{"id":117553,"date":"2020-07-25T11:46:07","date_gmt":"2020-07-25T08:46:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117553"},"modified":"2020-07-25T11:46:57","modified_gmt":"2020-07-25T08:46:57","slug":"akkuyu-ngs-nin-2inci-unite-buhar-jenerator-kolektorleri-sahaya-sevk-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-2inci-unite-buhar-jenerator-kolektorleri-sahaya-sevk-edildi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 2&#8217;inci \u00dcnite Buhar Jenerat\u00f6r Kolekt\u00f6rleri Sahaya Sevk Edildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117553\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu&#8217;nun m\u00fchendislik b\u00f6l\u00fcm\u00fc\u00a0Atomenergomash A\u015e.&#8217;den yap\u0131lan a\u00e7\u0131klamada,\u00a0Akkuyu NGS\u00a0i\u00e7in ekipman \u00fcretimi ve sevkiyat\u0131 devam ediyor. Kolekt\u00f6rlerin sahaya sevkiyat i\u015flemleri, \u015firketin makine b\u00f6l\u00fcm\u00fcn\u00fcn bir par\u00e7as\u0131 olan AEM-Teknoloji&#8217;nin Petrozavodsk \u015fubesi taraf\u0131ndan yap\u0131ld\u0131.<\/h1>\n<p><strong>Buhar Jenerat\u00f6r\u00fc&#8217;<\/strong>n\u00fcn ayr\u0131lmaz par\u00e7as\u0131 olan kolekt\u00f6r\u00fcn <strong>1&#8217;inci g\u00fcvenlik s\u0131n\u0131f\u0131 ekipmanlar\u0131<\/strong> aras\u0131nda yer ald\u0131\u011f\u0131na i\u015faret edilen a\u00e7\u0131klamada, &#8220;Bir g\u00fc\u00e7 \u00fcnitesinde teslimat kapsam\u0131nda her bir <strong>buhar jenerat\u00f6r\u00fc<\/strong>nde iki olmak \u00fczere<strong> 8\u00a0kollekt\u00f6r\u00a0g\u00f6vdesi<\/strong> yer al\u0131yor. Toplam y\u00fcksekli\u011fi <strong>5 metre<\/strong>den, \u00e7ap\u0131 <img loading=\"lazy\" class=\"alignright wp-image-117557\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi.jpg 777w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-nin-ikinci-unitesinin-buhar-jeneratoru-kolektorleri-sahaya-sevk-edildi-80x45.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>ise <strong>1 metreden<\/strong> fazla olan kolekt\u00f6rler, reakt\u00f6r\u00fcn<strong> 1&#8217;inci<\/strong> ve <strong>2&#8217;inci<\/strong> devrelerinin <strong>so\u011futucular\u0131<\/strong> aras\u0131ndaki <strong>\u0131s\u0131 de\u011fi\u015fimini<\/strong> ger\u00e7ekle\u015ftiriyor. \u00dcretim s\u00fcrecinde, <strong>d\u00f6vme metal \u00e7ubuklar<\/strong> mekanik i\u015fleme tabi tutuluyor, <strong>i\u00e7 y\u00fczeye paslanmay\u0131 \u00f6nleyici<\/strong> <em>antikorozif plakaj<\/em> uygulan\u0131yor. G\u00f6vde par\u00e7alar\u0131n\u0131n kayna\u011f\u0131 yap\u0131l\u0131yor ve \u0131s\u0131l i\u015flem ger\u00e7ekle\u015ftiriliyor. <strong>Bir kolekt\u00f6r\u00fcn kaynak<\/strong> ve <strong>y\u00fczey kaplama i\u015flemi<\/strong> yap\u0131l\u0131rken <strong>2 tondan<\/strong> fazla <strong>kaynak malzemesi<\/strong> t\u00fcketiliyor. \u00dcretimi tamamlanm\u0131\u015f bir kolekt\u00f6r\u00fcn a\u011f\u0131rl\u0131\u011f\u0131 ise <strong>16 tonu<\/strong> a\u015f\u0131yor. <strong>\u00dcr\u00fcn imalat\u0131<\/strong> yap\u0131l\u0131rken her a\u015famas\u0131nda, g\u00f6rsel <strong>\u00f6l\u00e7\u00fcm<\/strong> ve <strong>ultrasonik test<\/strong>, <strong>radyografi<\/strong> ve <strong>renk denetimi<\/strong> de dahil olmak \u00fczere <strong>kalite kontrol\u00fc<\/strong> ger\u00e7ekle\u015ftiriliyor.&#8221;denildi.<\/p>\n<p><strong>Akkuyu NGS<\/strong>&#8216;nin in\u015fas\u0131na ili\u015fkin h\u00fck\u00fcmetler aras\u0131 anla\u015fma <strong>Rusya<\/strong> ile <strong>2010<\/strong> y\u0131l\u0131nda imzalanm\u0131\u015ft\u0131. Toplam <strong>4 bin 800 megavat<\/strong> kurulu g\u00fcce sahip <strong>4 reakt\u00f6r<\/strong>den olu\u015facak santralin <strong>1&#8217;inci \u00fcnitesi<\/strong>nin <strong>2023 y\u0131l\u0131nda<\/strong> devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu&#8217;nun m\u00fchendislik b\u00f6l\u00fcm\u00fc\u00a0Atomenergomash A\u015e.&#8217;den yap\u0131lan a\u00e7\u0131klamada,\u00a0Akkuyu NGS\u00a0i\u00e7in ekipman \u00fcretimi ve sevkiyat\u0131 devam ediyor. Kolekt\u00f6rlerin sahaya sevkiyat i\u015flemleri, \u015firketin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117557,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[46141,3019,42302,76558,76560,76559,53114,52259,53348,76557],"views":150,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117553"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117553"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117553\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117557"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}