{"id":117560,"date":"2020-07-25T12:06:15","date_gmt":"2020-07-25T09:06:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117560"},"modified":"2020-07-25T12:06:32","modified_gmt":"2020-07-25T09:06:32","slug":"ilisu-baraji-ndan-turkiye-ekonomisine-2-ayda-200-milyon-liralik-katki","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilisu-baraji-ndan-turkiye-ekonomisine-2-ayda-200-milyon-liralik-katki\/","title":{"rendered":"(Turkish) &#8217;Il\u0131su Baraj\u0131&#8217;ndan T\u00fcrkiye Ekonomisine 2 Ayda 200 Milyon Liral\u0131k Katk\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117560\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye&#8217;nin 4&#8217;\u00fcnc\u00fc b\u00fcy\u00fck hidroelektrik santrali <strong>Il\u0131su Prof. Dr. Veysel Ero\u011flu Baraj\u0131 ve Hidroelektrik Santrali (HES)<\/strong> ile 2 ayda 400 milyon kilovatsaat elektrik enerjisi <img loading=\"lazy\" class=\"alignright wp-image-117564\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/ilisu-baraji-ndan-ekonomiye-2-ayda-200-milyon-lira-katki.jpg\" alt=\"\" width=\"320\" height=\"223\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/ilisu-baraji-ndan-ekonomiye-2-ayda-200-milyon-lira-katki.jpg 628w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/ilisu-baraji-ndan-ekonomiye-2-ayda-200-milyon-lira-katki-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/ilisu-baraji-ndan-ekonomiye-2-ayda-200-milyon-lira-katki-500x348.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/ilisu-baraji-ndan-ekonomiye-2-ayda-200-milyon-lira-katki-72x50.jpg 72w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00fcretimi ger\u00e7ekle\u015ftirerek \u00fclke ekonomisine yakla\u015f\u0131k 200 milyon lira katk\u0131 sa\u011flad\u0131.<\/h1>\n<p>\u0130lk t\u00fcrbinin <strong>19 May\u0131s 2020<\/strong> tarihinde <strong>devreye al\u0131nd\u0131\u011f\u0131 baraj<\/strong>, ilk etapta <strong>200 megavat<\/strong> kurulu g\u00fcc\u00fcndeki <strong>t\u00fcrbiniyle \u00fcretime<\/strong> ba\u015flarken\u00a0kurulu g\u00fcc\u00fc ula\u015facak\u00a0<strong>1200 megavat<\/strong> g\u00fcc\u00fcndeki yat\u0131r\u0131m\u0131n y\u0131ll\u0131k ortalama <strong>4 milyar 120 milyon kilovatsaat<\/strong> enerji \u00fcretece\u011fi belirtilmektedir.<\/p>\n<p><strong>DS\u0130<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Kaya YILDIZ<\/strong>\u00a0konuya y\u00f6nelik yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, <strong>Il\u0131su Baraj\u0131<\/strong>&#8216;nda \u015fimdiye kadar toplam <strong>3 \u00fcnitenin<\/strong> devreye al\u0131nd\u0131\u011f\u0131n\u0131 ve bu \u00fcnitelerin<strong> ge\u00e7ici kabul\u00fcn\u00fcn<\/strong> yap\u0131larak <strong>Elektrik \u00dcretim A\u015e&#8217;ye (E\u00dcA\u015e)<\/strong> devredildi\u011fini dile getirdi. Y\u0131ld\u0131z, &#8220;Barajda <strong>2 ay<\/strong> i\u00e7inde <strong>400 milyon kilovatsaat<\/strong> enerji \u00fcretilerek \u00fclke ekonomisine yakla\u015f\u0131k <strong>200 milyon lira<\/strong> katk\u0131 sa\u011fland\u0131. Geriye kalan di\u011fer <strong>3 \u00fcnitenin<\/strong> ise <strong>test \u00e7al\u0131\u015fmalar\u0131<\/strong> s\u00fcr\u00fcyor. Bu y\u0131l baraj\u0131n <strong>t\u00fcm \u00fcnitelerinin devreye al\u0131narak<\/strong> tamamlanmas\u0131yla <strong>\u00fclke ekonomisine<\/strong> y\u0131lda <strong>2,8 milyar lira katk\u0131<\/strong> sa\u011flayacakt\u0131r.&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye&#8217;nin 4&#8217;\u00fcnc\u00fc b\u00fcy\u00fck hidroelektrik santrali Il\u0131su Prof. Dr. Veysel Ero\u011flu Baraj\u0131 ve Hidroelektrik Santrali (HES) ile 2 ayda 400 milyon kilovatsaat elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117564,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[1091,53114,5070,75868,52259,26043,26044,76563,76561,4278,76562,76564],"views":111,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117560"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117560"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117560\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117564"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}