{"id":117377,"date":"2020-07-21T22:43:58","date_gmt":"2020-07-21T19:43:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117377"},"modified":"2020-07-21T22:45:48","modified_gmt":"2020-07-21T19:45:48","slug":"turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak\/","title":{"rendered":"(Turkish) T\u00fcrk Ak\u0131m Hatt\u0131&#8217;ndan 27 Temmuz -10 A\u011fustos Aras\u0131 Teslimat Yap\u0131lmayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117377\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Boru Hatlar\u0131 ile Petrol Ta\u015f\u0131ma A.\u015e. (BOTA\u015e) taraf\u0131ndan T\u00fcrkAk\u0131m Do\u011falgaz Boru Hatt\u0131nda 27 Temmuz-10 A\u011fustos 2020 aras\u0131nda yap\u0131lacak planl\u0131 bak\u0131m-onar\u0131m \u00e7al\u0131\u015fmalar\u0131 nedeniyle \u0130letim \u015eebekesine s\u00f6z<strong><img loading=\"lazy\" class=\"alignright wp-image-117379\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak.jpg 808w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turk-akim-hattindan-27-temmuz-10-agustos-arasi-teslimat-yapilmayacak-80x45.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/><\/strong> konusu boru hatt\u0131yla do\u011falgaz teslimat\u0131 yap\u0131lmayaca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/h1>\n<p><strong>BOTA\u015e<\/strong>&#8216;\u0131n konu ile ilgili duyurusuna g\u00f6re, <strong>T\u00fcrkAk\u0131m Do\u011falgaz Boru Hatt\u0131<\/strong> iletim operat\u00f6rleri ile var\u0131lan mutabakat \u00e7er\u00e7evesinde, <strong>27 Temmuz-10 A\u011fustos 2020 (360 saat)<\/strong> tarihleri aras\u0131nda ger\u00e7ekle\u015ftirilecek <strong>planl\u0131 bak\u0131m-onar\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> nedeniyle <strong>BOTA\u015e \u0130letim \u015eebekesi<\/strong>ne s\u00f6z\u00a0 konusu boru hatt\u0131 ile <strong>do\u011falgaz teslimat\u0131<\/strong> yap\u0131lmayacak.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, &#8220;Bu itibarla, belirtilen tarihlerdeki \u00e7al\u0131\u015fmalar s\u00fcresince <strong>T\u00fcrk Ak\u0131m K\u0131y\u0131k\u00f6y Giri\u015f Noktas\u0131<\/strong>n\u0131 ve ilgili <strong>Transfer Noktalar\u0131n\u0131<\/strong> kullanan Ta\u015f\u0131tan \u015firketlerin <strong>TMB de\u011ferlerini &#8220;0 (s\u0131f\u0131r)&#8221; Sm3<\/strong> olu\u015fturmalar\u0131 gerekmektedir.&#8221; denildi.<\/p>\n<p>BOTA\u015e, s\u00f6z konusu<strong> \u00e7al\u0131\u015fmalar s\u00fcresince<\/strong> <em>\u0130letim \u015eebekesi arz-talep dengesi<\/em>nde herhangi bir olumsuzluk \u00f6ng\u00f6r\u00fclmedi\u011fini de belirtti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Boru Hatlar\u0131 ile Petrol Ta\u015f\u0131ma A.\u015e. (BOTA\u015e) taraf\u0131ndan T\u00fcrkAk\u0131m Do\u011falgaz Boru Hatt\u0131nda 27 Temmuz-10 A\u011fustos 2020 aras\u0131nda yap\u0131lacak planl\u0131 bak\u0131m-onar\u0131m \u00e7al\u0131\u015fmalar\u0131 nedeniyle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117379,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,44],"tags":[56755,19488,76388,54036,73900,52259,76385,73899,76386,76387,37025],"views":144,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117377"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117377"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117377\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117379"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}