131l sonra 30 bin MW\u2019a \u00e7\u0131karmak istiyoruz. Af\u015fin Elbistan, Konya Karap\u0131nar, Afyon Dinar, Eski\u015fehir Alpu ve T\u00fcrkiye K\u00f6m\u00fcr \u0130\u015fletmelerinin (TK\u0130) elindeki k\u00f6m\u00fcr sahalar\u0131nda yerli k\u00f6m\u00fcre dayal\u0131 termik santraller yap\u0131lacak.<\/p>\n<p>Son olarak TK\u0130\u2019nin Bing\u00f6l Karl\u0131ova\u2019daki k\u00f6m\u00fcr sahas\u0131n\u0131n santral kurma \u015fart\u0131yla \u00f6zel sekt\u00f6re devri ihalesini ger\u00e7ekle\u015ftirmi\u015ftik. \u00d6zel sekt\u00f6r Karl\u0131ova\u2019ya 80 milyon ton rezervli sahada 700 milyon dolar yat\u0131r\u0131mla 240 MW\u2019l\u0131k termik santral kuracak. Yerli k\u00f6m\u00fcre dayal\u0131 yap\u0131lacak b\u00fct\u00fcn termik santrallerle, y\u0131ll\u0131k en az 12 milyar dolarl\u0131k do\u011falgaz ithalinin \u00f6n\u00fcne ge\u00e7me hedefimiz var\u201d bilgisini verdi.<\/p>\n<h2>5 milyar dolarl\u0131k yat\u0131r\u0131m hedefliyoruz<\/h2>\n<p>Y\u0131ld\u0131z, MTA\u2019n\u0131n 5 y\u0131ld\u0131r yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalar sonucunda Afyon Dinar\u2019daki linyit rezervlerinin 950 milyon ton oldu\u011funu tespit ettiklerini belirterek, \u201cB\u00f6lgede yakla\u015f\u0131k 5 milyar dolarl\u0131k yat\u0131r\u0131mla 3 bin 500 MW g\u00fcc\u00fcnde termik santral kurmay\u0131 hedefliyoruz. Bu, santral in\u015fas\u0131 ve maden sahas\u0131nda 6-7 bin ki\u015filik istihdam demektir\u201d de\u011ferlendirmesinde bulundu.<\/p>\n<p>D\u00fcnyadaki petrol ve do\u011falgaz rezervlerine bak\u0131ld\u0131\u011f\u0131nda, petrol rezervlerinin 54, do\u011falgaz rezervlerinin 63 y\u0131l, linyit rezervlerinin ise 230 y\u0131l \u00f6mr\u00fc oldu\u011funa vurgu yapan Y\u0131ld\u0131z, linyit k\u00f6m\u00fcr\u00fcyle yap\u0131lan elektrik \u00fcretiminin, hem daha ucuz olmas\u0131 hem de yerli kayna\u011fa dayanmas\u0131 nedeniyle daha da \u00f6nem kazand\u0131\u011f\u0131n\u0131 ifade etti.<\/p>\n<p>Y\u0131ld\u0131z, a\u00e7\u0131klamas\u0131n\u0131 \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc:<\/p>\n<p>\u201cBiz \u00e7evreye ra\u011fmen de\u011fil, \u00e7evre yat\u0131r\u0131mlar\u0131yla birlikte, temiz k\u00f6m\u00fcr teknolojileri kullanarak bu enerji yat\u0131r\u0131mlar\u0131n\u0131 ger\u00e7ekle\u015ftiriyoruz. Son 10 y\u0131lda 1,2 milyar liral\u0131k termik santral \u00e7evre yat\u0131r\u0131m\u0131 yapt\u0131k. \u00d6n\u00fcm\u00fczdeki d\u00f6nemde 1 milyar liran\u0131n \u00fczerinde yat\u0131r\u0131m daha ger\u00e7ekle\u015ftirece\u011fiz. Bu yat\u0131r\u0131mlar eski santrallerle alakal\u0131. Yeni yap\u0131lan termik santrallerde, kurulu\u015f a\u015famas\u0131nda bu yat\u0131r\u0131mlar\u0131 tamamlama \u015fart\u0131n\u0131 ko\u015fuyoruz. Bacagaz\u0131 k\u00fck\u00fcrt ar\u0131tma tesisleri, elektrofiltreler, k\u00fcl stoklama sahas\u0131 yat\u0131r\u0131mlar\u0131, hava kalitesi \u00f6l\u00e7\u00fcm istasyonlar\u0131 ve at\u0131ksu ar\u0131tma tesisleri bu a\u015famada tamamlan\u0131yor.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/06\/10\/yildiz-dinara-termik-santral-kuracagiz\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji ve Tabii Kaynaklar Bakan\u0131 Y\u0131ld\u0131z Dinar\u2019a 5 milyar dolar yat\u0131r\u0131mla 3 bin 500 MW g\u00fcc\u00fcnde termik santral kurmay\u0131 hedeflediklerini s\u00f6yledi. Enerji ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9755,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[5859,710,63,67,165,117,5384,5860,4860,667,1748,438],"views":865,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11759"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=11759"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11759\/revisions"}],"predecessor-version":[{"id":11760,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11759\/revisions\/11760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9755"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=11759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=11759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=11759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}