{"id":117227,"date":"2020-07-18T23:04:11","date_gmt":"2020-07-18T20:04:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=117227"},"modified":"2020-07-18T23:04:19","modified_gmt":"2020-07-18T20:04:19","slug":"manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak\/","title":{"rendered":"(Turkish) Manisa\u2019ya 4,5 MW G\u00fcc\u00fcnde Turgutlu Biyogaz Tesisi Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/117227\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Turgutlu Biyogaz Enerji taraf\u0131ndan Manisa\u2019n\u0131n Turgutlu il\u00e7esinde g\u00fcnde 592 ton at\u0131ktan elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek 4,5 MW kapasiteye sahip biyogaz tesisi <strong><img loading=\"lazy\" class=\"alignright wp-image-117231\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/manisa-ya-45-mw-gucunde-turgutlu-biyogaz-tesisi-kurulacak-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong>kurulacak.<\/h1>\n<p><strong>Turgutlu Biyogaz Enerji \u00dcretim A.\u015e.<\/strong> taraf\u0131ndan <strong>Manisa<\/strong> \u0130li, <strong>Turgutlu<\/strong> il\u00e7esi, <strong>\u0130zzettin Mahallesi<\/strong>\u2019nde <strong>Turgutlu Biyogaz Enerji Santrali (4,620 MWm\/4,503MWe\/4,473MWt)<\/strong> kurulup i\u015fletilmesi planlan\u0131yor.<\/p>\n<p><strong>4,9 milyon dolar<\/strong> yat\u0131r\u0131m bedeline <strong>sahip olacak proje kapsam\u0131nda<\/strong> g\u00fcnde<strong> 591,5 ton<\/strong> <em>b\u00fcy\u00fckba\u015f\u00a0hayvan ve tavuk d\u0131\u015fk\u0131lar\u0131<\/em> i\u015flenerek <strong>190 ton<\/strong> biyogaz elde edilecek. Elde edilen biyogazdan da <strong>3 adet<\/strong> elektrik \u00fcreten <strong>gaz motorlar\u0131yla elektrik enerjisi<\/strong> <strong>(4,503 MWe)<\/strong> ve <strong>\u0131s\u0131 enerjisi (4,473 MWt)<\/strong> \u00fcretilecek. Ayr\u0131ca <strong>s\u0131v\u0131<\/strong> olarak g\u00fcnde <strong>1.043 ton<\/strong> fermente \u00fcr\u00fcn ve <strong>72 ton\/g\u00fcn<\/strong> <em>kat\u0131 fermente \u00fcr\u00fcn<\/em> elde edilecek. <strong>Proje kapsam\u0131nda<\/strong> gerekli olan <strong>su ise yeralt\u0131 kuyular\u0131ndan <\/strong>kar\u015f\u0131lanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Turgutlu Biyogaz Enerji taraf\u0131ndan Manisa\u2019n\u0131n Turgutlu il\u00e7esinde g\u00fcnde 592 ton at\u0131ktan elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek 4,5 MW kapasiteye sahip biyogaz tesisi kurulacak. Turgutlu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":117231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[64246,64244,43693,52657,76212,62540,76214,5070,64020,52259,76213,2191,43694,76211,76210],"views":567,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117227"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=117227"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/117227\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/117231"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=117227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=117227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=117227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}